My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:54:23 PM
Creation date
9/29/2021 9:05:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJOARIN Environmental Health Department <br /> —COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> F.cil it,Nan.: I Facility Address: D. <br /> Gemco Ripon Truck Plaza Inc. 1022 E FRONTAGE RC, RIPON February 10, 2020 <br /> SUMMARY OF VIOLATIONS <br /> ICLASS I,CLASS II,or MINOR-NOti..m Comply) <br /> Item M Remarks <br /> 623 CFR 112.7(g)Plan failed to address security of site and valves,lock out/tag out,and lighting. <br /> The SPCC plan is inconsistent in addressing the appropriateness of security lighting to both prevent acts of <br /> vandalism and assist in the discovery of oil discharges. In one part of the SPCC plan,it certifies that the lighting is <br /> adequate and in another part of the SPCC plan,it states that the lighting is not adequate. <br /> Security(excluding oil production facilities).Describe in your Plan how you secure and control access to the oil <br /> handling, processing and storage areas; secure master flow and drain valves;prevent unauthorized access to <br /> starter controls on oil pumps;secure out-of-service and loading/unloading connections of oil pipelines;and address <br /> the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil <br /> discharges. <br /> The SPCC plan must address the requirements of security and lighting and be consistent and not contradictory to <br /> other sections of the plan.Amendments to this section will require a Professional Engineer certification. <br /> This is a Class II violation. <br /> FMOY5W P110516196 S0301 0210202t <br /> MAD18U1 R—QcocW9 Page 11 of 16 Abaveg JPtl —SWr AC OR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjoehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.