My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1015
>
1600 - Food Program
>
PR0162377
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 10:05:42 AM
Creation date
9/8/2021 4:10:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0162377
PE
1618
FACILITY_ID
FA0022621
FACILITY_NAME
RESTAURANT DEPOT EXPRESS
STREET_NUMBER
1015
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07523039
CURRENT_STATUS
01
SITE_LOCATION
1015 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m E <br /> 7 8 9 10 11 12 13 14 15 a? 0 <br /> 0 F ES SIONq <br /> 2 <br /> (D � Lo Lo " J m M 38871 <br /> 0 0 0) 0) c <br /> 0 z i >1 �T�T ORA Nip <br /> - r r FOF CA��FO <br /> N C) — — 0 <br /> 1. RESTAURANT DEPOT KEY DETAILS (ON THIS SHEET) MUST BE HIGHLIGHTED AND DISCUSSED WITH ALL RELATED TRADES AT Q � 0) 0) 0 <br /> KICKOFF MEETINGS. 0 (D (D <br /> I I I I I I I I I <br /> a) 13) 00 <br /> 2. DETAILS INDICATED IN THIS DESIGN DRAWING PACKAGE DO NOT DEPICT ANY SEISMIC SUPPORT INFORMATION. Lo 0- + + <br /> REFRIGERATION INSTALLATION CONTRACTOR SHALL PROVIDE AND INSTALL ALL REQUIRED SEISMIC EQUIPMENT SUPPORT IN <br /> ACCORDANCE WITH APPLICABLE CODES AS WELL AS ALL MANUFACTURERS RECOMMENDATIONS. — — — — — — — — — - -- — ==I L Z w <br /> XFR L3 •• Z <br /> 3. ALL CONTRACTORS SHALL PROCURE, AT THEIR OWN EXPENSE,ALL NECESSARY PERMITS/LICENSES INCIDENT TO THE WORK VIDEO p.RACK P MDP ❑❑ I OJ p I •• � • 0 Z - • <br /> TO BE PERFORMED AND AS REQUIRED BY ALL GOVERNING FEDERAL / STATE / LOCAL CODES AND ORDINANCES. ALL 000w <br /> EQUIPMENT SHALL BE MANUFACTURED / INSTALLED IN STRICT COMPLIANCE WITH ALL FEDERAL/ STATE / LOCAL CODES AND A x O [D- 1:t <br /> I I I •i�0es• Z W N Z <br /> ORDINANCES. z — <br /> OFFICE p ELECTRICAL K I MEN'S �C�MEN'S JANITOR / HALL ❑ I C) W O° <br /> 4. ALL PORTIONS OF THE REFRIGERATION AND MECHANICAL EQUIPMENT EXPOSED TO POTENTIAL PHYSICAL DAMAGE SHALL BE ROOM M STORAGE I — ^ o <br /> PERMANENTLY PROTECTED IN AN APPROPRIATE MANNER BY THE REFRIGERATION INSTALLATION CONTRACTOR AND SHALL RECEIVING I v, -0 <br /> BE SUBJECT TO APPROVAL BY THE LOCAL AUTHORITY HAVING JURISDICTION. I L o O X"• <br /> 5. THE MECHANICAL REFRIGERATION SYSTEMS SHALL BE MAINTAINED IN PROPER WORKING CONDITION AND SHALL BE RDP I of <br /> O O - <br /> MAINTAINED TO REMAIN FREE OF ACCUMULATION OF OIL, DIRT, WASTE, CORROSION, DEBRIS AND LEAKS. O I I = U <br /> 6. REFER TO REFRIGERATION SPECIFICATIONS FOR FURTHER DETAILS AND INSTRUCTIONS. / I cuLIJ co� <br /> 7. DO NOT SCALE DRAWINGS. CORRIDOR — ` — L — J — I — — — - �? <br /> >CN <br /> O PGDIM ONTACT L1 L2 D \ �\ I � �N j <br /> O I — C9 <br /> o� I o m <br /> GENERAL NOTES o <br /> II <br /> I <br /> SA3 SA2 SA1 <br /> / I I <br /> COOLER I <br /> I I I I I I I I I <br /> THIS LIST IS TO HIGHLIGHT SOME KEY AREAS IMPORTANT FOR A SUCCESSFUL AND TROUBLE FREE INSTALLATION. THE CONTRACTORS ARE STILL <br /> RESPONSIBLE TO INSPECT AND UNDERSTAND EACH AND EVERY DETAIL APPEARING ON THE PLANS. IT IS VERY IMPORTANT THAT A MEETING IS ESTABLISHED I I <br /> WITH ALL TRADES TO REVIEW THE ENTIRE SCOPE OF WORK BEFORE COMMENCING PRICING ON ANY PROJECT. I <br /> I I I I I I I I I o <br /> EACH CONTRACTOR/VENDOR BELOW MUST PROVIDE FULL CONTACT INFO AT COMMENCEMENT OF THE PROJECT. I � <br /> Al <br /> INTERNET AND PHONE LINE IN THE FACILITY ARE IMPERATIVE PRIOR TO START UP OF REFRIGERATION AND BUILDING CONTROL SYSTEMS. I Q <br /> U <br /> I <br /> 1) INSULATED FREEZER FLOOR I ZO z <br /> TRILLIUM CONDENSER <br /> A) REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR ADDITIONAL INFORMATION AND CONSTRUCTION DETAILS. <br /> I T�DC2-TF-119-12.4 � I <br /> B) FOLLOW THE PLANS, DETAILS AND SPECIFICATIONS VERY CAREFULLY. NO SUBSTITUTIONS ARE ACCEPTABLE WITHOUT RD APPROVAL. O 38'-8" DIMENSIONS= 132"L x 94"D x 95"H 36'-7" U <br /> C) PICTURES SHALL BE TAKEN AT EACH STEP OF INSTALLATION AND SAHLL BE PROVIDED TO RD REP FOR INSPECTION PRIOR TO PROCEEDING TO NEXT TYPICAL B IUM PROFILE ° SA4 O WEIGHT=4,560 LBS I � Z <br /> INSTALLATION STEP. CONDENSER TO BE INSTALLEDI C/) U <br /> EVAPORAT R(BEM0490). z z <br /> D) TEMPERATURE SENSORS SHALL BE INSTALLED IN GALVANIZED PIPE BY THE EC WITH WATER TIGHT CONNECTION. CONNECTINOS MUST BE SEALED DIMENSIO S= 124"L x 21"D x 29"H O ELEVATED STEEL RAILS Ofy — p <br /> AS PER PLANS. NET WEIG - BS OUTDOOR CONCRETE SLAB <br /> E) ALL VAPOR BARRIERS SHALL BE APPLIED AS PER DETAILS. I i 0 0 <br /> F) FREEZER MATE INSULATION SHALL BE INSTALLED WITH SEAMS STAGGERED, CROSSED AND TAPED WITH DUCT TAPE. — — — — — — — — — — — — — _ Lu <br /> G) VENT PIPE SYSTEM AND/OR GLYCOL SYSTEM SHALL BE VISUALLY INSPECTED PRIOR TO PROCEEDING TO NEXT STEP. 19' I Q <br /> H) ALL HOLES IN VENT PIPES SHALL FACE DOWNWARD. 6 I E � Q N <br /> 1) EXHAUST FANS MUST BLOW DOWN THROUGH HIGHER PIPE. 0 J <br /> J) PIPING OF SUPPLY AND RETURN SHALL BE INSTALLED TO MATCH PLANS. CONTROL <br /> PANEL�i � <br /> K) EXTRA ATTENTION MUST BE APPLIED TO STRENGTHEN ALL CEMENT FORMS WHEN POURING SLABS. I p <br /> L) ALL MEASUREMENTS MUST BE REVIEWED AND CONFIRMED ON SITE IN COORDINATION WITH THE WALK-IN BOX MANUFACTURER AND SIGNED PRIOR — — — — — LLL — — — — J — — —m � � <br /> TO BOX DELIVERY IN ORDER TO AVOID ANY CONFLICTS. A < m <br /> M) IT IS IMPERATIVE THAT THE FREEZER WALLS SIT EXACTLY ON THE WOOD PERIMETERS AS INDICATED IN PLANS AND CONSTRUCTION DETAILS. m w O <br /> d > MANIFOLD SIDE <br /> 2) INSULATED PANEL INSTALL 4 m O <br /> A) REFER TO COOLER/FREEZER ARCHITECTURAL DRAWINGS FOR SPECIFIC REQUIREMENTS. Oil SA5 I cn OUTDOOR PARALLEL COMPRESSOR 0 <br /> REFRIGERATION UNIT WITH DOUBLE z c/) <br /> B) A MINIMUM 4"AIR SPACE IS REQUIRED BETWEEN THE INSULATED PANELS AND ANY ADJACENT WALLS. T STACKED SCROLL COMPRESSORS O LU <br /> C) A DOUBLE ROW OF 1/2" CAULKING SHALL BE APPLIED TO THE WALL PANELS AT ALL WALL TO FLOOR, AND ALL WALL TO CEILING CONNECTIONS PRIOR GENERAL SALES AND VERTICAL RECEIVER. Q <br /> TO SETTING. DIMENSIONS= 176"L x 88"D x 95"H � w <br /> D) LOW TEMPERATURE SEALANT SHALL BE APPLIED TO COVER 3" EXPOSED INSULATION ON INSIDE PERIMETER OF THE FREEZER. A O DLER NET WEIGHT=9,000 LBS 00 N <br /> E) TRIM SHALL BE INSTALLED ON ALL EXPOSED ENDS.ALL TRIM SHALL BE SILICONED DOWN WHILE SECURNING. — — — — 1 1 — — z co <br /> F) WALL TRIM SCREWS SHALL BE WHITE AND INSTALLED IN A STRAIGHT LINE, EVENLY SPACED. CONTROL PANEL ACCESS z Z <br /> Lu <br /> G) WHERE HANGER RODS PENETRATE WALK IN FREEZER FOR CEILING SUPPORT, THRU BOLTING OF DOORS, ETC., NYLON ROD IS PREFERRED :E <br /> PROVIDED IT IS SIZED CORRECTLY TO SUPPORT THE WEIGHT. C/) ZD <br /> REFRIGERATION PIPING z U <br /> H) ALL DOOR OPENINGS SHALL BE REINFORCED AS PER RD DETAILS AND MANUFACTURERS RECOMMENDATIONS. PENETRATION THROUGH 0 O0 <br /> 1) DIGITAL KASSON K7 DIGITAL THERMOMETERS SHALL BE SUPPLIED AND INSTALLED FLUSH INTO PANELS WITH ELECTRICAL CONNECTIONS LOCATED BUILDING WALL ABOVE <br /> C/) <br /> ON THE TOP OF COOLER/FREEZER. CONNECTIONS SHALL BE INSTALLED TO PREVENT OBSTRUCTION FROM THE DOORS. I COOLER w <br /> z Lu w <br /> J) VAPOR RELIEF PORTS SHALL BE SIZED PROPERLY, PROVIDED AND INSTALLED FOR FREEZER APPLICATIONS. EC SAHLL BE NOTIFIED TO ASSURE <br /> PROPER WIRING. A3 <br /> U LL <br /> K) RECEIVING SLIDER DOOR SAHLL BE JAMISON SINGLE OR BI-PARTING WITH WICKET DOOR. UNLESS OTHERWISE NOTED. I QO O <br /> LLJ <br /> L) ALL MAN DOORS SHALL HAVE HEATED WINDOW WIRED AND NOTED TO EC TO ASSURE PROPER WIRING. d FORMER I Lu W <br /> M) GARBAGE MUST BE CLEANED DURING AND AFTER WORK EACH DAY. ° 'd SA6 GARDEN CENTER I — _ _ w o <br /> N) ALL SEAMS AND TRIM AROUND COLUMNS AND FLOOR SHALL BE INSPECTED AND SIGNED OFF BY RD PRIOR TO FINAL PAYMENT. A MANUFACTURERS " I (VACANT) I Lu ~ N <br /> QUALITY CONTROL CHECKLIST SHALL ACCOMPANY THE FINAL INVOICE. I I Z N <br /> O <br /> 3) REFRIGERATION I I <br /> [ifA) WHILE SOLDERING ALL REFRIGERATION PIPES, NITROGEN SHALL BE USED AT ALL TIMES WITH PROPER METHODS AS INDICATED IN THE _ _ _ Q <br /> SPECIFICATIONS. THIS REQUIREMENT WILL BE SPOT CHECKED. IF IT IS FOUND THAT THE CONTRACTOR IS NOT IN COMPLIANCE, ALL PIPING WILL BE — — — -TY LOW PROF DIUM <br /> ZD <br /> CONSIDERED DEFECTIVE AND SHALL BE RE-INSTALLED AT THE RIC'S EXPENSE. TEM RE EVAPORA OIL I <br /> APIAROYX DIMENSIONS =94" x 16"D x 18"H I I Q <br /> B) CONTRACTOR IS RESPONSIBLE FOR RECORDING THE PRESSURES THAT THE REFRIGERATION SYSTEMS ARE RECEIVED HOLDING. THIS INFORMATION NE EI H = 115 LBS I �� I = <br /> SHALL BE PROVIDED TO RD REP IMMEDIATELY UPON ARRIVAL AND TESTING OF EQUIPMENT. 2 J Lo <br /> C) RD REP SHALL WITNESS AND SIGN OFF PRESSURIZATION AND TRIPLE EVACUATION PROCESS OF REFRIGERATION LINES PRIOR TO PROCEEDING TO <br /> NEXT STEP. ii I o <br /> D) ALL REFRIGERANT LEAK DETECTION SENSORS SHALL BE INSTALLED AT APPROPRIATE LOCATIONS AND TESTED UPON START UP OF SYSTEMS. II I <br /> E) A MAIN LIQUID LINE SOLENOID SHALL BE FACTORY INSTALLED ON EACH REFRIGERATION SYSTEM AND SHALL BE WIRED TO THE MAXIMUM POSSIBLE <br /> EXTENT BY THE REM TO THE OUTPUT CONTROL BOARD. <br /> F) CONTRACTOR SHALL USE RD/MANUFACTURES START-UP PROCEDURE&COMMISSIONING BOOK AND SUBMIT TO RD REP PRIOR TO FINAL PAYMENTS. A4 I <br /> G) AN EMS"OPERATION OF SYSTEMS"TEST INCLUDING ALL VS DRIVES SHALL BE COMPLETED WITH RD REP AND EMS CONTRACTOR. <br /> H) A FULL SIZE REFRIGERATION CIRCUIT AND IDENTIFICATION PLAN SHALL BE SUPPLIED AND INSTALLED IN THE ELECTRICAL ROOM. A REDUCED SIZE <br /> oil <br /> REFRIGERATION CIRCUIT AND IDENTIFICATION PLAN SHALL BE SUPPLIED AND INSTALLED IN THE MANGER'S OFFICE. 1, �--1 - 4 - - - - - - <br /> 1) ALL REFRIGERATION WALK-IN COOLER AND FREEZER COILS PROVIDED BY THE REM WITH LEGIBLE CIRCUIT NUMBERS (I.E. Al-A, Al-B, ETC) ON A <br /> _ I <br /> CONTRASTING BACKGROUND,APPROXIMATELY 3"-4" IN HEIGHT OR LARGE ENOUGH TO BE LEGIBLE FROM FLOOR OF A 24' BOX. <br /> J) CARE SHOULD BE TAKEN TO APPLY SILICONE FOR WATERTIGHT SEAL AT ALL FLANGES AS THEY ATTACH TO MACHINE HOUSE OUTSIDE WALL WHEN <br /> INSTALLING SHIP LOOSE VENTILATION HOODS ON TO MECHANICAL CENTERS. <br /> K) REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR SIGNING IN ALL CPC LOOSE PARTS. RC SHALL REVIEW ALL PARTS WITH EMS CONTRACTOR. RD <br /> REP SHALL BE NOTIFIED IMMEDIATELY IF PARTS ARE MISSING. EMS CONTRACTOR IS RESPONSIBLE FOR KEEPING KEEP PARTS ACCOUNTED FOR. <br /> 0 0 0 <br /> L) RIC IS RESPONSIBLE FOR FIELD PROGRAMMING THE REFRIGERANT LEAK DETECTION SYSTEM WITH SUPERVISION FROM RD REP. <br /> M) RIC IS RESPONSIBLE FOR SECURING THE CPC HANDHELD AND ANY OTHER HANDHELDS PROVIDED WITH THE PROJECT IN MOTOR ROOM OR POWER <br /> WALL FOR FUTURE FIELD PROGRAMMING AND TROUBLESHOOTING OF DEVICES.ALL DEVICES SHLL NOT BE REMOVED FROM THE JOBSITE. <br /> N) PROVIDE RD REP WITH ALL SUPERHEAT ADJUSTMENT SET POINTS FOR EACH EVAPORATOR. A8 <br /> O) IT IS IMPERATIVE THAT THE RIC LEARNS AND TRAINS THEIR SERVICE PERSONNEL TO FULLY UNDERSTAND AND OPERATE THE REFRIGERATION o=o o=o COOLER <br /> SYSTEMS AND ALL THE COMPONENTS INCLUDED. <br /> 4)CONDENSATION LINES <br /> A) FREEZER EVAPORATOR CONDENSATE DRAIN LINES MUST EXIT DIRECTLY BEHIND EACH EVAPORATOR COIL WITH MINIMUM DRAIN PIPING EXPOSED <br /> TO FREEZER TEMPERATURES. <br /> B) RIC SHALL INSTALL RUNNING TRAPS ON ALL CONDENSATE DRAIN LINE HORIZONTAL RUNS. INSTALL ALL DRAIN LINES WITH A MINIMUM PITCH SLOPE / SA9 SA10 SA11 <br /> OF 1/4" PER FOOT. EACH EVAPORATOR REQUIRES INDIVIDUAL CLEAN OUT TEES AND INDIRECT CONNECTION TO MAIN HORIZONTAL RUNS AS00 <br /> -- <br /> SPECIFIED 0 <br /> C) HEAT TRACE SHALL BE WIRED TO JUNCTION BOXES OUTSIDE THE REFRIG. SPACE. SHALL PENETRATE WALK-IN BOX WALL THRU A SLEEVE. HEAT a o 0 LU <br /> TRACE SHALL BE PROTECT AS REQUIRED. >- cf) <br /> D) CONDENSATED LINES FROM THE EVAPORATOR COILS TO THE HUB DRAINS SHALL BE COPPER PIPE ONLY. RIC IS RESPONSIBLE FOR FREEZER 77 7 7 77 F. — B C/) <br /> ARMAFLEX INSULATION FOR EXPOSED DRAIN LINES. �J o <br /> E) HUB DRAINS SHALL BE AT (4) CORNERS OF FREEZER AND THE INSIDE OF CURB. CARE SHALL BE TAKEN TO NOT PENETRATE INSULATION. RISER Q co <br /> SHALL HAVE INSULATION BREAK FROM FREEZER SIDE. 0 <br /> F) USE HEAVY DUTY FLOOR DRAINS AS SPECIFIED. <br /> I I I I i I I I I I <br /> 5) RACKING r� It � N M v LLQ � ti Co rn o <br /> A) RACKING COMPANY SHALL SUBMIT A DRAWING THAT MATCHES ALL ANTHONY DOORS, WALK IN DOORS, EVAPS AND MEAT CASES. <br /> REFRIGERATION <br /> B) PRODUCT STOP BEAMS SHALL BE INSTALLED TO PROTECT WALLS AND ANTHONY DOORS ON ALL LEVELS. _ - - - - - - - - - - - - - - — — — — — — — — — — — — — - - - - - - - - - - - - - - - - - - � <br /> C) ON RACKING SUPPORT PROJECTS, CROSS BEAMS SHALL BE PROVIDED TO HANG EVAPORATORS. DESIGNATION <br /> D) EVAPORATORS SHALL BE POSITIONED BETWEEN RACKING BAYS OR RACKING COMPANY SHALL PROVIDE SPACE BY CUTTING AND RE-SUPPORTING <br /> RACKING. PLAN <br /> E) IF EVAPORATORS ARE SUPPORTED FROM RACKING, RACKING COMPANY SHALL PROVIDE FRONT TO BACK CROSS SUPPORTS TO SUPPORT <br /> EVAPORATORS. <br /> FOR PERMIT DATE: 11/06/2020 <br /> RESTAURANT DEPOT KEY DETAILS REFRIGERATION DESIGNATION PLAN JOB No. 20263 <br /> Rm200 <br /> SHEET NO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.