My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3221
>
1600 - Food Program
>
PR0546972
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2021 9:18:42 AM
Creation date
9/8/2021 4:29:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546972
PE
1623
FACILITY_ID
FA0026615
FACILITY_NAME
YUMMY DONUTS
STREET_NUMBER
3221
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3221 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROXIMATE LOCATION FOR 0 <br /> CONNECTION TO THE EXISTING O <br /> WATER MAIN IF IT IS = OR > 1 W Z <br /> REQUIRED OTHERWISE PLUMBING FIXTURE SCHEDULE <br /> INSTALL NEW 1 J" MAIN ALL THE <br /> WAY TO THE EXISTING WATER METER Z Eq_ C <br /> ITEM DESCRIPTION WSFU QNTY TOTAL PLUMBING <br /> /\ N0. WSFU � LIQ <br /> .21 <br /> " 1 WATER CLOSETS (1 .28 gal. flush) (WC) 2.5 2 5.0 3" DRAIN, 3/4" SUPPLY W a <br /> / <br /> 2 0 O <br /> LAVATORY (LAV) 1 .0 2 2.0 1 1/2" DRAIN, 1/2" SUPPLY � L <br /> N <br /> 3 WATER HEATER #1 (WH) 5.0 1 5.0 3/4" WATER, 3/4" GAS Q J <br /> M 3 <br /> / 4 MOP SINK (MOP) 3.0 1 3.0 3" DRAIN, 3/4" SUPPLY W Q <br /> 5 3-COMPARTMENT SINK (2-FAUCETS) 1 .5 1 1 1.5 2" DRAIN, 1/2" SUPPLY n/ n <br /> LL N +: <br /> © 3 6 HAND SINK (HS) 2.0 2 4.0 1 1/2" DRAIN, 3/4" SUPPLY E9 <br /> 'LAV 7 FLOOR DRAIN (FD) 1 .0 2 2.0 2" DRAIN, 1/2" SUPPLY 0 <br /> 0 <br /> w 8 o c <br /> / o LAV <br /> WH 3 9 E <br /> < _ H 10 LL <br /> MOP hly . ...i■-� ■�■ � _� <br /> c <br /> IP <br /> A/4- 12 <br /> TOTAL 22.5 <br /> HOT WATER PIPE CALCULATOR BUILDING DEPARTMENT <br /> / ITEM DESCRIPTION WSFU QNTY MULTIPLIER TOTAL HWS UNITS Q <br /> NAMN 0. E: <br /> �. <br /> Q 3-C❑MP 1 LAVATORY (LAV) 1 .0 2 X0.75 0.75 EA - 1 .5 TOTAL CITY OF STOCKTON <br /> V <br /> HS SINK <br /> 3S1NK❑ P 2 ADDRESS: <br /> MOP SINK (MOP) 3.0 1 X0.75 2.25 EA - 2.25 TOTAL <br /> (n 425 N. ELDORADO ST. <br /> 3 3-COMPARTMENT SINK (3-COMP) 1 .5 1 X0.75 1.125 EA - 1 .125 TOTAL STOCKTON, CA 95202 <br /> Q <br /> WATERV 4 HAND SINK (HS) 2.0 2 X0.75 1 .5 EA - 3.0 TOTAL PHONE: <br /> METER Q 5 209-937-8561 <br /> 6 BUILDING OWNER <br /> ll TOTAL 7.85 NAME: <br /> / BECK PROPERTIES <br /> I Q <br /> W <br /> Z ADDRESS: <br /> EXISTING WATER METER IS <br /> O 3114 W. HAMMER LN. <br /> EQUIPPED WPREVENTION ITH DEVCEACKFLOW STOCKTON, CA 95209 <br /> APPROXIMATE LOCATION <br /> OF CONNECTION TO PHONE: <br /> EXISTING 4" SS MAIN. <br /> FIELD VERIFY PRIOR TO (209) 957-0331 <br /> SAW CUT. <br /> ' I TENANT <br /> APPROXIMATE LOCATION <br /> WATT E R SUPPLY SCHEDULE \ VTR OF CONNECTION TO NAME: <br /> EXISTING 4" SS MAIN. ~ YUMMY DONUTS <br /> SCALE: N.T.S. VTR OUT FIELD VERIFY PRIOR TO z <br /> SAW CUT. Q <br /> Wc _ (E, ADDRESS: <br /> R ZOUT <br /> Z w <br /> ASSUME 40 PSI (PER TABLE 6-6) � I S:3 Z,� 2- � STOCKTON, CA 95209 <br /> (E)4° 3221 W. HAMMER LN. <br /> (E)4" I <br /> 5 - - Z.. <br /> LAV 4 4„ PHONE: <br /> WeI S <br /> PIPE SIZE FIXTURE UNITS •� Z�, Z, 4.. (209) 636-8909 <br /> 3° AV <br /> 1/2" 2 LAV 3.. 3.. Hs LIC. # <br /> 3/4" 9 <br /> s <br /> � 4 O <br /> 3„ _ 2„ NAME: <br /> 1 " 17 s ~ <br /> U T.B.D. <br /> IR <br /> r7 AY O VTR <br /> VTR •/ <br /> 1 -1/4' L /N�/ ADDRESS: <br /> I 4 / / �\ I..L <br /> VTR <br /> 1 -1/2" 56 i ~ <br /> zi i Z <br /> i <br /> 2» 85 Z Z O <br /> 4 k'. <br /> PHONE: <br /> zn 2° "COMIP <br /> 3-C MP <br /> 2° <br /> C.3-COMP 2" 2 <br /> WATER SUPPLY PIPE SIZING Q Hs z <br /> QROFESS/pNq <br /> � A. q�y <br /> ITEM TOTAL PLUMBING L1 �a y <br /> N0. J <br /> UNDER COUNTER <br /> GREASETNTERCCEPTOR w No. C74034 m <br /> A 3-COMP (1 .5) + 3-COMP (1.5) = 3.0 3/4 BRANCH Q <br /> Z EXP. <br /> Q Z ��qTF EO��Q <br /> B A (3.0) + HS (2.0) = 5.0 3/4" BRANCH � CIVIL <br /> z � <br /> C MOP (3.0) + WH (5.0) = 8.0 3/4" BRANCH OF CA�- <br /> D B (5.0) + C (8.0) = 13.0 1 " BRANCH PHONE:< - <br /> E F 209-263-1382 <br /> 5.0 3/4" BRANCH 0 <br /> D (2.5) + FD (2.5)= � <br /> F HS (2.0) + LAV (1 .0) = 3.0 3/4" BRANCH \ Q CONSTRUCTION SITE <br /> G F (3,0) + WC (2.5) = 5.5 3/4" BRANCH <br /> SITE ADDRESS: <br /> H E (5.0) + G (5.5) = 10.5 1" BRANCH <br /> � 3221 W. HAMMER LN. STE.A&B <br /> I <br /> STOCKTON, CA 95209 <br /> D (13.0) + H (10.5) = 23.5 1 1/4" BRANCH Q � U) <br /> 0� SITE APN: <br /> J 1 (23.5) + LAV (1 .0) = 24.5 1 1/4" BRANCH LLj 82-220-03 <br /> K J (24.5) + WC (2.5) - 26.5 1 1/4" BRANCH ( >Q DRAWING INFORMATION <br /> \ > REVISION DATE <br /> o6 4-25-19 <br /> TOTAL FIXTURE UNITS FOR BUILDING SUPPLY 26.5 DRAIN PIPE SCHEDULE Q 19-0311 -YUMMY-DONUTS <br /> TOTAL DEVELOPED LENGTH FROM METER TO FARTHEST FIXTURE = 120 FT. (USED 150) SCALE: N.T.S. DRAWING SCALE: <br /> @ 40 psi 1" BUILDING SUPPLY = OK 1/4" = 1 ' <br /> P 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.