Laserfiche WebLink
SWRCB,January 2002 Page 1 of 1 <br /> SUMP ANNULAR TESTING <br /> Test Method Developed By: ®Sump Manufacturer Industry Standard L Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure X Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +-0.25 <br /> Sump#91 STP Sump# 91 STP Sump# Sump# <br /> Is Sump Liquid Filled? xl Yes U'No L Yes LI No Yes No a Yes No <br /> Type of Liquid Used: Propylene Glycol Propylene Glycol <br /> Sump Material: Fiberglass Fiberglass <br /> Sump Manufacturer: Bravo Bravo <br /> Penetration Type: Rigid Rigid <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 4:OOpm 5:30pm <br /> Initial Reading(RI): 3 psi 10"hg <br /> Test End Time: 5:OOpm 6:30pm <br /> Final Reading(RF): 3 psi 10"hg <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-RI): Opsi Opsi <br /> Pass/Fail Threshold or Criteria: Opsi Opsi <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Sump interstice of 91 STP tested under pressure and vacuum <br /> Roberto Plaza <br /> ICC 8036194 exp 9/28/21 <br /> Bravo exp 1/2/9079 <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)} <br />