Laserfiche WebLink
Soil Suitability Report BSK Job E21-002-01B <br />Cascade BESS Project August 26, 2021 <br />Stockton, California P a g e | 8 <br />7.CONCLUSIONS <br />Based on the Soil Suitability Report, BSK Associates concludes the following: <br />·All approved septic system use should follow the EHD ON-Site Waste Disposal Standards <br />·The proposed site development would not have great impact changes on the environment as long <br />as the system size stays the same. <br />8.LIMITATIONS <br />The analyses and results submitted in this report are based upon the data obtained from the borings <br />performed at the locations shown on the Boring Location Map, Figure 1-C, from the San Joaquin County <br />EDH records shown in Appendix B, and from USGS data shown in Appendix C. The report does not reflect <br />variations which may occur between or beyond the borings. The nature and extent of such variations may <br />not become evident until construction is initiated. If variations then appear, a re-evaluation of this report <br />will be necessary after performing on-site observations during the excavation period and noting the <br />characteristics of the variations. <br />The validity of the recommendations contained in this report is also dependent upon an adequate testing <br />and observation program during the construction phase. BSK assumes no responsibility for construction <br />compliance with the design concepts or recommendations unless it has been retained to perform the <br />testing and observation services during construction as described above. <br />The findings of this report are valid as of the present. However, changes in the conditions of the site can <br />occur with the passage of time, whether caused by natural processes or the work of man, on this property <br />or adjacent property. In addition, changes in applicable or appropriate standards may occur, whether <br />they result from legislation, governmental policy or the broadening of knowledge. <br />BSK has prepared this report for the exclusive use of the Client and members of the project design team. <br />The report has been prepared in accordance with generally accepted geotechnical engineering practices <br />which existed in San Joaquin County at the time the report was written. No other warranties either <br />expressed or implied are made as to the professional advice provided under the terms of BSK’s agreement <br />with Client and included in this report.