<br /> PLUMBING FIXTURE SCHEDULE PLUMBING GENERAL NOTESPLUMBING LEGENDS ABBREVIATIONS
<br /> W m �pFESS/N
<br /> RUNOUT SIZE RESPONSIBILITY 1. DO NOT SCALE FROM THESE DRAWINGS. C7 0 x U) e�� M ROSFe
<br /> I.D. DESCRIPTION LOCATION MFG MODEL NO. CW HW W V PC RD COMMENTS 2. DO NOT MAKE ANY CHANGES OR SUBSTITUTIONS WITHOUT DESCRIPTION SYMBOL SYMBOL DESCRIPTION SYMBOL DESCRIPTION 0
<br /> SPECIFIC WRITTEN APPROVAL FROM THE ARCHITECT OR J W M 38871
<br /> CS-1 3-COMP SINK BREAK ROOM ADVANCE 93-3-54-18 3/4" 3/4" I.W. P STAINLESS STEEL,P.C.TO FURNISH AND INSTALL SINK&FAUCET @ ENGINEER. LO LOPUMP DISCHARGE PIPING B.F.F. PD AD AREA DRAIN MAX MAXIMUM U O � CO *m
<br /> TABCO 1.8 GPM.T&S BRASS,8"INLET CENTERS, 14"SWING NOZZLE,B-2299 3. ALL INDICATED WORK SHALL BE PERFORMED BY THE PLUMBING
<br /> HAS
<br /> CONTRACTOR UNLESS OTHERWISE NOTED. AFF ABOVE FINISHED FLOOR MIN MINIMUM z T T
<br /> 1/2 HP/115V/1 PH/60 HZ/1725 RPM 4. REFER TO THE WRITTEN SPECIFICATIONS IN CONJUNCTION SANITARY PIPING A.F.F.OR GRADE S AP ACCESS PANEL MS MOP SINK Z r- � D 9TFOF CAV��`p��
<br /> EP 1 EFFLUENT PUMP LOADING DOCK ZOELLER FM2779 - P WITH THE PLANS FOR FULL PROJECT SCOPE. N C) - - O
<br /> ARCH ARCHITECTURAL o
<br /> 5. IT IS THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO SANITARY PIPING B.F.F.OR GRADE S BFP BACKFLOW PREVENTER NC NORMALLY CLOSED a) � o o O
<br /> NOTES: 3. PLUMBING FIXTURES ABOVE ARE IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN I=INSTALL F=FURNISH P=PROVIDE=FURNISH&INSTALL REVIEW THESE PLANS AND SPECIFICATIONS, AS WELL AS THE NO NORMALLY OPEN v co co
<br /> TABLE A5.303.2.3.1 OF THE 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE, PART 11 BFF BELOW FINISHED FLOOR
<br /> RELATED HVAC, FIRE PROTECTION, ELECTRICAL, STRUCTURAL, NTS NOT TO SCALE r
<br /> ARCHITECTURAL, INTERIOR DECOR AND SITE ENGINEERING GREASE WASTE PIPING A.F.F.OR GRADE GW BLDG BUILDING NIC NOT IN CONTRACT a- + + 3:
<br /> PLUMBING DRAIN SCHEDULE DRAWINGS TO BECOME FAMILIAR WITH THE FULL PROJECT BWV BACKWATER VALVE
<br /> SCOPE. IN ADDITION, THIS CONTRACTOR MUST COORDINATE GREASE WASTE PIPING B.F.F. GW CLG CEILING OFD OVER FLOW ROOF DRAIN In � Z Z
<br /> WITH A TENANT REPRESENTATIVE TO FULLY UNDERSTAND ALL CODP CLEANOUT DECK PLATE PRV PRESSURE REDUCING VALVE Z
<br /> REQUIREMENTS WHICH MAY NOT BE SPECIFIED HEREIN ANDLnQ: w
<br /> INDIRECT WASTE SYSTEM PIPING A.F.F.OR GRADE IW • • c� r 1 r�
<br /> I.D. TYPE SERVING MFG MODEL No. OUTLET SIZE NOTES WHICH THE TENANT MAY CONSIDER PART OF THIS CONTRACT. CONN CONNECTION RD ROOF DRAIN i i W (n? v o�
<br /> DURING THE COURSE OF CONSTRUCTION COORDINATION AND ��0�� W N
<br /> INDIRECT WASTE SYSTEM PIPING A.F.F.OR GRADE IW CONT CONTINUATION RPZ REDUCED PRESSURE BFP Z Z - Z
<br /> SP-1 STANDPIPE EVAP CONDENSATE DRAIN ZURN Z513 3" - ACTUAL CONSTRUCTION, IT IS THE RESPONSIBILITY OF THE U W Q 0 - cel
<br /> PLUMBING CONTRACTOR TO WORK CLOSELY WITH ALL CW COLD WATER RWC RAIN WATER CONDUCTOR oLO
<br /> FS-1 12"SQUARE FLOOR SINK COMPARTMENT SINK ZURN Z1900-2-23 3" 1,2 ACCOMPANYING CONTRACTORS AND TRADESMEN IN ORDER TO STORM PIPING A.F.F.OR GRADE ST = O a
<br /> ENSURE A SMOOTH RUNNING AND CAREFULLY COORDINATED DF DRINKING FOUNTAIN S SANITARY -6 N
<br /> NOTES/ACCESSORIES: INSTALLATION. DIA DIAMETER SA SHOCK ARRESTER
<br /> ui
<br /> STORM PIPING B.F.F.OR GRADE ST _ � c
<br /> 6. ANY DISCREPANCIES OR INADEQUACIES WITHIN THESE BID DI DIRONIZED WATER SH SHOWER _ L` m
<br /> (1)SEDIMENT BUCKET DOCUMENTS OR BETWEEN THESE BID DOCUMENTS AND THE DN DOWN SK SINKU u
<br /> (2) 1/2 GRATE FOR FS-1. RELATED HVAC, FIRE PROTECTION, ELECTRICAL, STRUCTURAL, CONDENSATE DRAIN ---- ---- ---- C ----- ---- ---- ----- - -
<br /> DR DRAIN SSK SERVICE SINK a
<br /> ARCHITECTURAL, INTERIOR DECOR AND SITE ENGINEERING SS SOIL STACK ui
<br /> cu
<br /> DRAWINGS, OR BETWEEN THESE BID DOCUMENTS AND FIELD VENT PIPING A.F.F.OR GRADE - - - - - - - - - - - - - - - - - -
<br /> CONDITIONS MUST BE BROUGHT TO THE ATTENTION OF THE EA EACH ST STORM WATER PIPING
<br /> TENANT, ARCHITECT AND ENGINEER PRIOR TO BID SUBMISSION. EL ELEVATION - Q
<br /> 7. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL VENT PIPING B.F.F.OR GRADE - - - - - - - - - - - - - - - - - - EQ EQUAL = o
<br /> APPLICABLE REGULATIONS INCLUDING BUT NOT LIMITED TO EVAC VACUUM CONDENSATE TW TEMPERED WATER / 1 i C,,j
<br /> NATIONAL, CITY, STATE, LOCAL CODES AND ORDINANCES LOW PRESSURE NATURAL GAS G EWC ELECTRIC WATER COOLER TP TRAP PRIMER = �•J
<br /> WHICH MAY BE IN EFFECT. ALL PLUMBING MATERIALS, a�
<br /> EXIST/EX EXISTING o 0
<br /> INSTALLATION PROCEDURES AND SYSTEM LAYOUTS SHALL BE 2 PSI NATURAL GAS 2G UR URINAL -
<br /> APPROVED BY ALL APPLICABLE CODE ENFORCEMENT
<br /> AUTHORITIES HAVING JURISDICTION, AND IT SHALL BE THE FCO FLOOR CLEANOUT UOI UNLESS OTHERWISE INDICATED
<br /> PLUMBING CONTRACTOR'S RESPONSIBILITY TO OBTAIN AND COLD WATER - - - - - - - - - - FD FLOOR DRAIN
<br /> PAY FOR ALL NECESSARY PERMITS AND APPROVALS FOR THIS F.F. FINISH FLOOR V VENT
<br /> INSTALLATION. HOT WATER -- -- -- -- -- -- -- -- -- FL FLOOR VTR VENT THROUGH ROOF
<br /> 8. THE PLUMBING CONTRACTOR MUST VISIT THE SITE AND NOTE FW FILTERED WATER VS VENT STACK
<br /> ALL EXISTING CONDITIONS AS WELL AS ALL CONDITIONS TO BE HOT WATER RECIRC. ---- --- --- --- --- --- --- ---- FPWH FROST PROTECTED WALL HYDRANT
<br /> MET, PRIOR TO BID SUBMISSION. LACK OF A THOROUGH G GAS PIPING W WASTE
<br /> UNDERSTANDING OF THE PROJECT SCOPE AND CONDITIONS _ GPM GALLONS PER MINUTE
<br /> SHALL NOT CONSTITUTE AN EXCUSE FOR ERRORS OR TEMPERED WATER --- -- -- ---TW -- -- -- - W/O WITHOUT
<br /> OMISSIONS, NOR FOR A REQUEST FOR EXTRA COMPENSATION. GW GREASE WASTE WC WATER CLOSET
<br /> 9. IT IS CRITICAL THAT THE PLUMBING CONTRACTOR FIELD EXISTING SANITARY PIPING (E)SAN GCO GRADE CLEANOUT WCO CLEANOUT WALL PLATE
<br /> VERIFIES ALL EXISTING INVERTS PRIOR TO BID SUBMISSION. IF WFU WATER SUPPLY FIXTURE UNITS
<br /> ANY CONFLICTS EXIST BETWEEN THE NEW PLUMBING EXISTING GREASE WASTE PIPING (E)GW HB HOSE BIBB WH WALL HYDRANT
<br /> SYSTEMS AND THE EXISTING SITE LEVEL SYSTEMS, THEY HW HOT WATER WS WASTE STACK
<br /> SHOULD BE BROUGHT TO THE ATTENTION OF AN OWNER'S HWR HOT WATER RETURN
<br /> REPRESENTATIVE AND THE ENGINEER PRIOR TO BID EXISTING COMBINATION WASTE/VENT PIPING (E)W
<br /> SUBMISSION. EXTRA COMPENSATION WILL NOT BE ALLOWED O7
<br /> FOR ANY EXTRA WORK WHICH RESULTS FROM AN INABILITY TO INV. INVERT LEVEL o
<br /> EXISTING STORM PIPING (E)ST C14
<br /> MEET THE INVERTS OF THE EXISTING SITE LEVEL PIPING IW INDIRECT WASTE Ln
<br /> SYSTEMS. LAV LAVATORY rn
<br /> 10. THE PLUMBING CONTRACTOR SHALL PROVIDE A COMPLETE SET EXISTING VENT PIPING (E)V - - LDR LEADER U
<br /> OF RECORD "AS-BUILT" DRAWINGS INDICATING THE PRECISE
<br /> LOCATION OF ALL SYSTEMS, EQUIPMENT CONCEALED OR EXISTING LOW PRESSURE NATURAL GAS (E)G Z z
<br /> EMBEDDED PIPING, PIPING CONNECTIONS AND ACCESS ABBREVIATION NOTES
<br /> DOORS. THESE DRAWINGS SHALL ALSO INCLUDE ALL
<br /> EXISTING 2 PSI NATURAL GAS (E)2G THIS SHEET IS A GENERAL LIST OF ABBREVIATIONS AND SHALL BE USED AS A DICTIONARY TO DEFINE ITEMS U
<br /> CHANGES AND DEVIATIONS FROM BID DOCUMENTS.
<br /> 11. UNLESS OTHERWISE NOTED, RUN ALL DOMESTIC WATER, INDICATED ON DRAWINGS.NOT ALL SYMBOLS OR ABBREVIATIONS ARE NECESSARILY USED ON THIS PROJECT. � Z_
<br /> WASTE, VENT AND GAS PIPING AS HIGH AS POSSIBLE EXISTING COLD WATER - - - - (E)CW -- - - - -- U) U Z
<br /> THROUGHOUT ENTIRE BUILDING. INSTALL LONG RUNS OF z O
<br /> PIPING WITHIN STEEL (JOIST) SPACE AND OTHER PIPING TIGHT EXISTING HOT WATER -- -- -- (E)HW -- -- -- -- Uj
<br /> TO BOTTOM OF STEEL. COORDINATE AND VERIFY WITH OTHER
<br /> CONTRACTORS AS NOT TO INTERFERE WITH DUCTWORK, FIRE PLUMBING PIPE MATERIAL SCHEDULE Lu Lu
<br /> Lu
<br /> PROTECTION PIPING, LIGHTING SYSTEMS, ETC. EXISTING HOT WATER RECIRC. --- --- --- (E)HWR --- ---
<br /> --- ~ �
<br /> 12. ALL EXPOSED HORIZONTAL AND VERTICAL PIPING SHALL BE PIPING SYSTEM ABBREVIATION PIPING MATERIAL (=j 0
<br /> INSTALLED IN A NEAT ARRANGEMENT IN LOCATIONS WHICH VALVE GATE H BALL(15 UNION Q
<br /> ARE THE MOST INCONSPICUOUS. VERTICAL DROPS SHALL BE SANITARY DRAINAGE&VENT(ABOVE GRADE) S,W,CWV OR V PVC SCHEDULE 40,HUBLESS CAST IRON Q C/)
<br /> KEPT TO AN ABSOLUTE MINIMUM AND THEIR FINAL LOCATIONS SANITARY DRAINAGE&VENT(BELOW GRADE) S,W,CWV OR V PVC SCHEDULE 40,SERVICE WEIGHT CAST IRON Q<SOLENOID VALVE LLI
<br /> SHALL BE COORDINATED AND RUN WITHIN CHASES, WALLS, SV AQUASTAT J
<br /> STORM DRAINAGE(ABOVE GRADE) ST OR OST PVC SCHEDULE 40,HUBLESS CAST IRON Z
<br /> SOFFITS WITH OTHER MECHANICAL/ELECTRICAL FEEDS. ALL O ::)
<br /> SUCH LOCATIONS ARE TO BE REVIEWED WITH A TENANT PRESS.RED.VALVE VACUUM RELEIF VALVE STORM DRAINAGE(BELOW GRADE) ST SERVICE WEIGHT CAST IRON(PVC DWV OPTIONAL) H C)
<br /> LU
<br /> REPRESENTATIVE AND ARCHITECT PRIOR TO INSTALLATION. POTABLE WATER(ABOVE GRADE) CW,HW OR HWR TYPE L HARD DRAWN COPPER I—
<br /> 13. FINAL CONNECTIONS TO ALL GAS FIRED APPLIANCES TO BE BY GAS COCK i BALANCING VALVE POTABLE WATER-2"&SMALLER(BELOW GRADE) CW,HW OR HWR TYPE K SOFT ANNEALED COPPER m
<br /> THE PLUMBING CONTRACTOR, REGARDLESS OF WHO Lu =
<br /> PROVIDES APPLIANCE. THIS SHALL INCLUDE BUT NOT BE NATURAL GAS(ABOVE GRADE&ON ROOF) G SCHEDULE 40 BLACK STEEL
<br /> LIMITED TO HVAC EQUIPMENT, COOKING EQUIPMENT, GREASE INTERCEPTOR GI MIXING VALVE NATURAL GAS(BELOW GRADE) G APPROVED'PE'PIPE FOR GAS W/NOTE#1
<br /> EMERGENCY GENERATORS AND DOMESTIC HOT WATER >_
<br /> CONDENSATE DRAIN-1"&SMALLER CD TYPE M HARD DRAWN COPPER J
<br /> HEATERS. EACH PIECE OF EQUIPMENT SHALL BE PROVIDED WATER FILTER WFlff WF® T&P RELIEF VLAVEU)WITH A DIRT LEG, LUBRICATED PLUG VALVE, UNION AND GAS 41- CONDENSATE DRAIN-1-1/4"&LARGER CD TYPE DWV HARD DRAWN COPPER Z W
<br /> SHUT-OFF VALVE. CONDENSATE DRAIN-1"&SMALLER(EXTERIOR) CD SCHEDULE 40 GALVANIZED STEEL O Of
<br /> 14. ALL PLUMBING FIXTURES/APPLIANCES SHALL HAVE THEIR OWN HUB DRAIN Hp CAPPED OUTLET [ Q X
<br /> INDEPENDENT SHUT-OFF VALVES, INSTALLED IN AN EASILY CONDENSATE DRAIN-1-1/4"&LARGER(EXTERIOR) CD SCHEDULE 40 GALVANIZED STEEL :2 Lu
<br /> ACCESSIBLE AND CONVENIENT LOCATION. FLOOR SINK FS ® GRATE 1/2 ® WATER HAMMER 4 O cn
<br /> LL
<br /> 15. ALL DOMESTIC WATER BRANCH LINES SHALL HAVE THEIR OWN REFER TO SPECIFICATIONS FOR FITTINGS,INSTALLATION REQUIREMENTS AND FURTHER INFORMATION Z (n
<br /> RESPECTIVE SHUT-OFF VALVES. FLOOR/AREA DRAIN FD EO AD ❑O BACKFLOW PREVENTION DEVICE gip REFER TO SPECIFICATION FOR APPROVED SECONDARY PIPE MATERIAL OPTIONS Z
<br /> 16. DOMESTIC HOT WATER HEATER TEMPERATURE/PRESSURE Z Lu
<br /> NOTES: 1.PROVIDE TRACER WIRE NO LESS THAN 14 AWG OR TAPE FOR BELOW GRADE POLYETHYLENE GAS PIPE IN ACCORDANCE WITH CPC 1210.1.7.2
<br /> RELIEF VALVES SHALL BE PIPED FULL SIZE TO THE NEAREST BWV Q
<br /> APPROVED STANDPIPE OR FLOOR DRAIN. THIS REQUIREMENT GROUND/FLOOR CLEAN OUT GCO FCO BACKWATER VALVE \� O U
<br /> SHALL BE APPLICABLE TO ALL DOMESTIC WATER HEATERS U O
<br /> EXCEPT INSTANTANEOUS WATER HEATERS. WALL CLEAN OUT CHECK VALVE �� c/) Lu
<br /> 17. ALL LAVATORY HAND SINKS SHALL HAVE IN-LINE WATER Lu
<br /> cn
<br /> TEMPERING VALVES INSTALLED SO AS TO BE EASILYLu
<br /> HORIZONTAL CLEAN OUT - FROST PROTECTED WALL HYDRANT �+ FPWH Lu =
<br /> ACCESSIBLE. THESE TEMPERING VALVES SHALL BE SET TO
<br /> ZD
<br /> DELIVER HOT WATER AT 105° F (110° MAX.). CODE COMPLIANCE U li
<br /> 18. ALL PLUMBING VENT LINES NOTED AS "V. UP" OR"VENT UP" TRAP PRIMER TP WALL HYDRANT WH O O
<br /> 0 Lu
<br /> SHALL BE CONNECTED TO THE NEAREST APPROVED W.T.R."
<br /> 2019 CALIFORNIA BUILDING CODE WITH LOCAL AMENDMENT Lu U)
<br /> OR"VENT THRU ROOF." STAND PIPE SP 0 HOSE BIBB --I HB HB 2019 CALIFORNIA PLUMBING CODE WITH LOCAL AMENDMENT cn =D
<br /> 19. THE PLUMBING CONTRACTOR SHALL RUN OUT ALL BUILDING 2019 CALIFORNIA MECHANICAL CODE WITH LOCAL AMENDMENT = C)
<br /> DRAINAGE AND WASTE LINES AND MAKE ALL CONNECTIONS TO 2019 CALIFORNIA ELECTRICAL CODE WITH LOCAL AMENDMENT N_Lu
<br /> SITE LEVEL SYSTEMS AS INDICATED ON BID DOCUMENTS. TRENCH DRAIN TD ® WATER METER Fl WM Z 0
<br /> 2019 CALIFORNIA ENERGY CODE WITH LOCAL AMENDMENT O
<br /> 20. ALL WALK-IN REFRIGERATION / FREEZER COIL CONDENSATE 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE, PART 11 Q
<br /> PIPING SHALL BE PIPED TO STAND PIPE DRAINS AND/OR FLOOR P TRAP R GAS METER GM J =
<br /> 2019 SUPPLEMENTS TO THE CALIFORNIA STATE CODES WITH LOCAL �
<br /> DRAINS OR VACUUM DRAINAGE SYSTEM IF APPLICABLE BY THE AMENDMENTS W Q
<br /> REFRIGERATION CONTRACTOR. CONDENSATE PIPING SHALL BE PIPE DROP&RISE D PRESSURE GAUGE
<br /> COPPER. COORDINATE WITH THE REFRIGERATION CODES AND REGULATIONS INFORMATION
<br /> CONTRACTOR TO DETERMINE PIPE SIZES AND LOCATIONS OF PIPE UP OR DOWN ----0 ---0- ROOF DRAIN RD O
<br /> EVAPORATOR COILS. ALL AIR HANDLER UNIT CONDENSATE NTS =
<br /> PIPING SHALL ALSO BE FURNISHED AND INSTALLED BY THIS Ln
<br /> CONTRACTOR. WATER TIGHT PIPE SLEEVE T OVERFLOW ROOF DRAIN OF O o
<br /> 21. PRIOR TO INSTALLING SYSTEMS, THE PLUMBING CONTRACTOR
<br /> SHALL MEET WITH A TENANT'S REPRESENTATIVE TO FIELD PIPE BREAK CONNECT TO EXISTING PROJECT NOTES
<br /> VERIFY THE EXACT LOCATION OF ALL PROPOSED EQUIPMENT
<br /> WHICH MAY NOT BEA CLEARLY INDICATED ON THE DRAWINGS. 0
<br /> VENT THROUGH ROOF(VTR PLAN 0 RISER J L
<br /> 22. COORDINATE ALL APPLIANCE/FIXTURE SCHEDULE I.D. TO BE REMOVED
<br /> NUMBERS WITH THE ARCHITECTURAL DRAWINGS FOR THE THE SCOPE OF WORK SHALL INCLUDE PROVIDING ALL WORK INDICATED,AND COORDINATION WITH ALL
<br /> EXACT QUANTITY AND LOCATIONS. SLOPE CIRCULATING PUMP CP TRADES. SCOPE OF WORK IS INDICATED ON THE CONTRACT DOCUMENTS INCLUDING THE DRAWINGS AND THE
<br /> 23. ALL EQUIPMENT WITH DIRECT CONNECTIONS TO THE DOMESTIC SPECIFICATIONS,WHICH ARE COMPLIMENTARY. WORK INDICATED IN ANY CONTRACT DOCUMENT SHALL BE
<br /> WATER SYSTEM SHALL BE EQUIPPED WITH WATTS, No.7 DUAL DIRECTION OF FLOW THEROMETER n CONSIDERED PART OF THE SCOPE OF WORK. IN GENERAL,WORK REQUIREMENTS ARE NOT INDICATED IN
<br /> CHECK VALVE TYPE BACKFLOW PREVENTION DEVICE. BOTH DOCUMENTS.WHERE DOCUMENTS CONFLICT WITHIN THEMSELVES OR WITH CODES AND REGULATIONS,
<br /> 24. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL PROVIDE THE HIGHER QUANTITY AND QUALITY AND FOLLOW THE STRICTER REQUIREMENTS.
<br /> WASH DOWN FAUCET(WDF) EQUIPPED WITH INTEGRAL CASE DRAIN 0 QUICK CONNECT
<br /> VACUUM BREAKER BENEATH ALL COMPARTMENT SINKS. VISIT THE SITE TO DETERMINE PRE-EXISTING CONDITIONS AND WORK NECESSARY PRIOR TO SUBMISSION OF
<br /> 25. ALL FLOOR DRAINS IN MECHANICAL ROOMS AND BATHROOMS BID PRICE. INCLUDE ALL REQUIRED WORK IN BID PRICE.
<br /> SHALL BE EQUIPPED WITH AUTOMATIC TRAP PRIMERS. LEGEND NOTES: REVISIONS
<br /> 26. ALL LAVATORY FAUCETS IN RESTROOMS SHALL BE THIS SHEET IS A GENERAL LIST OF SYMBOLS,ABBREVIATIONS AND SHALL BE USED AS A DICTIONARY TO DEFINE ITEMS INDICATED ON DRAWINGS. NOT
<br /> SELF-CLOSING TYPE. ALL FAUCETS SHALL NOT EXCEED 0.5 ALL SYMBOLS OR ABBREVIATIONS ARE NECESSARILY USED ON THIS PROJECT.
<br /> GPM WATER FLOW, ALL TOILETS SHALL NOT EXCEED 1 TPF . EQUIPMENT COORDINATION NOTES
<br /> 27. CROSS CONNECTION PROTECTION SHALL BE PROVIDEDD AT ALL
<br /> POTABLE WATER SUPPLIED APPLIANCES AND EQUIPMENT.
<br /> 28. ALL HOT WATER PIPING SHALL BE INSULATED WITH 1"THICK
<br /> INSULATION (UP TO 1 1/2" PIPE SIZE), AND HAVE AN 'R' RATING PRIOR TO CONSTRUCTION OR INSTALLATION,CONTRACTOR WILL COORDINATE
<br /> OF R-4.2. WITH GENERAL CONTRACTOR AND ALL TRADES,ROUGH-IN OF PLUMBING
<br /> EQUIPMENT OR EQUIPMENT FURNISHED BY OWNER. REFER TO SHOP DRAWINGS
<br /> OR EQUIPMENT SPECIFICATIONS FOR EXACT REQUIREMENTS OF EQUIPMENT TO BE
<br /> SEISMIC REQUIREMENTS INSTALLED. PROVIDE ALL FITTINGS,GAUGES AND ACCESSORIES FOR A COMPLETE
<br /> INSTALLATION. CO
<br /> GENERAL ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE m w
<br /> A. THE REQUIREMENTS INCLUDED UNDER THIS SECTION OF SPECIFICATION FOR RESTRAINTS FOR ALL FLOOR AND CEILING AND ROOF MOUNTED AND STRUCTURALLY SUSPENDED EQUIPMENT, PIPING, EQUIPMENT MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE CODES. Of :5
<br /> DUCTWORK AND CONDUIT HEATING, VENTILATING AND AIR CONDITIONING ARE SUPPLEMENTARY TO THOSE CONTAINED IN THE RESPECTIVE PLUMBING, ELECTRICAL, SPRINKLER SPECIFICATIONS. 00 O
<br /> FAILURE TO DO ANY OF THE ABOVE THE SHALL BE AT THE SOLE RISK AND EXPENSE w U
<br /> DESCRIPTIONOF THE PLUMBING CONTRACTOR. W v
<br /> A. IT IS THE INTENT OF THIS SECTION TO PROVIDE THE BASIS OF SEISMIC DESIGN FOR PLUMBING, MECHANICAL, AND ELECTRICAL SYSTEMS. PROVIDE SEISMIC RESTRAINTS, COMPLETE AS SHOWN AND
<br /> SPECIFIED PER CONTRACT DOCUMENTS. IT IS THE RESPONSIBILITY OF EACH RESPECTIVE TRADE RESTRAINT SYSTEMS COMPLYING WITH ALL APPLICABLE CODES. CONTRACTOR TO CONSULT WITH/EMPLOY
<br /> THE SERVICES OF A QUALIFIED AND LICENSED SEISMIC RESTRAINT ENGINEER TO PROVIDE AND INSTALL COMPLETE SEISMIC RESTRAINT SYSTEMS COMPLYING WITH ALL APPLICABLE CODES. w
<br /> B. THE WORK OF THIS SECTION INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING: C9
<br /> Q o
<br /> 1. SEISMIC RESTRAINTS FOR PIPING, CONDUIT, EQUIPMENT, DUCTWORK, TANKS, STACKS, ETC. o 7
<br /> C. WORK RELATED IN OTHER SECTIONS: DRAWING DRAWING TITLE
<br /> 1. ALL FLOOR, WALL AND CEILING MOUNTED AND STRUCTURALLY SUSPENDED EQUIPMENT, PIPING, DUCTWORK SPECIFIED FOR PROJECT. NUMBERN M v �n r� co rn o
<br /> D. SEISMIC RESTRAINING SYSTEMS MANUFACTURERS: THIS IS A SUGGESTED, NON ENCOMPASSING LIST. D. APPROVED, ALTERNATE MANUFACTURER WILL BE CONSIDERED.
<br /> 1. VMC EAST (516)-437-4800- RICHARD BERGER
<br /> P-1.0 PLUMBING OVERVIEW PLUMBING
<br /> SUBMITTAL DATA REQUIREMENTS
<br /> A. DESCRIPTIVE DATA P-2.0 PLUMBING FLOOR PLAN OVERVIEW
<br /> 1. AN ITEMIZED LIST OF EQUIPMENT, PIPING AND DUCTWORK TO BE SEISMIC ALLY RESTRAINED.
<br /> 2. SEISMIC RESTRAINT CALCULATIONS.
<br /> 3. STRUCTURAL OR CIVIL ENGINEERS' STAMP VERIFYING DESIGN AND CALCULATIONS FOR SEISMIC RESTRAINING SYSTEM USED.
<br /> 2. SHOP DRAWINGS
<br /> 1. DRAWINGS SHOWING EQUIPMENT BASE CONSTRUCTION FOR EACH MACHINE, INCLUDING DIMENSIONS, STRUCTURAL MEMBER SIZES AND SUPPORT POINT LOCATIONS.
<br /> 2. DRAWINGS SHOWING METHODS OF SUSPENSION, SUPPORT AND GUIDES FOR PIPING AND DUCTWORK.
<br /> 3. CONCRETE AND STEEL DETAILS FOR BASES, INCLUDING ANCHOR BOLT LOCATIONS. FOR PERMIT DATE: 11/06/2020
<br /> 4. NUMBER AND LOCATION OF SEISMIC RESTRAINTS AND ANCHORS FOR EACH PIECE OF EQUIPMENT.
<br /> 5. SPECIFIC DETAILS AND RESTRAINTS, INCLUDING ANCHOR BOLTS FOR MOUNTING AND MAXIMUM LOADING STRUCTURAL MEMBER SIZES AND PIECE OF EQUIPMENT AND/OR PIPE, CONDUIT AND DUCT JOB NO. 20263
<br /> LOCATIONS.
<br /> C. SEISMIC CERTIFICATION AND ANALYSIS
<br /> 1. SEISMIC RESTRAINT CALCULATIONS MUST BE PROVIDED FOR ALL CONNECTIONS OF EQUIPMENT TO THE STRUCTURE.
<br /> 2. CALCULATIONS TO SUPPORT SEISMIC RESTRAINT DESIGNS STAMPED BY A REGISTERED PROFESSIONAL MECHANICAL ENGINEER.
<br /> 3. ANALYSIS MUST INDICATE CALCULATED DEAD LOADS, DERIVED LOADS AND MATERIALS UTILIZED FOR CONNECTIONS TO EQUIPMENT AND STRUCTURE. ANALYSIS MUST DETAIL ANCHORING METHODS BOLT
<br /> DIAMETER, IMBEDMENT AND WELD LENGTH. Pml no
<br /> 4. A VALID SEISMIC DESIGN ERRORS AND OMISSIONS INSURANCE CERTIFICATE MUST ACCOMPANY ALL SUBMITTALS.
<br /> SHEET NO.
<br />
|