My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0042258
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
4300
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0042258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2021 4:01:34 PM
Creation date
8/5/2021 3:13:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0042258
PE
4372
STREET_NUMBER
4300
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
17956021
ENTERED_DATE
7/8/2021 12:00:00 AM
SITE_LOCATION
4300 E MARIPOSA RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL ENGINEERING SERVICES PROPOSAL(Soils Report) <br /> Mariposa Road Parking Lot <br /> 4300 Mariposa Road <br /> Stockton,California <br /> June 15,2021 Page 4 <br /> Soils samples obtained in the field will be used to identify soil types and evaluate pertinent engineering <br /> properties.Specifically,materials will be tested to determine appropriate geotechnical design parameters <br /> for project development and will provide seismic loading criteria and seismic settlement potential for the <br /> new structures. The laboratory budget includes performing tests for material gradations, plasticity, <br /> expansion potential, R-value,and classification.The quantity and types of tests may vary depending upon <br /> soil uniformity below the site. <br /> Engineering and Geologic Evaluation----------------------------------------------------------------------------$2,048.00 <br /> The final report will represent field and laboratory data, evaluation of the site geology and soil formation <br /> properties. The report will evaluate for and will provide appropriate seismic loading parameters and <br /> seismic settlement evaluations for the proposed building expansion. <br /> Total Lump Sum Project Cost---------------------------------------------------------------------------------------$5,046.00 <br /> The cost proposal is based upon the above-mentioned scope of services and our understanding of the <br /> project.Should any unforeseen conditions rise,that would significantly affect the cost of the investigation, <br /> the client will be notified within one working day. If any additional laboratory testing becomes necessary, <br /> the client will be informed of any additional cost prior to performing the test. <br /> Principal Engineer $ 150.00/hr. <br /> Senior Engineer/Geologist $ 140.00/hr. <br /> Project Engineer/Geologist $ 130.00/hr. <br /> Staff Engineer/Geologist $ 110.00/hr. <br /> Soil Technician $ 100.00/hr. <br /> We are available for conference calls,meetings,and to review earthwork and foundation related portions <br /> of project drawings and specifications and to confer with the design team after submittal of our report. <br /> Such follow-up services are beyond the scope of this proposal and would be charged at$165.00 per hour <br /> for a Senior Geotechnical Engineer. We will obtain your specific written authorization prior to providing <br /> any additional services. <br /> GA1_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.