Laserfiche WebLink
FINISHED END PANEL <br /> OF CASEWORK .�► <br /> CAVO CAVO CAVO <br /> OUTLINE OF FOOD CASE IN, <br /> J `_O `_O SIDE PANEL J O <br /> 0I.- <br /> �` ` �` � BULLNOSE SANITARY ` <br /> v �Pv 3/8" COVED TILE BASE \AN ©2011 STARBUCKS COFFEE <br /> TILE FLOORING STARBUCKS COFFEE <br /> 0, COMPANY <br /> 2401 UTAH��CJ �� EATTLE WA vHlINUT SOUTH4 <br /> W\E, S S G O 98 3 <br /> FRP WALL (206) 318-1575 <br /> WALL AND COVERING <br /> SHEATHING THESE DRAWINGS AND SPECIFICATIONS ARE <br /> CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> PER PLAN STAINLESS STAPLE PROPERTY OF STARBUCKS CORPORATION, WHICH IS <br /> OR POWDER COATED THE OWNER OF THE COPYRIGHT IN THIS WORK. <br /> FASTENER TILE BASE — CAB. ADJ. TO FOOD CASE THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN <br /> PART), SHARED WITH THIRD PARTIES OR USED IN AN <br /> ECO-GRIP ECO-GRIP BASE scale: 3" <br /> U �U 1'-0" MANNER ON OTHER PROJECTS OR EXTENSIONS TO <br /> O = <br /> SEALANT CAP. COLOR TO THIS PROJECT WITHOUT THE PRIOR WRITTEN <br /> MATCH ECO-GRIP CONSENT OF STARBUCKS CORPORATION. THESE <br /> N <br /> FLOORING DRAWINGS AND SPECIFICATIONS ARE INTENDED TO <br /> Q EXPRESS DESIGN INTENT FOR A PROTOTYPICAL <br /> STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE <br /> AT ANYTIME)AND DO NOT REFLECT ACTUAL SITE <br /> 06 CONDITIONS. NEITHER PARTY SHALL HAVE ANY <br /> U OBLIGATION NOR LIABILITY TO THE OTHER(EXCEPT <br /> ECO-GRIP COLOR STATED <br /> FULBLOY EXECUTED YRBOTH PARTIES.ENT IS <br /> al MATCHED SPEEDFLEX. <br /> ECO-GRIP <br /> C) SLOPE TO FLOOR SINK <br /> EPDXY O CASEWORK <br /> CONCRETE <br /> ADHESIVE �j = ARCHITECT OF RECORD <br /> U-) �j <br /> SLAB - - 1/8" (3MM) GAP BETWEEN �" o <br /> _ <br /> X ECO-GRIP FLOORING AND FIXTURE O <br /> m ECO-GRIP <br /> FLOORING CONCRETE J � � � o - <br /> �I 1/4" SLAB `` �` BULLNOSE SANITARY <br /> j / FLOOR SINK AND GRATE (6MM) Pv / 3/8" COVED TILE BASE U, <br /> L SLOPE ROUTED ECO-GRIP <br /> 1 00 <br /> COVE FLOORING A`�`O TILE FLOORING <br /> `v <br /> mcg architecure <br /> N d a a,- L4=/ <br /> 15635 Alton Parkway, Suite 100, Irvine, CA 92618 <br /> NP:949.553.1117 F:949.474.7056 <br /> N ARCHITECT STAMP <br /> o SED A c <br /> rn ECO- GRIP EPDXY P <br /> GE WINS <br /> N ADHESIVE <br /> 1839 <br /> a ECO-GRIP TO FLOOR SINK TRANSITION BASE CAP WITH FRP TILE BASE - CABINETS 9� ' <br /> 11 <br /> ( 9 <br /> �/ scale: 12" = V-0" (��) ECO-GRIP <br /> scale: 6" = V-0" 1\ scale: 3" = V-0" Q.�~ <br /> N F CALIFO <br /> C7 <br /> N <br /> ui BASE TILE @ PERIMETER <br /> rj WALL ABOVE CONC. CURB <br /> SCHLUTER <br /> C) TRANSITION STRIP LAP VERTICAL AND <br /> HORIZONTAL BASE <br /> CONCRETE ` TILES <br /> QSLAB 1/4" ECO-GRIP <br /> SPEEDFLEX a O <br /> N TILE FLOOR <br /> BULLNOSE <br /> ECO-GRIP FLOORING ad ' SANITARY 3/8" _`O� 3/8 COVED TILE BASE <br /> PER PLAN J <br /> Z :. ° COVED TILE BASE HEIGHT O <br /> d ° CUT TO FIT HEI <br /> a ` `` Lo <br /> U Q �. "- OF CURB PVv w � <br /> a <. <br /> ° d `O� TILE FLOORING C > <br /> d G Q <br /> ,9 - <br /> ° TILE FLOORING <br /> d <br /> 06 <br /> Lij <br /> oo <br /> d z LL Z <br /> _ _ L.L <br /> Lij <br /> - d ° rv_ <br /> Q d cJ P a LL m <br /> z <br /> Q i <br /> SUBSTRATE MAY REQUIRE SLOPING ECO-GRIP EPDXY <br /> TO ADJUST HEIGHT SO THAT ECO-GRIP ADHESIVE d ! , <br /> 06 AND ADJACENT FLOOR ARE FLUSH W W U <br /> 0 O <br /> 11 <br /> 0 0o <br /> a a U) <br /> ECO-GRIP TO TILE TRANSITION - OPTION B TILE BASE - CONC. CURB, RO SYSTEM TILE BASE - INTERIOR WALL <br /> � 18 *S. 2 STORE #: 5470 <br /> sca e: 3" = V-0" <br /> � Scale: 12" = 1'-0" ale: 3" = 1'-0" PROJECT #: 03030-052 <br /> X <br /> m CASEWORK CONCEPT: CORE <br /> WI ISSUE DATE: CHECKSET 2-10-20 <br /> u7 <br /> FINISH PANEL PROGRAM MANAGER: M.DREBIKA <br /> 00 FRPSTORE DESIGNER: M.DREBIKA <br /> % DIE WALL STOREFRONT DOOR LEED�AP: N/A <br /> X -- -- ---- - NEW OR EXISTING AND THRESHOLD <br /> INTEGRAL BULLNOSE WALK OFF MAT CHECKED BY: A.FELDMAN <br /> m MOP SINK MCG PROJECT#: 18531 <br /> TILE EBASE TARY 3/8" COVED 3/8" (10MM) METAL MCG PROJ. MANAGER: C.LEE <br /> PLASTIC�O C�!'O !'O EDGE OR SIMILAR FOR <br /> �`� (IF REQ HIM 1/4' nLEXCO-GRIP `CJ`(i DESIGN INTENT. SLIDE MCG PROJ. SPECIALIST: SPARK <br /> U �O'C �O'C METAL LEG UNDER MAT. <br /> CLIP LEG EDGE AS Revision Schedule <br /> TILE FLOORING ECO-GRIP J <br /> d FLOORING ` �` CURVE. <br /> ED TO FIT A 2 <br /> 00 O\APv Ov � 1 Rev Date By Description <br /> ECO-GRIP EPDXY `v <br /> cV G�'C� ADHESIVE `'C� A`P <br /> 'C V CONCRETE SLAB <br /> NOTE: G P <br /> MECHANICALLY SAND AND SCARIFY WOOD SUBSTRATE TO <br /> d `� COMPLETELY REMOVE ALL FINISH. TROWEL ON A PRIMER COAT OF WATERPROOF SHEET TITLE: <br /> �� MAGPIE 'TYPE 1, KERI 903'ADHESIVE AND ALLOW TO AIR REAPPLY W\E, <br /> MEMBRANE, (ONLY IF ON FLOOR FINISH DETAILS <br /> 00 NOTCHED TROWEL COAT OF KERI 903 ADHESIVE AND INSTALL TILE PER ° d" a b '= a WOOD SUBFLOOR) <br /> SPECIFICATIONS. d' _ <br /> METAL FLOOR TRANSITION <br /> �j SCREEN EMBEDDED IN SCALE:AS SHOWN <br /> TILE GROUT <br /> TILE SHEET NUMBER: <br /> N 13 TILE BASE - DIE WALL 9 ECO-GRIP AT MOP SINK 1 FLOOR TILE - ENTRY <br /> N scale: 3" = V-0" Scale: 12" = V-0" scale: 3" = V-0" <br /> 1501 <br /> c� <br />