Laserfiche WebLink
-2- <br />PA -2100168 (GP), -169 (ZR) & -170 (SA) <br />10) This project is subject to the NPDES Region -Wide Permit requirements and shall comply <br />with the following conditions. Prior to release of the building permit, plans and calculations <br />shall be submitted and approved by the Public Works Department— Water Resources <br />Division (209-468-3605): <br />a) Treatment: A registered professional engineer shall design the site to treat the <br />85th percentile storm as defined in the County's 2021 Storm Water Quality <br />Control Criteria Plan (SWQCCP). <br />b) Hydromodification: A registered professional engineer shall design the site to <br />comply with the volume reduction requirement outlined in the County's 2021 <br />SWQCCP. <br />c) Trash: A registered professional engineer shall design the site to comply with the <br />trash control requirement outlined in the County's 2021 SVVQCCP <br />11) Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br />Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all <br />required records, updates, test results and inspection reports shall be maintained on the <br />construction site and be available for review upon request. <br />12) Prior to release of the building permit, the owner shall enter into an agreement with San <br />Joaquin County for post -construction maintenance of stormwater quality facilities. <br />13) Applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board <br />(SWRCB) and comply with the State "General Permit for Storm Water Discharges <br />Associated with Construction Activity", The Waste Discharge Identification Number <br />(WDID), issued by SWRCB, shall be submitted to Public Works prior to release of the <br />building permit. Contact the SWRCB at (916) 341-5537 for further information. <br />CH:DS <br />Planning Commission Staff Report, PA -2100168, -169, -170 (GP, ZR, SA) <br />Response Letters <br />