O
<br /> GENERAL PLANTING D. AMENDMENTS
<br /> K. TREE STAKING
<br /> A. GENERAL 1 . Nitrogen stabilized organic amendment shall be a ground or processed AM
<br /> wood product derived from wood of redwood, fir or cedar, treated with a Trees shall be staked at time of planting as indicated in the details on D. TURF AV M
<br /> I . Contractor shall provide all labor, materials and equipment for the non-toxic agent to absorb water quickly. Nitrogen content, based on dry the drawings. 80 pounds per acre in summer, 120 pounds per acre in winter ® "i� � �®®m_ �
<br /> !� s ii i )pie a
<br /> installation of plant material as indicated on the drawings and as specified weight, shall be 0.5% for redwood and 0.7% for fir and cedar. Iron In turf areas where soil is prepared with Gro-Power Plus, use 400 1 . Prior to acceptance of the protect and maintenance period, turf areas ® ®®®® `�
<br /> herein. content, based on dry weight, shall be 0. 1 %. Pine sawdust is not L. GUARANTEE pounds/acre. shall be established with a uniform 80% coverage, healthy vigorous growth 00!=1)
<br /> acceptable. and to a minimum of two inches (2") in height. Costs incurred for repair or �®Ar® ®MN _
<br /> 2. Contractor shall coordinate planting with other site improvements. I . Contractor shall guarantee plant material through on (I) full year after 4. Seed mixture shall be as indicated on the drawings. replacement of bare, sparse or damaged areas shall be the responsibility AIN ov l(11 i i
<br /> ff Aft
<br /> Unless otherwise specified, structural improvements shall be installed prior 2. When requested, Contractor shall furnish the Owner with a delivery the date of acceptance of the work. of the Contractor. "���$% ftW4q;"
<br /> to planting operations. receipt and Certificate of Compliance stating that the material substantially 5. Water shall be fresh, free of impurities, excess chlorine and salts.
<br /> meets the specifications. 2. Replacement plant material shall be of the same species, variety, * size 2. If an agricultural suitability soils report is not available, turf areas shall INV'
<br /> 3. Contractor shall be responsible for locating and staking existing sewer, as originally planted and shall be guaranteed for one (I ) full year from the G. Fiber shall be clean, weed-free mulch of wood cellulose containing no be fertilized with GRO-Power 11i-nitro en 14-4-9 or roved equal
<br /> water and utility lines above or below grade that might be damaged as a date, lantin germination or growth-inhibiting factors. Fiber shall contain a harmg pp q every ©2017 STARBUCKS COFFEE COMPANY
<br /> e ore-planting. less,
<br /> rsult of planting operations. Contractor shall assumsole responsibility E. TOPSOIL p temporary green dye. forty-five (45) calendar days, at a rate recommended by the manufacturer.
<br /> ee
<br /> for any cost incurred due to damage and for replacement of I . Topsoil shall consist of fertile, friable soil of loamy character, and shall 3. Cost incurred due to replacement of dead or dying plant material shall 3. First mowing of turf shall be performed when the grass is two and STARBUCKS COFFEE
<br /> aforementioned utilities. contain an amount of organic matter normal to the area. It shall be be the responsibility of the Contractor. C. INSTALLATION one-half inches (2 %2") in height. After initial mowing. Turf shall be cut as
<br /> reasonably free from weeds, refuse, roots, heavy or stiff clay, stones often as necessary to maintain the turf at a height of two inches (2") for COMPANY
<br /> 4. All work on the irrigation system, including hydrostatic, coverage, and PLANTING - SODDED TURF uda. 2401 UTAH AVENUE SOUTH
<br /> larger than one inch ( I ) in diameter, sticks, brush, litter and other I . Mixing shall be performed in a tank, with abuilt-in continuous agitation bluegrass and fescues and one inch (I ) for Berm
<br /> operational tests, and the backfilling and compaction of trenches shall be deleterious substances. Topsoil may be obtained from the site if and re-circulation system, of sufficient operating capacity to produce a SEATTLE, WASHINGTON 98134
<br /> performed prior to planting operations. approved by the Owner. A. GENERAL homogeneous slurry and a discharge system which will apply the slurry to 4. Contractor shall trim around irrigation heads to allow for unimpeded 1 (206) 318-1575
<br /> the designated areas at a continuous and uniform rate. spray; at the base of trees; and at borders along walks, mowstrips and
<br /> 5. Samples of fertilizers, soil conditioners, seed, or other materials shall 2When required, imported topsoil shall be subject to inspection and This section is suppcurbs.lemental to the General Planting 5ection. Where THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> .
<br /> o be submitted to Owner forty-eight (48) hours prior to incorporation in the applicable, planting shall be in accordance with conditions therein. CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> N work. testing at the source of supply prior to delivery to the protect. 2. The slurry preparation shall take place at the protect site and shall PROPERTY OF STARBUCKS CORPORATION,
<br /> OS begin by adding water to the tank when the engine is at halt throttle. 5. Contractor shall remove all grass clippings from protect site. WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> NI
<br /> F. MATERIAL DELIVERY AND INSPECTION B. PLANT MATERIAL QUALITY When the water level has reached the height of the agitator shaft, good THIS WORK. THEY SHALL NOT BE G. An agricultural suitability and fertility analysis soils report shall take recirculation shall be established, and at this time the seed shall be added. REPRODUCED (IN WHOLE OR IN PART), SHARED
<br /> p precedence over these specifications. I . Plant material shall be delivered with legible identification labels, I . 50d shall be grown from high quality propagative material, free from Fertilization shall then be added followed by the wood cellulose fiber, when E. GROUND COVER AREAS WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> C:) handled and stored adequately to maintain a healthy condition, protecting weeds diseases, and insects, and shall be in accordance with the the tank is at least one-third ( 1/3) filled with water Spraying shall ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> standards for re ulation for nurser ins ection of the licable, State of commence immediate) when the tank is full. If an agricultural suitability soils report is not available, ground cover areas PROJECT WITHOUT THE PRIOR WRITTEN
<br /> �I B. PLANT MATERIAL QUALITY them from drying out, windburn or any other injury. 9 Y I' pp Y
<br /> the protect. shall be fertilized with GRO-Power Hi-nitrogen 114-4-9 or approved equal CONSENT OF STARBUCKS CORPORATION.THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> I . Plant material, shall be in accordance with the State Department of 2. Inspection of plant materials required by City, County, State or 3. Contractor shall spray designated areas with the slurry in a sweeping every forty-five (45) calendar days, at a rate recommended by the INTENDED TO EXPRESS DESIGN INTENT FOR A
<br /> Federal authorities shall be the res onsibilit of the Contractor. When 2. Sod shall be machine cut at a uniform thickness of five-eighths of an motion, in an arched stream, until a uniform coat is achieved and the manufacturer. PROTOTYPICAL STARBUCKS STORE WHICH IS
<br /> Agricultures regulations for nursery inspections, rules and grading. All p Y
<br /> 05 plants shall be of No. I Grade and have a normal habit of growth, and shall requested, Contractor shall furnish copies of such permits or certificates inch (5/8") (excluding top growth and thatch). Individual pieces shall be cut material is spread at the required rate per acre. F. TREES SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> be sound, healthy, vigorous and free of insect infestations, plant diseases, to Owner. to the supplier's standard width and length with an allowable deviation of NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> c> two percent (2%). Broken rolls or uneven ends will not be acceptable. 4. A slurr mixture which has not been applied within four (4) hours after NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> CZ sun scalds, fresh bark abrasions or other objectionable disfigurements. All p Y pp I . If required or at the direction of the Owner, trees planted as part of NOR LIABILITY TO THE OTHER (EXCEPT STATED
<br /> lants shall have a normal, well-develo ed branch s stem and vi orous and G. 501L PREPARATION (TURF AND GROUND COVER AREAS) mixing shall be rejected and replaced at the Contractor's expense.
<br /> I p p Y 9 the Contract shall be pruned or headed back, to eliminate diseased or ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br /> C:) fibrous roots stem which is not root bound and is free of kinked or 3. Sod shall be harvested, delivered and installed within atwenty-four
<br /> � Y damaged growth, reduce topping or wind damage, maintain growth within FULLY EXECUTED BY BOTH PARTIES.
<br /> girdling roots. I . Fertilizin and conditioning materials shall be ass ecified in the project (24) hour period. 5. 5lopes shall be hydroseeded after weed abatement operations and
<br /> 9 9 9 9 p p J space limitations, maintain natural appearance, due to vandalism, and to
<br /> LO agricultural suitabilitY of trees and shrubs
<br /> re ort. planting .
<br /> 9 p balance the crown with the root structure.
<br /> X4. Contractor shall furnish the Owner with delivery receipts and a ARCHITECT OF RECORD
<br /> m 2. Nursery growth stock shall be selected from high quality, well-shaped
<br /> 120 stock, grown under climatic conditions similar to those in the project 2. If an agricultural suitabilit report is not available, the following Certificate of Compliance stating that the material substantially meets the G. Costs incurred for repair or replacement of bare, sparse or damaged mcg architecture
<br /> 9 p J g Y p g s eCIfications. areas shall be the res onsibilit of the Contractor. 2. 5taking of trees shall be checked frequently for damage, and to o
<br /> locale. Minimum acceptable size of plants as indicated in the drawings amendments, or approved equal, shall be mechanically spread and uniformly p p y prevent chaffing or girdling. Costs incurred due to damage or
<br /> L0 shall correspond with that normally expected for the species and variety cultivated into the upper six inches (G") per 1 ,000 square feet of soil by replacement due to improper stakin materials shall be the res onsibilit > o -
<br /> of commercial) available nurse stock. suitable e ui mento operated at approximately right ht an les in at least two C. INSTALLATION pg p y
<br /> Y q p p pp Y g g POST-INSTALLATION MAINTENANCE PERIOD of the Contractor.
<br /> O (2) directions: 1 . Prepare soil and provide weed abatement operations in accordance "'
<br /> 3. Where applicable, caliper shall be the diameter of the trunk one foot OS with the General Planting 5ection. Rake, cultivate, float and roll until areas A. GENERAL 3. At the request of the Owner, wounds over one and one-half inch (I
<br /> N (I ) above the ground surface. 4 CY Nitrogen stabilized organic amendment to receive turf are in a smooth and uniform condition. %2") in diameter may be sealed with an approved tree seal. 15635 Alton Parkway, Suite 100, Irvine,CA 92618
<br /> N150 LBS Gro-Power Plus P:949.553.1117 F:949.474.7056
<br /> pl 4. Oversize plants may be used if not root bound, but shall not increase 100 L55 Agricultural gypsum 1 . Contractor shall provide all labor, materials and equipment to perform 4. Dead or clin trees shall be immediate) replaced at the Contractor's
<br /> 2. Finish grade for turf areas shall be one inch (I ) below the finish work Burin the Post-Installation Maintenance Period, ass ecified herein, Y 9 Y p
<br /> U the Contract price. Up to ten percent (10%) of undersized plants in any g p ex ense with material of the same s eCes and size and guaranteed as LANDSCAPE
<br /> surface of walks, curbs, or related hardscape. including but not limited to; adequate watering of )ant material, replacing p p g
<br /> 0 one (I) variety and grade may be used; provided they are larger than the 3. Resulting soil shall be clean, n a friable condition and suitable for g q g p p g described in these specifications. ARCHITECT STAMP �PNDscgpF
<br /> C:) average size of the next smallest rade. lantin unsuitable plant material and controlling weeds, rodents and other pests. o s w, rR ��,
<br /> g g planting. 3. Prior to sodding, soil shall be moist to a minimum depth of one inch =�` ,� °�� �y
<br /> N 5. Contractor shall exercise preventive measures when using
<br /> H. WEED ABATEMENT OPERATIONS (1 ) 2. Contractor shall maintain the protect on a continuous basis from the No. 2242
<br /> 5. 5cientific and common names conform to customary nursery usage. "weed-eaters" near tree trunks. Costs incurred due to damage or U Exp. 10/31/20
<br /> II first day after planting is completed, until acceptance of the work.
<br /> 0- G. T es and sizes of plant materials shall be as indicated on the I . The irrigation system and finish grade shall be completed prior to
<br /> 4. Prior to installation, area to be sodded shall receive sulfate of ammonia replacement of trees due to improper measures shall be the responsibility
<br /> .� Yp p at the rate of one (I) pound per 200 s uare feet. of the Contractor.
<br /> (n drawings. Quantities shown are a guide only; Contractor shall verify weed abatement operations. p p q 3. Costs incurred due to damage or replacement during Post-Installation
<br /> Q) quantities by plan check. Maintenance Period shall be the responsibility of the Contractor. F of CNO �
<br /> U) 2. Contractor shall operate the irrigation system to keep planting areas 5. 50d shall be laid and tamped with butt joint in a staggered "running G. SLOPES
<br /> 70 uniform) moist for period of three (3) weeks (2 1 consecutive calendar bond" pattern. 4. Unless sti ulated otherwise b the Owner, the Post-Installation
<br /> 0 7. The Owner reserves the right to refuse or refect any unsuitable plant Y p p y I . Prior to acceptance of the project and maintenance period, slo es
<br /> material. Unsuitable plants shall be removed from the project site and days). At the end of the three (3) week period, Contractor shall spray all Maintenance Period shall consist of a minimum of ninety (90 consecutive p p J p p
<br /> replaced at the Contractor's expense. Replacement plants shall be the visible weeds with a contact herbicide. Application method shall be as G. After installation, sod shall be rolled with a 200-pound water-filled calendar days. shall be established with a uniform 80% coverage, healthy vigorous CHARLES
<br /> same species, variety, size and conditions as specified. recommended by manufacturer. After spraying, planting areas shall remain lawn roller. growth. Costs incurred for repair or replacement of bare, sparse or TROWBRIDGE
<br /> p unwatered for a minimum of forty-eight (48) hours. Remove weeds from 5. Post-Installation Maintenance Period may be extended b the Owner if damaged areas shall be the responsibility of the Contractor. AND ASSOCIATES
<br /> Y Y 17901 ROMELLE AVENUE
<br /> U site. 7. 5od shall be as indicated on the drawings. the project is improperlymaintained, appreciable replacement is required, SANTA ANA,CA.92705
<br /> 8. Pruning of plant materials shall not be done prior to delivery. After p j pp p q Cta PH(714)532-3663 FAX(714)532-3667
<br /> M or other corrective work becomes necessar 2. Seed for replacement shall be of the same type and quality ratio as chas2.ctaegmail.com
<br /> planting, pruning shall be limited to the minimum necessary to remove PLANTING - HYDR05EEDING Y specified in the Plant List on the drawings. LANDSCAPE ARCHITECTURE LIC.#2242
<br /> L injured twigs and branches, dead wood and suckers. 3. Water seven (7) additional consecutive calendar days from the first B. EXECUTION
<br /> Q application and apply a contact herbicide as may be necessary. After A. GENERAL 3. If a soils report is not available, slopes shall be fertilized with
<br /> N9. Plant material is subject to substitution based upon availability. second spraying, water shall not be applied for an additional forty-eight w
<br /> hour eriod. A lications shall continue at seven (7) da intervals as I . All areas including, but not limited to, turf, ground cover, and concrete Gro-Power Hi-nitrogen 14-4-9 or approved equal every forty-five (45)
<br /> 5Ub5tltUted material shall be approved in advance by the Owner. p pp Y This section is su lemental to the General Planting 5ection. Where
<br /> U) determined by the Owner. pp 9 flatwork, shall be kept clean and free of weeds, litter and debris. calendar days, at a rate recommended by the manufacturer.
<br /> Z applicable, planting shall be in accordance with conditions therein. N
<br /> `- C. FERTILIZERS � N
<br /> QB. PLANT MATERIAL QUALITY 4. Contractor shall apply spray chemicals when air currents are still; 2. Subsurface drains and catch basin grates shall be kept clean of leaves, H. PALM TREE5 Q L0
<br /> U
<br /> I I . Fertilizers shall comply with applicable requirements of the State preventing drifting onto adjoining property and preventing litter and debris to ensure unimpeded of water. Drain lines shall > 0')any toxic p p g
<br /> Agricultural Code and shall be packaged, first rade, commercial ualit ex osure to ersons whether or not the are in or near the project. be periodically flushed with clear water to avoid build-up of silt and debris. I . Maintenance shall include, but not limited to, spraying to control or Q Q
<br /> p g p g 9 q Y p p Y p J I . Seed shall be fresh, clean, pure new crop seed. Seed shall be prevent disease and week) water management including soil robin
<br /> products identified as to source, type of material, weight and delivered to the site, unmixed, in separate sealed containers. Each sealed p y g g probing, U
<br /> p manufacturer's guaranteed analysis. Fertilizers shall not contain toxic 5. Weeds and debris shall be disposed of off-site. container shall bear the seed su liers to indicating the container weight, 3. Before weeds exceed two inches (2 ) in height, they shall be removed observation of soil moisture sensing devices (where applicable), and palm O6 U) U
<br /> pp g g g and disposed of off-site. 5eriou5 weeds shall be spot sprayed and left in tree pruning. LU LL z
<br /> C/) ingredients in quantities harmful to human, animal, or plant life. When seed type, seed purity and germination, and certificate of release by a w
<br /> I I. BACKFILL place for seven (7) calendar days. Areas sprayed shall remain unwatered
<br /> o requested, Contractor shall furnish the Owner with Certificate of County agricultural commissioner. 2
<br /> for a minimum of forty-eight (48) hours. Dead weeds shall be removed 2. Pruning shall be done with sterilized reciprocal saws (not chain saws) Z Q Q
<br /> Q Compliance stating that the material substantially meets the specifications. 9 p �
<br /> CZ I . Backfill shall be as specified in the project agricultural suitability report; seven (7) calendar days after application and disposed of off-site. to prevent transmission of disease causing agents from tree to tree. Saw
<br /> 2. Contractor shall furnish the Owner with delivery receipts and a H - � 0-
<br /> 06
<br /> U
<br /> 2. Commercial fertilizer shall be a elleted, beaded, or ranular product machine-mixed and approved by the Owner prior to incorporation in blades shall be sterilized before and between pruning of each frond by U U
<br /> � p 9 p Certificate of Compliance stating that the material substantially meets the 4. If the Owner notifies the Contractor of failure to control weeds as
<br /> having the chemical anal sis s ecified herein and shall be free-flowin planting pits. immersing the blade in a solution of fifty percent (50) household bleach W W p
<br /> v 9 Y p 9 specifications. ) Q
<br /> material delivered in original unopened containers. Use of material which specified herein, the Contractor shall kill all weeds within ten (10) calendar and fifty percent (50%) water for five (5) minutes. The solution should be O Q O
<br /> CZ becomes caked or otherwise damaged shall not be permitted. 2. If a agricultural suitability report is not available, the following days of such notification. The Post-Installation Maintenance Period will be kept up to strength by the regular addition of more bleach. � o
<br /> n g p amendments ora roved e ual, shall be incorporated: 3. An agricultural suitability report that has been prepared for the specific extended for every day after the ten ( 1 0) calendar days until such weeds 0- I..L
<br /> pe q p site shall take precedent over the following materials. If such report is not have been killed.
<br /> 0 3. Organic base fertilizer shall be tom rased of decom osed animal, fish G parts by volume On-site soil I. INSPECTION
<br /> 9 p p available, the following materials shall be of such a character that when
<br /> and vegetable matter with humic acids and a bacterial stimulant, 4 parts by volume Nitrogen stabilized organic amendment dispersed in a uniform slurry shall form an absorbent porous mat: STORE #: 5470
<br /> LID per k
<br /> ll t
<br /> 5h
<br /> all Contractor C
<br /> 5
<br /> 17 LBS CY of mix Gro-Power Plus . onacosaae apprrt
<br /> opiae stteliminate,
<br /> eps o rodents.
<br /> manufactured as Gro-Power by Southern California Organic Fertilizer Co., pUpon completion of the Post-Installation Maintenance period, Contractor PROJECT #: 03030-052
<br /> Glendale, California, or roved e ual. I LB per CY of mix Iron sulfate shall re uest an ins ection for acceptance of the work performed in
<br /> m pp q 3000 gallons per acre Fresh water q p p p PROFILE TYPE: CORE
<br /> U) 10 L55 per CY of mix Agricultural gypsum 2000 pounds per acre Wood cellulose fiber C. IRRIGATION SYSTEM accordance with the Contract Documents. The request shall be made to
<br /> 80 pounds per acre" Organic stabilizer the Owner, a minimum of seven (7) calendar days prior to the date for ISSUE DATE: CHECKSET 2-10-20
<br /> J. I1\15TALLATION 1000 pounds per acre" Gro-Power Plus, or approved equal I . Contractor shall operate the irrigation system automatically and shall inspection. PROGRAM MANAGER: M.DREBIKA
<br /> 00
<br /> properly and completely maintain all parts of the irrigation system. STORE DESIGNER: M.DREBIKA
<br /> X I . Stake plant locations and secure approval from the Owner before LEED®AP: N/A
<br /> mexcavating pits. Excavated pits shall be as indicated in the details on the 2. Contractor shall provide for delivery of water in sufficient quantities CHECKED BY: A.FELDMAN
<br /> drawings. Dust sides of pits with gypsum before backfilling. and adjust water application to compensate for seasonal conditions. MCG PROJECT#: 18531
<br /> 6 MCG PROJ. MANAGER: C.LEE
<br /> 0 2. Containers shall be opened and removed such that the rootball is not 3. Costs incurred due to repair or replacement of equipment shall be the
<br /> MCG PROJ. SPECIALIST: SPARK
<br /> v injured. responsibility of the Contractor. Replacement parts shall be identical to
<br /> Q) the material and as indicated on the drawings and specified herein.
<br /> 0 3. Water all planting areas thoroughly after installation of plant materials. Revision Schedule
<br /> n Additional backfill shall be added to fill voids caused by water settlement.
<br /> 00 Rev Date By Description
<br /> 0
<br /> N
<br /> Q SHEET TITLE:
<br /> Ln
<br /> O
<br /> SPECIFICATIONS
<br /> SCALE: AS SHOWN
<br /> 0
<br /> O SHEET NUMBER:
<br /> N
<br /> c7
<br /> N LS-3
<br /> co
<br />
|