My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 10:42:32 AM
Creation date
8/19/2021 8:37:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0540987
PE
2351
FACILITY_ID
FA0023459
FACILITY_NAME
Pilot Travel Center Lathrop - 1017
STREET_NUMBER
345
STREET_NAME
ROTH
STREET_TYPE
Rd
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
345 Roth Rd
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RP1200-12 <br /> there are items that must be repaired or replaced 6.5.6 Test Procedure. <br /> (e.g., deteriorated penetration fitting boots), Begin the test by adding water to the sump to a <br /> notify the owner/operator and obtain approval minitnum of 4 inches above the highest sump <br /> prior to proceeding with repairs. penetration or sump sidewall seam,whichever is <br /> 4.Test boots or secondary containment termina- higher. To compensate for sump deflection, the <br /> tion fittings must be present on the piping pen- water must be allowed to settle a minimum of <br /> etrating the sump. During testing, these fittings 15 minutes before taking the initial test measure- <br /> prevent water from entering the interstitial space ment. If the highest sump penetration or sump <br /> of double-walled piping. Without these fittings, sidewall seam is less than 4 inches from the top <br /> the integrity of the sump cannot be tested using of the sump, add water to within 1 inch of the <br /> this method. top of the sump. <br /> 5.If interstitial monitoring sensors are present 2.Place the measuring stick vertically at the lowest <br /> within the Containment sumps, temporarily point in the sump and extending above the water <br /> remove them before conducting the test. If the level in the sump to allow for an accurate mea- <br /> sensor is removed, reposition after testing to surement to be taken. The location of the mea- <br /> appropriate position according to the manufac- suring stick must remain the same for each water <br /> turer's instructions. level measurement. Document the initial water <br /> 6.If the containment sump is found to have cracks, level measurement as measured from the bottom <br /> loose parts or separation of any joints or penetra- of the sump. Alternative measurement methods <br /> tion fittings, it is not considered to be liquid- may be used provided that the measurement to <br /> tight. This visually indicates a test failure. 1116 (0.063)inch can be made. <br /> 3.Take all precautions to prevent the water level <br /> CAUTION' Water can damage electrical from being disturbed during the duration of the <br /> connections. Ensure that there are no test. <br /> components that can be damaged by the 4.After 1 hour, document the ending water level <br /> addition of water to the sump. If such :measurement. <br /> components are present, take appropriate 5.Upon completion of the test: <br /> precautions when performing the test or <br /> use an alternative test method. • remove all water and properly dispose of it <br /> according to Section 6.7; <br /> • reinstall any interstitial monitoring sensors in <br /> their proper positions; <br /> • return the test boots or secondary contain- <br /> .... <br /> ontain- <br /> ment fittings to their pre-test operating con- <br /> figurations; <br /> Water Electrical <br /> Level Junction <br /> Box <br /> Electrical <br /> Conduit <br /> Water <br /> Product Level <br /> Piping <br /> 5f Electrical <br /> Conduit <br /> Ps° <br /> Product <br /> FIGURE 6-5. The test fluid level in the UDC most be at Piping <br /> least 4 inches above the highest sump penetration or <br /> sidewall seam. <br /> FIGURE 6-6. To prevent leakage, check all penetration <br /> fittings before adding water to ensure they make a tight <br /> seal. <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.