My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014340
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STEINEGUL
>
13664
>
2600 - Land Use Program
>
PA-2100161
>
SU0014340
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 5:03:14 PM
Creation date
9/20/2021 10:53:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014340
PE
2631
FACILITY_NAME
PA-2100161
STREET_NUMBER
13664
Direction
S
STREET_NAME
STEINEGUL
STREET_TYPE
RD
City
OAKDALE
Zip
95361-
APN
20729001
ENTERED_DATE
8/10/2021 12:00:00 AM
SITE_LOCATION
13664 S STEINEGUL RD
RECEIVED_DATE
9/16/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 2 - <br /> PA- 2100161 <br /> 4 ) The Traffic Impact Mitigation Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record . ( Resolution R - 00 -433 ) <br /> 5 ) The Regional Transportation Impact Fee shall be required for this application . The fee is due <br /> and payable at the time of building permit application . The fee will be based on the current <br /> schedule at the time of payment . ( Resolution R - 06 - 38 ) <br /> 6 ) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards . Retention basins shall be fenced with six ( 6 ) foot high chain link fence <br /> or equal when the maximum design depth is 18 inches or more . Required retention basin <br /> capacity shall be calculated and submitted along with a drainage plan for review and approval , <br /> prior to release of building permit . ( Development Title Section 9 - 1135 ) <br /> CH : DS <br />
The URL can be used to link to this page
Your browser does not support the video tag.