My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:33:15 PM
Creation date
9/8/2021 11:32:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8 . IN -TANK GAUGING TESTING <br /> 0 Check this box if tank gauging is used only for inventory control . <br /> ❑ Check this box if NO tank gauging equipment is installed . Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been : 1 ) visually inspected for kinks , breaks and proper entry and ❑ ❑ ❑ <br /> termination ; and 2 tested for ground faults ? <br /> Were all in -tank gauging probes visually inspected for damage and residue buildup ❑ ❑ ❑ <br /> to ensure that floats move freely , functionally tested , and confirmed operational ? <br /> Was accuracy of system ' s product level readings tested ? ❑ ❑ ❑ <br /> Was accuracy of system ' s water level readings tested ? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer' s maintenance checklist completed ? ❑ ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> 9 . COMMENTS <br /> Describe all answers marked "No " or "Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> BOTH DIESEL PLLD FAILED WILL NEED MORE TROUBLE SHOOTING <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.