Laserfiche WebLink
SANJOARIN Environmental Health Department <br /> —COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facil it,Nan.: I Facility Address: Oat.: <br /> Gemco Ripon Truck Plaza Inc. 1022 E FRONTAGE RC, RIPON February 10, 2020 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-NOti..m Comply) <br /> Item M Remarks <br /> 613 CFR 112.7(c)Failure to provide appropriate secondary containment,diversionary structures or equipment. <br /> Appropriate containment and/or diversionary structures or equipment to prevent a discharge for the underground <br /> piping is not discussed in the SPCC plan.The appropriate containment and or diversionary structures or equipment <br /> to prevent a discharge for the loading area of the tanks is described in a part of the SPCC plan as being an oil water <br /> separator.The potential release of the loading are of the tanks was determined to be between 1 to 2,000 gallons. In <br /> parts of the SPCC plan the oil water separator is described as having an operating oil storage capacity of 1,500 <br /> gallons,this would not be sufficient to contain a 2,000 gallon release.The SPCC plan also states that a release from <br /> the pipe in the loading area would be directed into a drain which is connected to an oil water separator. Based on <br /> conversations with facility manager and observations of free flowing water near the loading area, a release from the <br /> pipe in the loading area may not make it to a drain or the oil water separator. <br /> Provide appropriate containment and/or diversionary structures or equipment to prevent a discharge as described in <br /> §112.1(b),except as provided in paragraph(k)of this section for qualified oil-filled operational equipment,and <br /> except as provided in§112.9(dx3)for flowlines and intra-facility gathering lines at an oil production facility.The <br /> entire containment system,including walls and floor,must be capable of containing oil and must be constructed so <br /> that any discharge from a primary containment system,such as a tank,will not escape the containment system <br /> before cleanup occurs. In determining the method, design,and capacity for secondary containment, you need only <br /> to address the typical failure mode,and the most likely quantity of oil that would be discharged.Secondary <br /> containment may be either active or passive in design.At a minimum,you must use one of the following prevention <br /> systems or its equivalent: <br /> (1)For onshore facilities: <br /> (i)Dikes, berms,or retaining walls sufficiently impervious to contain oil; <br /> (ii)Curbing or drip pans; <br /> (iii)Sumps and collection systems; <br /> (iv)Culverting,gutters,or other drainage systems; <br /> (v)Weirs,booms,or other barriers; <br /> (vi)Spill diversion ponds; <br /> (vii)Retention ponds;or <br /> (viii)Sorbent materials. <br /> (2)For offshore facilities: <br /> (i)Curbing or drip pans;or <br /> (ii)Sumps and collection systems. <br /> Provide appropriate containment and/or diversionary structures or equipment to prevent a discharge except for <br /> exemptions found in regulations.In determining the method,design, and capacity for secondary containment,you <br /> need only to address the typical failure mode,and the most likely quantity of oil that would be discharged. <br /> Secondary containment may be either active or passive in design or impracticability determination made as allowed <br /> by CFR 112.7(d).Amendments to this section require certification by a Professional Engineer. <br /> This is a repeat violation,Class If. <br /> FMOY5W P110516196 S0301 0210202t <br /> MAD18U1 Rcr.&SN1018 Page 9 of 16 Abaveg JPtlr Slna AC OR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjoehd.com <br />