Laserfiche WebLink
I <br /> Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> tank is no more than 95 percent full, the automatic 7.2.3 Inspection Equipment. Test equipment <br /> shutoff device passes the inspection. shall include: <br /> If the automatic shutoff device does not function • equipment to remove the vent restriction device; <br /> as designed or complete shutoff of product flow • tape measure. <br /> is unable to occur until the tank is more than 95 <br /> percent full, the automatic shutoff device fails the 7.2.4 Description of Inspection. The ball float <br /> inspection. valve assembly is removed from the tank, inspect- <br /> ed for proper operation and measured to ensure that <br /> 7.2 Ball float Vales. The PEI Overfill, Release the ball float assembly is the proper dimension to <br /> Detection and Release Prevention Equipment Testing restrict flow into the tank when it is no more than <br /> Committee recommends that ball floats be removed from 90 percent full. <br /> USTs as overfill prevention devices and another method <br /> of overfill prevention be installed. 7.2,5 Preparation. Refer to the manufacturer's <br /> tank chart for the capacity in gallons, the diameter <br /> 7.2.1. General. Ball float valves are designed and the volume of product with respect to product <br /> to restrict product flow when product in the tank level. <br /> reaches a certain level by restricting vapor flow <br /> from the tank ullage.When vapor flow is restricted, Use this test procedure in conjunction with the man- <br /> pressure builds in the tank ullage,slowing the flow ufacturer's installation and maintenance instruc- <br /> of product into the tank. tions. <br /> To operate properly, the ball float valve must be Visually verify that all tank-tap fittings are leak- <br /> properly installed, positioned at the correct height free and vapor-tight before starting the test proce- <br /> inside the tank and compatible with UST configu- dure. If any fittings arc loose, the ball float valve <br /> ration. will not restrict flow. <br /> 7.2.2 Purpose. The purpose of this inspection is Inspect the drop tube to ensure that it does not have <br /> to verify that the ball float valve is installed prop- an overfill valve. <br /> erty,operates as designed,and is set to restrict flow <br /> when the tank is no more than 90 percent full. 7.2.6 Inspection Procedure. <br /> 1.Remove the ball float valve assembly from the <br /> tank. <br /> 2.Visually inspect the 6a11 float and cage.Remove <br /> any debris or foreign objects. <br /> P� Ij V <br /> i <br /> 12- <br /> r .r <br /> ,r gg a �` _ <br /> "m wzag <br /> �� �o- t's.#' rast � <br /> �' }x"x�?�.'�'� <br /> IS <br /> a4 <br /> - <br /> ry^�n��c <br /> M. 3 �>�a <br /> u:.n <br /> FIGURE 7-2. Ball float assembly showing the ball in the FIGURE 7-3. To avoid damage when removing or rein- <br /> open position. The ball will float and cover the vapor stalling the ball float, use an extractor tool recommend- <br /> path if the product rises above the level of the cage. ed by the ball float manufacturer. <br /> pei.org <br />