Laserfiche WebLink
V,vlfORN, CALIFORNIA WATER SERVICE <br /> 9 <br /> . I <br /> Stockton District 1505 East Sonora Street, Stockton, CA 95205 <br /> Tel:(209) 547-7900 <br /> TER SERI <br /> January 15,2021 <br /> Mrs. Pamela Hurban <br /> Northstar Engineering Group Inc <br /> Modesto,CA 95354 <br /> (emailed to PHurban@nseng.net) <br /> Will Serve Letter <br /> APN: 173-210-14 <br /> Dear Mrs. Hurban <br /> California Water Service Company Stockton District("Cal Water")has determined that water is available to <br /> serve the above-referenced project based on the information provided. Cal Water agrees to operate the water <br /> system and provide service in accordance with the rules and regulations of the California Public Utilities <br /> Commission(CPUC)and the company's approved tariffs on file with the CPUC. This determination of water <br /> availability shall remain valid for two years from the date of this letter. If construction of the project has not <br /> commenced within this two year time frame,Cal Water will be under no further obligation to serve the project <br /> unless the developer receives an updated letter from Cal Water reconfirming water availability. Additionally, <br /> Cal Water reserves the right to rescind this letter at any time in the event its water supply is severely reduced <br /> by legislative, regulatory or environmental actions. <br /> Cal Water will provide such potable water at such pressure as may be available from time to time as a result <br /> of its normal operations per the company's tariffs on file with the CPUC. Installation of facilities through <br /> developer funding shall be made in accordance with the current rules and regulations of the CPUC including, <br /> among others.Tariff Rules 15 and 16 and General Order 103-A. In order for us to provide adequate water for <br /> domestic use as well as fire service protection,it may be necessary for the developer to fund the cost of special <br /> facilities, such as, but not limited to, booster pumps, storage tanks and/or water wells, in addition to the cost <br /> of mains and services. Cal Water will provide more specific information regarding special facilities and fees <br /> after you provide us with your improvement plans,fie department requirements,and engineering fees for this <br /> project. <br /> This letter shall at all times be subject to such changes or modifications by the CPUC as said Commission <br /> may,from time to time,require in the exercise of its jurisdiction. <br /> If you have any questions regarding the above, please call me at(209)464-8311. <br /> Sincer , <br /> ret Dahlen <br /> Construction Superintendent—Stockton District <br /> cc: Ting He—Cal Water Engineering Dept <br /> File <br /> Quality. Service. Value. \ <br /> calwatencom <br />