My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014337
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4860
>
2600 - Land Use Program
>
PA-2100168
>
SU0014337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 8:42:36 AM
Creation date
8/20/2021 8:52:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014337
PE
2687
FACILITY_NAME
PA-2100168
STREET_NUMBER
4860
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215-
APN
17321014
ENTERED_DATE
8/10/2021 12:00:00 AM
SITE_LOCATION
4860 E MAIN ST
RECEIVED_DATE
3/3/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Pled Review Team PGEPIanReviea@pge.com <br />Land Management <br />& Electric Company <br />March 6, 2023 <br />Alisa Goulart <br />County of San Joaquin <br />1810 E Hazelton Ave <br />Stockton, CA 95205 <br />Ref: Gas and Electric Transmission and Distribution <br />Dear Alisa Goulart, <br />Thank you for submitting the 4860 E Main Street plans for our review. PG&E will review the <br />submitted plans in relationship to any existing Gas and Electric facilities within the project area. <br />If the proposed project is adjacent/or within PG&E owned property and/or easements, we will be <br />working with you to ensure compatible uses and activities near our facilities. <br />Attached you will find information and requirements as it relates to Gas facilities (Attachment 1) <br />and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure <br />your safety and to protect PG&E's facilities and its existing rights. <br />Below is additional information for your review: <br />1. This plan review process does not replace the application process for PG&E gas or <br />electric service your project may require. For these requests, please continue to work <br />with PG&E Service Planning: https://www.aae.com/en US/business/services/building- <br />a nd-renovation/overview/overview.paae. <br />2. If the project being submitted is part of a larger project, please include the entire scope <br />of your project, and not just a portion of it. PG&E's facilities are to be incorporated within <br />any CEQA document. PG&E needs to verify that the CEQA document will identify any <br />required future PG&E services. <br />3. An engineering deposit may be required to review plans for a project depending on the <br />size, scope, and location of the project and as it relates to any rearrangement or new <br />installation of PG&E facilities. <br />Any proposed uses within the PG&E fee strip and/or easement, may include a California Public <br />Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a <br />conveyance of rights for specific uses on PG&E's fee strip or easement. PG&E will advise if the <br />necessity to incorporate a CPUC Section 851filing is required. <br />This letter does not constitute PG&E's consent to use any portion of its easement for any <br />purpose not previously conveyed. PG&E will provide a project specific response as required. <br />Sincerely, <br />Plan Review Team <br />Land Management <br />PG&E Gas and Electric Facilities Page 1 <br />Public <br />Planning Commission Staff Report, PA -2100168, -169, -170 (GP, ZR, SA) 29 <br />Response Letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.