My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:54:23 PM
Creation date
9/29/2021 9:05:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJOARIN Environmental Health Department <br /> —COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facil it,Nan.: I Facility Address: Oat.: <br /> Gemco Ripon Truck Plaza Inc. 1022 E FRONTAGE RC, RIPON February 10, 2020 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-NOti..m Comply) <br /> Item M Remarks <br /> 714 CFR 112.8(cx8)0-iv)Failed to provide each container with a high level monitoring device. <br /> The high level monitoring device described in the SPCC plan was stated to not be functional and was not being <br /> used as a high level monitoring device.The SPCC plan describes a direct vision guage for the tanks.The direct <br /> vision gauges on the tanks were described as being non-functional.The SPCC plan does not describe the actual <br /> high level monitoring device being used by the facility. It is stated in the SPCC plan that 55 gallon drums regulated <br /> under APSA are not refilled and therefore do not require a high level monitoring device. It was stated by facility <br /> personnel that the 55 gallon drums are refilled at the facility once they are emptied out. <br /> Engineer or update each container installation in accordance with good engineering practice to avoid discharges. <br /> You must provide at least one of the following devices: <br /> (i)High liquid level alarms with an audible or visual signal at a constantly attended operation or surveillance station. <br /> In smaller facilities an audible air vent may suffice. <br /> (ii)High liquid level pump cutoff devices set to stop flow at a predetermined container content level. <br /> (iii)Direct audible or code signal communication between the container gauger and the pumping station. <br /> (iv)A fast response system for determining the liquid level of each bulk storage container such as digital computers, <br /> telepulse,or direct vision gauges. If you use this alternative,a person must be present to monitor gauges and the <br /> overall filling of bulk storage containers. <br /> (v)You must regularly test liquid level sensing devices to ensure proper operation. <br /> The SPCC plan must address the current high level monitoring device in use by the facility or the SPCC plan must <br /> be implemented as written or an environmental equivalence claim made as allowed by CFR 112.7(ax2).An <br /> amendment to this section in the SPCC plan will require certification by a Professional Engineer <br /> This is a repeat violation,Class If. <br /> 718 CFR 112.8(cx11)Failed to locate properly or provide sufficient secondary containment for mobile/portable <br /> containers. <br /> Mobile or portable oil storage containers did not have a secondary means of containment sufficient to contain the <br /> capacity of the largest single compartment or container with sufficient freeboard to contain precipitation.A 55 gallon <br /> drum of liquid with petroleum product was observed on a secondary containment pallet that did not appear to be <br /> able to contain the 55 gallons of liquid and precipitation.The secondary containment pallet appeared to hold <br /> approximately 25 gallons.A second 55 gallon drum of liquid with petroleum product was observed without <br /> secondary containment as described in the SPCC plan.The second 55 gallon drum was not observed on a <br /> secondary containment pallet,which is the secondary containment required by the SPCC plan.It was not <br /> immediately evident that the second drum had any secondary containment. <br /> Position or locate mobile or portable oil storage containers to prevent a discharge as described in §112.1(b).Except <br /> for mobile refuelers and other non-transportation-related tank trucks, you must furnish a secondary means of <br /> containment,such as a dike or catchment basin,sufficient to contain the capacity of the largest single compartment <br /> or container with sufficient freeboard to contain precipitation. <br /> Provided all mobile or portable oil storage containers with secondary containment as required by the SPCC plan. <br /> The secondary containment must be capable of containing the capacity of the largest single compartment or <br /> container and have sufficient freeboard to contain precipitation. <br /> This is a repeat violation,Class If. <br /> FMOY5W PR05161S1 S0301 0210202t <br /> E111)18U1 Rcr.QcQcW8 Page 14 of 18 Abaveg JPtl —SWr AC OR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 488-3420 1 F 209 4840138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.