Laserfiche WebLink
Nov 22 2021 02:38PM HP Fax (209)369-0843 page 12 <br />CERS Consolidated Emergency Response ! Contingency Plan <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): <br />CH <br />❑ 1. VERBAL WARNINGS; 9 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; [9 3. TELEPHONE; <br />❑ 4. PAGERS; 9 5. ALARM SYSTEM; [:16. PORTABLE RADIO <br />NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): <br />Cie. <br />❑ I. VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; 3. TELEPHONE; <br />❑ 4. PAGERS; ❑ 5. ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br />EMERGENCY COORDINATOR CONTACT INFORMATION: <br />cu. <br />PRIMARY EMERGENCY COORDINATOR NAME: John DeNigris PHONE NO.: 2094012989 PHONE NO.: <br />ALTERNATE EMERGENCY COORDINATOR NAME: Robert Craggs PHONE NO.: 2096633216 PHONE NO.: <br />❑ Check if additional Emergency Coordinator contact and address information is available onsite orby calling PHONE NO.: <br />Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check the applicable boxes to indicate Your facility's procedures for containing spills and preventing and mitigating releases, fires and/or ex losions. <br />1. MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br />Di <br />❑ 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br />❑ 3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br />❑ 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br />[:15. LINED TRENCH DRAINS AND/OR SUMPS; <br />[:16. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br />❑ 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br />❑Q 8. STOP PROCESSES AND/OR OPERATIONS; <br />❑ 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />❑ 10. SHUT OFF WATER GAS, ELECTRICAL UTILITIES; <br />9111. CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br />0 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />❑Q 13. ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br />❑ 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br />21 15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />❑ 16. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />❑ 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />❑ 18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP, <br />❑ 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br />❑ 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br />❑ 21. OTHER (Specify): <br />D2. <br />E. FACILITY EVACUATION <br />THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): <br />El. <br />❑ 1. BELLS; <br />E2. <br />❑ 2. HORNS/SIRENS; <br />❑� 3. VERBAL (i.e., Shouting); <br />❑ 4. OTHER (Specify): <br />THE FOLLOWING LOCATIONS) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g., Parking lot, street coma): <br />E3. <br />Front Parking Lot on Victor Road <br />Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br />E4. <br />❑ 1. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />Q 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑ 3. OTHER (Specify): t <br />Note: Evacuation procedures and/or [naps should be posted in visible facility locations and must be included in the Contingency Plan. <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): <br />Fl. <br />❑i 1. HAVE BEEN DETERMINED NOT NECESSARY; <br />❑ 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />Fz. <br />Note: Advance arrangements with local fire and police departments, hospitals, state and local cmcrgeney response tcams, and/or emergency wrvicgs <br />contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br />Rev. 03/07/17 <br />Received Time Nov,22. 2021 1:46PM No,6982 <br />Page 2 of 4 <br />