Laserfiche WebLink
SA N .PJ 0 A Q U IN Environmental Health Department <br /> — COUNTY— <br /> PRIOR TO FINAL APPROVAL: <br /> 8. The following items must be completed prior to scheduling the final inspection: <br /> a. An accurate and drawn to scale as-built drawing, which indicates the location of the UST system <br /> (underground storage tanks, piping, auxiliary and monitoring equipment) with respect to buildings <br /> or other landmarks, per CCR 2711 (a)(8), must be submitted to EHD. <br /> b. Copies of any required installation checklists (tank, etc.) must be submitted to EHD. <br /> c. The designated operator (DO) training requirement must be satisfied , per CCR 2715(0. <br /> d . Submit to CERS all applicable hazardous materials, hazardous waste, and UST submittals. The <br /> submittal must be approved by EHD. <br /> 9. A " UST Certification of Installation/Modification" form for installed tank systems shall be submitted into <br /> CERS by the owner or operator, pursuant to CCR 2635(d). <br /> 10. All outstanding up-to-date fees must be paid prior to receiving the final approval to operate. <br /> This permit expires at the end of the calendar year. A request for extension to this permit must be received <br /> by December 31 , 2021 . <br /> If you have any questions, please call Elianna Florido at (209) 616-3050 . <br /> Thank you , <br /> Frederick Ernest <br /> Environmental Health Specialist <br /> Cc: Richard Walton, Walton Engineering: r.walton@waltonengineering.com <br /> 4 of <br />