Laserfiche WebLink
1800 North California Street PR0231036 <br /> September 27, 2021 Program: UST <br /> PHOTO 9: 5/6/2021 DO report with incorrect date of overfill prevention a L ment inspection. <br /> underground St ge Tank 19 <br /> ora <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE <br /> Yes No NA Date last <br /> Has monitoring system certification been completed within the past Performed <br /> 12 months? m <br /> Has spill container testing been completed within the past 10126120 <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within 10128120 <br /> the past 36 months? ® 10/08/20 <br /> Has secondary containment testing been completed within the past <br /> 36 months? El <br /> 10114119 <br /> Has tank tightness testing been completed within required 0 <br /> timeframes? <br /> Has line tightness testing been completed within the required irl in 0 <br /> timeframes? <br /> Other Test/Maintenance: <br /> Other Test/Maintenance: <br /> Other Test/Maintenance: ilk ® El <br /> 11. FACILITY EMPLOYEE TRAINING <br /> Yes No <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? ✓ <br /> 13. COMMENTS <br /> This section maybe used to record comments or observations that are not current compliance <br /> deficiencies. <br /> (answers marked"No"must be described by the designated UST operator in Section 3. <br /> Page 4of4 <br /> Lydia Baker, SR. REHS Page 9 of 22 <br />