6
<br /> GENERAL EROSION CONTROL NOTES MAINTENANCE NOTES LEGEND BMP NOTES
<br /> 1. ERODED SEDIMENTS AND OTHER POLLUTANTS MUST BE RETAINED ON SITE AND MAY NOT BE ALL MEASURES STATED ON THE EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM _ THE FOLLOWING BMPS AS OUTLINED IN, BUT NOT LIMITED TO, THE
<br /> TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION CENTER LINE CALIFORNIA STORMWATER BMP HANDBOOK DATED NOVEMBER 2015, OR
<br /> co
<br /> ° COURSES OR WIND. THE LATEST REVISED EDITION, MAY APPLY DURING THE CONSTRUCTION
<br /> co UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE — — PROPERTY LINE
<br /> 2. STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS MUST BE PROTECTED SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE CHECKED BY A QUALIFIED OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED AS NEEDED:
<br /> ° FROM BEING TRANSPORTED FROM THE SITE BY THE FORCES OF WIND OR WATER. — — — RIGHT-OF-WAY LINE/LEASE LINE
<br /> PERSON ON A SCHEDULE THAT MEETS OR EXCEEDS THE GOVERNING REQUIREMENTS, AND CLEANED EC-1, SCHEDULING
<br /> 3. FUELS, OILS, SOLVENTS, AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING: — — — — — EASEMENT / SETBACK LINE EC-2, PRESERVATION OF EXISTING VEGETATION
<br /> Q) THEIR LISTING AND MUST NOT CONTAMINATE THE SOIL AND SURFACE WATERS. ALL APPROVED APPROXIMATE CIVIL LIMIT OF WORK LINE WE-1, WIND EROSION CONTROL
<br /> Y NS-1, WATER CONSERVATION PRACTICES
<br /> STORAGE CONTAINERS ARE TO BE PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED 1. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW
<br /> UP IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT BE WASHED INTO SIGNS OF UNDERMINING, OR DETERIORATION. X CONSTRUCTION FENCE WITH GREEN SCREEN NS-3, PAVING AND GRINDING OPERATIONS
<br /> THE DRAINAGE SYSTEM. NS-7, POTABLE WATER/IRRIGATION
<br /> ic 4. EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY OTHER SD PROPOSED STORM DRAIN LINES NS-12, CONCRETE CURING
<br /> ° DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON SITE UNTIL 2. FILTREXX SILTSOXXS OR APPROVED EQUAL SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS NS-13, CONCRETE FINISHING
<br /> THEY CAN BE DISPOSED OF AS SOLID WASTE. IF DAMAGED. SEDIMENT SHALL BE REMOVED FROM THE FILTREXX SILTSOXXS OR APPROVED SD EXISTING STORM DRAIN LINES WM-4, SPILL PREVENTION AND CONTROL
<br /> EQUAL WHEN IT REACHES ONE-HALF THE HEIGHT OF THE FILTREXX SILTSOXX OR APPROVED WM-7, CONTAMINATED SOIL MANAGEMENT
<br /> � ° 5. TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED EQUAL. WM-9, SANITARY/SEPTIC WASTE MANAGEMENT
<br /> � o RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND. INLET PROTECTION
<br /> WM-10, LIQUID WASTE MANAGEMENT
<br /> 0 '. SE-7, STREET SWEEPING AND VACUUMING
<br /> 6. SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. 3. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
<br /> THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO INHIBIT SEDIMENTS TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP CONSTRUCTION ENTRANCE
<br /> ° FROM BEING DEPOSITED INTO THE PUBLIC WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP DRESSING OF THE CONSTRUCTION ENTRANCES AS CONDITIONS DEMAND.
<br /> IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN OR ANY OTHER MEANS.
<br /> — — — — STOCKPILE AREA CONTRACTOR RESPONSIBLE FOR TRAFFIC CONTROL
<br /> co 7. ANY SLOPES WITH DISTURBED SOILS OR DENUDED OF VEGETATION MUST BE STABILIZED SO AS TO 4. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE ____
<br /> INHIBIT EROSION BY WIND AND WATER. AND PEDESTRIAN CONTROL WHILE PERFORMING
<br /> FOR PARKING AND STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE WORK IN THE PUBLIC RIGHT-OF-WAY.
<br /> 8. STORM WATER POLLUTION CONTROL REQUIREMENTS MUST BE INTEGRATED ONTO THE EROSION TEMPORARY PARKING AS CONDITIONS DEMAND. SANITARY AREA, TRASH STORAGE, HAZARDOUS
<br /> ° CONTROL PLANS FOR ANY CONSTRUCTION BETWEEN OCTOBER 1 AND APRIL 15. THE FOLLOWING MATERIAL, CONCRETE MANAGEMENT, VEHICLE
<br /> NOTES AND BMP'S AS OUTLINED IN, BUT NOT LIMITED T0, THE BEST MANAGEMENT PRACTICE 5. ALL MAINTENANCE OPERATIONS SHALL BE DONE IN A TIMELY MANNER. AND EQUIPMENT STORAGE AREA
<br /> No E HANDBOOK, CALIFORNIA STORM WATER QUALITY TASK FORCE. SACRAMENTO, CALIFORNIA 1993, SITE PREPARATION SHOULD BE IN ACCORDANCE
<br /> N Y OR THE LATEST REVISED EDITION MAY APPLY DURING THE CONSTRUCTION OF PROJECT WITH GEOTECHNICAL INVESTIGATION
<br /> (ADDITIONAL MEASURES MAY BE REQUIRED IF DEEMED APPROPRIATE BY CITY INSPECTIONS). MATERIAL STORAGE
<br /> o AND DELIVERY
<br /> 9. TEMPORARY EROSION CONTROL DEVICES SHOWN ON THE PLAN WHICH INTERFERE WITH THE WORK
<br /> Q o SHALL BE RELOCATED OR MODIFIED AS AND WHEN THE CONTRACTOR AND/OR THE INSPECTOR SO ,J� EXISTING DIRECTION OF FLOW CONTRACTOR TO USE BEST MANAGEMENT PRACTICES
<br /> DIRECTS AS THE WORK PROGRESSES. TO ENSURE COMPLIANCE WITH NPDES AND WATER
<br /> LIMITS OF EARTHWORK PREPARATION FOR PROPOSED MANAGEMENT DISTRICT REGULATIONS FOR STORMWATER
<br /> Q o 10. ALL STANDARDS REFERENCED FROM 2015 CASQA CONSTRUCTION BMP BOOK. �� � �� D STDANCE BE ONDH THE PER METERS 0FOOT PROPOSED DEWATERINGDISCHARGE
<br /> OPERATIONS.CONSTRUCTION ACTIVITIES AND
<br /> w °
<br /> JN BUILDING AND TRASH ENCLOSURE HAS BEEN
<br /> o INCORPORATED).
<br /> z - FILTREXX SILTSOXX (OR APPROVED EQUAL)
<br /> 0
<br /> u
<br /> EROSION CONTROL NOTES
<br /> o I V O WM-1, MATERIAL DELIVERY AND STORAGE.
<br /> � 3
<br /> Li E I O WM-3, STOCKPILE MANAGEMENT, CONTRACTOR TO SET UP STOCKPILE AREA.
<br /> °
<br /> N 0O3 WM-5, SANITARY AREA.
<br /> II
<br /> WM-6, HAZARDOUS WASTE MANAGEMENT.
<br /> O WM-8, CONCRETE WASTE MANAGEMENT.
<br /> N
<br /> Q I I I I O SE-5, INSTALL FILTREXX SILTSOXX OR APPROVED EQUAL. REFER TO SHEET C3.1 FOR MORE INFORMATION.
<br /> w o
<br /> U c O SE-10, STORM DRAIN INLET PROTECTION. INSTALL BRIGADE INLET FILTER AT ALL DROP INLETS AND ERTEC
<br /> 7 o N CURB INLET GUARD AT CURB INLETS OR APPROVED EQUAL.
<br /> zo 6 = / 12 6 a _ N 8O TR-1, STABILIZED CONSTRUCTION ENTRANCE/EXIT; REFER TO DETAIL 1, SHEET C3.1.
<br /> z ❑❑❑❑ _ — — — —x
<br /> o T7 — �� �� �A USDSD I TR-3, ENTRANCE/OUTLET SHAKER PLATE; REFER TO DETAIL 2, SHEET C3.1.
<br /> 0
<br /> k\\ \7\J\\�F
<br /> w o
<br /> SD SD
<br /> a
<br /> 10 NS-10, VEHICLE AND EQUIPMENT MAINTENANCE.
<br /> �—28.87'
<br /> co
<br /> —_ — — 11 SD-32, TRASH STORAGE AREA.
<br /> N I 12 CONSTRUCTION FENCE WITH GREEN SCREEN
<br /> °
<br /> 2 13 o 13 WE-1, WIND EROSION CONTROL
<br /> N
<br /> — 1 N
<br /> 3° N o ��
<br /> oo c N c — c n 14 SE-7, VACUUM SWEEPING OF ADJACENT STREETS.
<br /> 0 V) S38°56'57"w 6 9 J 8 � ui o SEQUENCE OF CONSTRUCTION
<br /> 120.86' c�
<br /> UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAYDOWN,
<br /> N PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, FUEL AND MATERIAL STORAGE CONTAINERS, SOLID WASTE
<br /> L0 a �� �, t o CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS
<br /> M — A M M THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS.
<br /> 0 S45°00'41"W
<br /> o ° 133.46' �� ° w PHASE 1:
<br /> o 102.04' I 1. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE (1) AND CHAIN LINK FENCE WITH GREEN SCREEN AND
<br /> f 33.08' —I N N OTHEN FILTREXX SILTSOXX OR APPROVED EQUAL (OR GRAVEL BAGS) WHERE SHOWN ON PLAN.
<br /> Q) 14 % S47°54'37"W " 2. INSTALL INLET PROTECTION AT EXISTING INLET(S).
<br /> d75.75' 6 3. PREPARE CLEARING AND GRUBBING OF THE SITE, IF APPLICABLE.
<br /> Q
<br /> N , LU I o 4. DEMOLISH THE EXISTING PAVEMENT AND CONCRETE PADS.
<br /> L cn
<br /> 12 12 PHASE 2:
<br /> Q [� 5. PERFORM MASS GRADING. ROUGH GRADE TO ESTABLISH PROPOSED DRAINAGE PATTERNS.
<br /> a a Q 6. START CONSTRUCTION OF THE BUILDING PAD AND STRUCTURES.
<br /> w N 7. TEMPORARILY SEED WITH PURE LIVE SEED, THROUGHOUT CONSTRUCTION, DISTURBED AREAS THAT WILL BE
<br /> V) INACTIVE FOR 7 DAYS OR MORE OR AS REQUIRED BY GENERIC PERMIT.
<br /> L I
<br /> 14
<br /> o
<br /> 00 6 N N
<br /> 4 ( 3 4 5 10 11 M M M
<br /> 0
<br /> aFl. S10°46'55"W
<br /> U � � � � 50.76'
<br /> 6 12 Q
<br /> N V
<br /> co
<br /> > a
<br /> °
<br /> 00 o O
<br /> QI ) (10Q
<br /> 03
<br /> o GRAPHIC SCALE IN FEET
<br /> N 0 10 20 40
<br /> o aQ I
<br /> E �
<br /> 1" = 20 '
<br /> ° I WHEN PRINTED AT FULL SIZE
<br /> ° �'
<br /> (24" X 36")
<br /> ° I
<br /> o
<br /> ISSUE DATE DESCRIPTION ENGINEERS SEAL
<br /> O8/10/2020 1ST SUBMITTAL Kimley))) HornCITY OF MANTECA te. CITY OF MANTECA
<br /> GM QROFE�S/pyAPPROVED BY:
<br /> DIAL TWO WORKING DRAWN BY ��o�� P PO4 765
<br /> 765 THE CITY DRIVE, SUITE 200 O
<br /> BEFORE DAYS BEFORE JP ORANGE, CA 92868 EROSION CONTROL
<br /> YOU DIG '11 YOU DIG * RCE N0. 86160 * (714)939-1030 CITY ENGINEER DATE IC1LeN RQIBBRS C3 . 0
<br /> CHECKED BY ,rte I PREPARED R THE DIRECT SUPERVISION OF: RCE # EXP 1311 E YOSEMITE PLAN
<br /> TOLL FREE 1-800-227-2600 TH -if C/V�V AVE.,
<br /> A PUBLIC SERVICE BY OF CO-0 DATE: 8/q/2020 MANTECA, CA 95336
<br /> UNDERGROUND SERVICE ALERT RECOMMENDED JOHN POJCK, R.C.E. NO. 86160 EXP. 12/31/20