My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2022 5:15:03 PM
Creation date
9/20/2021 8:11:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T-12 P-1 T-13 P-20 T-12-25 <br /> TRANSMIX TANK TRANSMIX PUMP WASTE WATER TANK WASTE WATER PUMP <br /> CAPACITY: 1,345 BBL CAPACITY: 300 GPM CAPACITY: 24,612 GALS CAPACITY: 300 GPM CAPACITY: 1,915 GALLONS <br /> DIMENSIONS: 18' DIA x 30' H DELTA P: 75 FT DIMENSIONS: 11.5' DIA x 32' H DELTA P: 75 FT DIMENSIONS: 4'-0" x 8'-0" x 8'-0" <br /> MATERIAL: CS HORSEPOWER: NOT AVAILABLE MATERIAL: CS HORSEPOWER: 10 HP MAT'L OF CONSTR.: DBL WALL FIBERGLASS <br /> INSULATION: NONE INSULATION: NONE <br /> LAHH LI LAHH LAHH LI LAHH <br /> 12 12 13 13 KEYED NOTES <br /> LAL LAL <br /> 0 0 0 0 <br /> 1 UNDERGROUND DRAIN PIPING FROM STRIP <br /> DRAIN TO SUMP SHALL BE DOUBLE <br /> Al DI Al DI 12 CONTAINED PIPING, MATCH EXISTING PIPING <br /> STANDBY PUMP ON 0 5 0-1 P-103 P-104 SYSTEM. <br /> o PUMP PUMP <br /> PW I I PW I I RUNNING RUNNING <br /> 12 13 12 0 12 12 12 12 <br /> LIT LSHH LIT LSHH PUMP ON LSH1 °� 10Yl <br /> 4 025H LI <br /> 025 <br /> y 12 12 y 13 13 025 0 103 <br /> 8"-VAPORY8" VAPOR <br /> TO VAPOR TANK T-16 12 0 0 0 0 0 <br /> 6" DWG. 1-10339 PUMP OFF LSL oto 0L0 0— 0 0L0 0 <br /> 025 <br /> 0 <br /> 0 <br /> MW MW <br /> 3 ° <br /> 2" T-12 TI T-13 12 I <br /> TRANSMIX WASTE WATER BIDIRECTIONAL FLOW, TYP pW <br /> M CONTACT WATER 337 0 <br /> PUMPED TO TANK T-13 2» <br /> i FA TO VRU <br /> 1 1/2" RO I 0 Q <br /> 5# 1" 1" DR 2" Q-12-339 <br /> 6" TRANSMIX 6"-TRANS IX PUMP 6 PUMP 3" WASTE WATER 3" WASTE WATER TO <br /> FROM MANIFOLD RECEIPT TRANSMIX/SLOP LOADING <br /> DWG. I-10344 6" WATER SUCTION,, 6„ 3„ SUCTI 4 — 4 4x3 <br /> DBB DRAW 4" TP-01 DWG. I-10346 <br /> 2"-P12-400-11000 <br /> 0 <br /> 3"-P12-393-11000 <br /> 0 <br /> 2" 2" 2 WATER DRAW F_ - - - - - - -i- - - - — — — — — — — INFLOW TO LIFT <br /> STATION <br /> \ o CD — — \\ PLC <br /> F <br /> HOA HOA <br /> ;0 g � 12 ;�g o 12 1 2» FROM DIESEL, REGULAR, <br /> HS HS PREMIUM & TRANSMIX <br /> �C" z103 104 12MV-1502 STORAGE <br /> CD 12 12 12 TP-02 <br /> LIT LSHH XS LEAK <br /> DETECT <br /> z z 025 025 332 <br /> N M o M <br /> .40--lk—t 1--t _L I INFLOW TO LIFT <br /> STATION <br /> 3/4" <br /> HHLL: 7'-0" <br /> n 1 1 2"-D13-035-11000/2 2" DRAIN LOADING RACK STRIP DRAIN <br /> HLL: 5'-6" _ _ _ _ _ _ _ DWGS. 794-ST-F-101 & <br /> STANDBY PUMP START 1 I-10383 <br /> O TP-03 <br /> 1/2„ HLL: 4'-0'$ <br /> PSV PUMP START <br /> 14 LLL: 1'-6" <br /> 4x2 PUMP STOP <br /> L4x3 1 P-12-103 P-12-104 <br /> 1/2 = L-- - - - - - - - - - - - - - - - - - - - - - - - - J <br /> P-20 <br /> T- 12-25 :DWG. <br /> " TRANSMIX TO <br /> 3" TRANSMIX RANSMIX/SLOP LOADING <br /> 4x3 1-10346 <br /> X X <br /> CD � <br /> " <br /> 3 <br /> 4„ ISSUED FOR <br /> CONSTRUCTION <br /> P-1 P-12-103 P-12-104 <br /> CONTACT WATER PUMP CONTACT WATER PUMP I our difference <br /> is engineered. <br /> MANUFACTURER: FLOWSERVE MANUFACTURER: FLOWSERVE www.harrisgroup.com <br /> TYPE: 1 E3x2SP-62RV TYPE: 1 E3x2SP-62RV Harris GroupREVISION "3"ONLY <br /> CAPACITY: 200 GPM CAPACITY: 200 GPM PROJECT NO: 0013556.00 <br /> DIFF HEAD: 60 FEET DIFF HEAD: 60 FEET <br /> MOTOR: 7.5 HP, 460/3/60 MOTOR: 7.5 HP, 460/3/60 DRAWN: SNH PROJ MGR: IT <br /> ENGINEER: DTH APPROVED: IT <br /> CHECKED: DTH DATE: 07/12/19 <br /> 3 10/30/19 REVISED FOR CONSTRUCTION - CONTACT WATER SYSTEM PROJECT HG DTH TRANSPORTATION TERMINALS PIPING & INSTRUMENTATION DIAGRAM <br /> STOCKTON TERMINAL TRANSMIX / SLOP SYSTEM <br /> 2 07/12/19 ISSUED FOR CONSTRUCTION - CONTACT WATER SYSTEM PROJECT HG DTH <br /> 1 9/1/17 ADDED LPC AROUND UG-5 INLET VALVE MPJ BN WRM THIS DOCUMENT IS CONFIDENTIAL AND IT SHALL NOT BE REPRODUCED OR <br /> REDISTRIBUTED WITHOUT PRIOR PERMISSION. NEITHER THE OPERATOR NOR THE OWNER <br /> 0 7/15/16 AS-BUILT PER MOC-7455 BY SUN ENGINEERING MW BM TD MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS OF THE INFORMATION SCALE NONE DATE REVISION <br /> REV DATE DESCRIPTION OF REVISION ES NO. BY ELEC MECH APP REV DATE DESCRIPTION OF REVISION ES NO. BY ELEC MECH APP CONTAINPEERSSONSED ON HAND IS RPROPERTY AS A R SUAWING, AND THE LTAOFURELIANCE MES ALL TIHEREEON.SK OF TO DRAWN MW 6/27/16 x-10343 3 <br /> NO ENGR ENGR NO ENGR ENGR <br /> 12/28/2017 MPJ 2:45pm <br />
The URL can be used to link to this page
Your browser does not support the video tag.