Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: FOOD MART GAS 2185 EAST FREMONT AVE NSTOCKTON CALIFORNIA 95205 <br /> . . . . . . . . . . TLS . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . KEY <br /> A=ANNULAR Sensor <br /> . . . . . . . . . . . . F=FILLS <br /> V=VAPOR <br /> . . . . . . . . . . . P=PROBE <br /> L=Turbine/Leak Detector <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B=Brine Sensor <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S=Smart Sensor <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .112. . . . . . . . C=Floats&Chains <br /> E=E Stop <br /> . g p .87. x <br /> C) <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . XP . . . . . . . . .314. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X <br /> . . . . . . . . . . . . . /6 . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . xr 91. . . . . . . . .. . . . . . . x . . . . . . . . . . . . . . . . . <br /> L <br /> . . . . . . . . . . . . . 7/8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> XV <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> xF IE <br /> *PIPING <br /> . . . . . . . XP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (ARROWS) <br /> . . . . . . . L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drawing of piping <br /> . . . . . . . exit of sump and <br /> UDC's.No <br /> Any items underground that are not visible to the certifying technician are underground <br /> a professional opinion only and are solely for informational purposes. drawing is <br /> Drawing not to scale. accurate,we <br /> cannot speculate <br /> FREMONT STREET blue prints. <br /> Date map was drawn:9/2/20 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />