Laserfiche WebLink
ELECTRICAL PLAN NOTES ELECTRICAL GENERAL NOTES �► <br /> ODUCT SMOKE DETECTOR AND RELAY FOR HVAC UNIT SUPPLY FAN SHUTDOWN SHALL O DISCONNECT SWITCH IS PROVIDED BY EQUIPMENT MANUFACTURER, INTEGRAL WITH A. ANY EXISTING CONDITIONS INDICATED IN THIS SET OF DRAWINGS ARE BASED ON <br /> BE FURNISHED BY THE ELECTRICAL CONTRACTOR FOR INSTALLATION BY THE EQUIPMENT. PROVIDE CIRCUIT AND FINAL CONNECTION TO DISCONNECT SWITCH AS INFORMATION PROVIDED BY OTHERS AND POSSIBLE LIMITED FIELD VERIFICATION. <br /> MECHANICAL CONTRACTOR. DUCT SMOKE DETECTOR SHALL BE SYSTEM SENSOR INDICATED. THE CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO <br /> #4120 OR EQUAL. THE ELECTRICAL CONTRACTOR SHALL PROVIDE 120 VOLT WIRING Og WEATHERPROOF GFCI SERVICE RECEPTACLE IS PROVIDED BY EQUIPMENT ADDITIONAL EXPENSE TO THE OWNER. � <br /> TO THE DUCT SMOKE DETECTOR AND CONNECT TO SPARE 20 AMP, 1 POLE CIRCUIT MANUFACTURER, INTEGRAL WITH EQUIPMENT. PROVIDE CIRCUIT <br /> BREAKER WITH HANDLE LOCK-ON ACCESSORY. THE ELECTRICAL CONTRACTOR AND FINAL CONNECTION TO SERVICE RECEPTACLE AS INDICATED. B. THE CONTRACTOR SHALL VISIT THE PROJECT SITE, REVIEW EXISTING CONDITIONS <br /> SHALL ALSO PROVIDE A SYSTEM SENSOR#RTS2-AOS, OR EQUAL, REMOTE TEST AGAINST THE CONTRACT DOCUMENTS,AND FAMILIARIZE HIMSELF WITH THE WORK <br /> STATION/ MULTI-SIGNALING ACCESSORY. INSTALL MULTI-SIGNALING ACCESSORY IN O SEE LIGHTING PLAN FOR CONTINUATION OF EXHAUST FAN CONNECTION. PRIOR TO BIDDING AND START OF THE WORK. BY SIGNING THE CONTRACT,THE <br /> CONTRACTOR ACKNOWLEDGES THE SITE VISIT HAS BEEN COMPLETED AND THE <br /> A CONTINUOUSLY ATTENDED LOCATION,TO BE COORDINATED WITH THE AUTHORITY <br /> 10 TRANSFORMER AND DISCONNECT SWITCH SHALL BE LOCATED IN THE BASEMENT EXISTING CONDITIONS ARE ACCEPTED. <br /> HAVING JURISDICTION AND OWNER PRIOR TO ROUGH-IN. DUCT SMOKE DETECTORS LEVEL. COORDINATE WITH PROJECT MANAGER FOR FINAL LOCATION. <br /> ASSOCIATED WITH HVAC UNITS THAT SHARE A COMMON AIR PLENUM SHALL BE C. THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING EQUIPMENT, <br /> INTERLOCKED WITH ONE ANOTHER SUCH THAT ACTIVATION OF ANY ONE OF THE DEVICES, LUMINAIRES, CONDUITS, SUPPORTS, HANGERS, ETC.THAT ARE NOT ©2017 STARBUCKS COFFEE COMPANY <br /> ASSOCIATED DUCT SMOKE DETECTORS WILL SHUT DOWN SUPPLY FANS OF ALL SHOWN AND ARE REQUIRED TO BE REMOVED IN ORDER TO COMPLETE THE NEW <br /> HVAC UNITS SHARING THE COMMON AIR PLENUM. ALL FINAL WIRING SHALL BE BY WORK. <br /> THE ELECTRICAL CONTRACTOR. D. ELECTRICAL CIRCUITS THAT ARE TO BE REMOVED SHALL BE REMOVED IN THEIR STARBUCKS COFFEE <br /> ENTIRETY. CONDUCTORS SHALL BE REMOVED FROM THE ITEM TO BE DEMOLISHED COMPANY <br /> OPROVIDE FINAL CONNECTION TO SIGNAGE. COORDINATE LOCATION AND ALL TO THE SOURCE OVERCURRENT DEVICE. RACEWAYS WHICH ARE INSTALLED IN OR <br /> REQUIREMENTS WITH SIGN CONTRACTOR PRIOR TO ROUGH-IN. PROVIDE AN BELOW FLOORS OR WITHIN WALLS MAY BE ABANDONED, BUT ALL OVERHEAD OR 2401 UTAH AVENUE SOUTH <br /> APPROPRIATE LOCAL DISCONNECTING MEANS MOUNTED IN AN ACCESSIBLE, EXPOSED RACEWAYS SHALL BE REMOVED. EXPOSED RACEWAYS TO BE ABANDONED SEATTLE,WASHINGTON 98134 <br /> INCONSPICUOUS LOCATION THAT IS WITHIN SIGHT OF THE SIGN. EACH SIGN SHALL BE REMOVED AND SHALL BE CUT OR CHISELED AT LEAST 2" INTO THE WALL 318-1575 <br /> CIRCUIT SHALL HAVE A SEPARATE NEUTRAL AND SEPARATE EQUIPMENT GROUNDING OR FLOOR AND THE OPENING GROUTED SMOOTH. (206) <br /> CONDUCTOR. E. MAINTAIN CONTINUITY OF EXISTING CIRCUITS AS REQUIRED TO PROVIDE POWER <br /> THESE DRAWINGS AND SPECIFICATIONS ARE <br /> OPROVIDE FINAL CONNECTION TO AIR CURTAIN AND INTERLOCK WITH ASSOCIATED TO REMAINING EQUIPMENT, DEVICES,AND LUMINAIRES THAT ARE NOT BEING CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> 3 DOOR AND DEVICES.VERIFY SPECIFICATION WITH STARBUCKS PROJECT MANAGER REMOVED. PROPERTY OF STARBUCKS CORPORATION, <br /> PRIOR TO ROUGH-IN.THE CONTRACTOR SHALL NOT EXCEED THE MOCP AND PROVIDE F. ANY EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN OPERATION THROUGHOUT WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> THE PROPER DISCONNECTING MEANS. CONSTRUCTION.AUTOMATIC SMOKE DETECTORS IN THE AREA OF CONSTRUCTION THIS WORK. THEY SHALL NOT BE <br /> OPROVIDE POWER AND DATA DEVICES FOR FUTURE DIGITAL MENU BOARDS. SHALL BE DISCONNECTED AND TEMPORARILT REPLACED WITH HEAT DETECTORS WHEN REPRODUCED(IN WHOLE OR IN PART), SHARED <br /> COORDINATE EXACT LOCATION WITH STARBUCKS PROJECT MANAGER PRIOR TO THE SPACE IS STAFFED BY THE CONTRACTOR IN ACCORDANCE WITH THE APPROVED WITH THIRD PARTIES OR USED IN ANY MANNER <br /> FIRE SAFETY PROCEDURES OF THE OWNER AND THE LOCAL FIRE MARSHALL, BUT ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> ROUGH-IN. SHALL BE REACTIVATED WHENEVER THE SPACE IS NOT OCCUPIED BY THE PROJECT WITHOUT THE PRIOR WRITTEN <br /> OPLUGMOLD MOUNTED AT COMMUNITY TABLE.VERIFY EXACT HEIGHT AND MOUNTING CONTRACTOR.AUTOMATIC SMOKE DETECTORS SHALL BE PROTECTED FROM DUST AND CONSENT OF STARBUCKS CORPORATION. <br /> LOCATION WITH OWNER PRIOR TO ROUGH-IN. DIRT ACCUMULATION BY REMOVING THE DEVICE FROM ITS BASE DURING THOSE THESE DRAWINGS AND SPECIFICATIONS ARE <br /> TIMES WHEN THE SYSTEM IS ALLOWED TO BE OUT OF OPERATION. <br /> OSTUB-UP LOCATION TO COMMUNITY TABLE. SEE 1-1104 FOR ADDITIONAL INFORMATION. INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> G. WHERE THE MECHANICAL DESIGN UTILIZES A PLENUM RETURN AIR CEILING PROTOTYPICAL STARBUCKS STORE(WHICH IS <br /> DESIGN,ALL EQUIPMENT AND MATERIALS INSTALLED WITHIN THE PLENUM RETURN SUBJECT TO CHANGE AT ANYTIME)AND DO <br /> CEILING MUST MEET THE FLAME SPREAD AND SMOKE DEVELOPED RATINGS OF 25/50 NOT REFLECT ACTUAL SITE CONDITIONS. <br /> AND BE APPROVED FOR USE IN PLENUM RETURN CEILINGS. COORDINATE PLENUM NEITHER PARTY SHALL HAVE ANY OBLIGATION <br /> CEILING LOCATIONS WITH THE MECHANICAL CONTRACTOR. LUMINAIRES THAT ARE NOR LIABILITY TO THE OTHER(EXCEPT STATED <br /> MANUFACTURED WITH A METAL HOUSING MEET THIS REQUIREMENT AND ARE NOT ABOVE UNTIL A WRITTEN AGREEMENT IS <br /> REQUIRED TO BE PLENUM RATED UNLESS INDICATED OTHERWISE. ) <br /> COORDINATE ALL DEVICE LOCATIONS AND CIRCUIT ROUTING WITHIN ANY MILLWORK FULLY EXECUTED BY BOTH PARTIES. <br /> WITH MILLWORK VENDOR PRIOR TO ROUGH-IN. <br /> H. COORDINATE ALL DEVICE LOCATIONS AND CIRCUIT ROUTING WITH ANY MILLWORK ARCHITECT OF RECORD <br /> WITH MILLWORK VENDOR PRIOR TO ROUGH-IN. C11Cg afChlteCtUf6 <br /> I. COORDINATE THE CONNECTIONS OF ALL EQUIPMENT PROVIDED BY OTHERS WITH THE y <br /> CONTRACTOR PROVIDING THE EQUIPMENT PRIOR TO ROUGH-IN. THIS INCLUDES, <br /> AC-2 BUT IS NOT LIMITED TO, MECHANICAL EQUIPMENT, KITCHEN EQUIPMENT, L <br /> ° AUDIOVISUAL EQUIPMENT, FIRE SUPPRESSION SYSTEM EQUIPMENT, FIRE ALARM <br /> 3 EQUIPMENT, ETC. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE TO PROVIDE U, <br /> - - THE APPROPRIATE DISCONNECTING MEANS FOR AND TO MAKE THE FINAL <br /> GFCI ___ ____ 10 D EQUIPMENT. THE ELECTRICAL CONTRACTOR IS 111 Pacifica, 18 <br /> _______ TO,ANY RE <br /> 'fica,Suite 280,Irvine,CA 926 <br /> 17"` 8-37 ALSO RESPONSIBLE PROVIDE AN APPROPRIATE CORD AND PLUG FOR ANY P:949.553.1117 F:949.474.7056 <br /> I I 400/3 CORD-AND-PLUG CONNECTED EQUIPMENT THAT IS NOT EQUIPPED WITH AN INTEGRAL <br /> 400A CORD AND PLUG. <br /> FUSES ENGINEER STAMP <br /> J. ITS THAT ARE TO BE ROUTED <br /> SEE PANEL SCHEDULES FOR INFORMATION ON CIRCUITS o Q�Of ESS/ON <br /> = THROUGH CONTACTORS OR RELAYS FOR CONTROL <br /> Rly <br /> 2 __ ���� ,10 �y SCtiti Fy <br /> 28 TRANSFORMER Tl K. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PRESERVING THE FIRE RATING <br /> _______ ______ ___ ____. OF ANY FIRE-RATED CEILING ASSEMBLIES BY PROVIDING THE APPROPRIATE _ � m Z <br /> 2 J ESTOP c� <br /> n <br /> 21 -110 1 - No. E14631 <br /> �� FIRE RATED LUMINAIRE TENTS AS MANUFACTURED BY TENANT OR NELSON FIR � r r^ <br /> 1719 2 <br /> W <br /> E 10970 _________________________________________________ _________________________________________________________________________________________________________________________________________ ________ _ ____________ .__ _______________. ______________________________ <br /> OR BY BUILDING FIRE-RATED ENCLOSURES AROUND EACH LUMINAIRE THAT IS <br /> 17 RECESSED INTO THE FIRE-RATED ASSEMBLY. COORDINATE FIRE-RATED CEILING <br /> 2 GFCI TR I�P� <br /> J <br /> PANEL 'A' L. ALL EQUIPMENT, DEVICES,AND LUMINAIRES SHALL BE SUITABLE FOR THE 9TF <br /> 26 — — ENVIRONMENT IN WHICH THEY ARE INSTALLED. EQUIPMENT MOUNTED OUTDOORS OF CA%- <br /> x <br /> SHALL BE NEMA 3R DEVICES MOUNTED IN DAMP OR WET LOCATIONS SHALL BE <br /> . , <br /> E 11083 E 19729 E 15186 B-25 PANEL B WEATHERPROOF. RECEPTACLES RATED 15-OR 20-AMPS AND 120 VOLTS WHICH ARE Date. 03/24/2020 <br /> B-26,28 +84„ P-1 WITH A SUITABLE WEATHERPROOF OCOVE PLATE(WHILE-IN-USERTN WETD EQUIPPED <br /> LOCATED IN DAMP OR WET U <br /> HWH-1 <br /> 60/2 LOCATION <br /> 9 <br /> F <br /> N M. GS,TERMINALS, ETC. IN ELECTRICAL DISTRIBUTION EQUIPMENT SHALL BE <br /> J <br /> 9 <br /> J –91 �p LISTED FORA MINIMUM OF 75 DEGREE C CONDUCTORS. TERMINATIONS LISTED <br /> 21 E 13682 +72 B13,15, F ON 60 DEGREE CONDUCTORS NO TED <br /> __ E 101970 � (#8,#12,#12) J "F I„8 <br /> OR ONLY C C CT S ARE T PERMIT <br /> 1 / ;, � B-2 8 10 <br /> 3 <br /> _-- _-- _- N. BRANCH CIRCUITS RATED AT 20 AMPS AT 120 VOLTS THAT ARE LONGER THAN 75 <br /> 1 / _ <br /> E 1362 ' / FEET SHALL BE#10 AWG MINIMUM TO OFFSET VOLTAGE DROP. <br /> RTU-1 F RTU-3 <br /> D 13 ` RTU-2 <br /> O. LONGER THAN 150 <br /> FEET SHALL BE#8 AWG MINIMUM TO OFFSET VOLTAGE DROP. <br /> BRANCH CIRCUITS RATED AT 20 AMPS AT 120 VOLTS THAT ARE <br /> ------------------------------------------------------ <br /> 1 <br /> P 10874 +93n TYP ` I 1 I D ----- -------- ------------ P. BRANCH CIRCUITS RATED AT 20 AMPS AT 277 VOLTAS THAT ARE LONGER THAN 150 N <br /> W <br /> 4 <br /> B-2 <br /> �26"l15 ��������� ����������� FEES SHALL BE#10 AWG MINIMUM TO OFFSET VOLTAGE DROP.Q CONDUCTORS#10 AWG AND w <br /> = �� � � � . CONDUCTORS#12 AWG AND SMALLER SHALL BE SOLID. COND > <br /> 2°' +99" <br /> B-22 <br /> / LARGER ARE PERMITED TO BE STRANDED Q Q <br /> B-3�, / / +9 1 6 GFCI„ ., <br /> J <br /> 10 W/RE / L_ J � / � � � / � +44 w — <br /> �# 5 <br /> w 06 � [ Z <br /> 7 <br /> A 1 <br /> L — — J L_ — J _____ _________ _________ _________ _________ _________ _________ _________ <br /> / �#10 WIRE / 8 <br /> / � a Z — <br /> / 7 Q <br /> 8-14,16,18 <br /> 8 / 14 14 14 U — U <br /> _ / A—50 W W <br /> U � o <br /> / o <br /> � —7 A-2, O O r <br /> #8 WIRE) �#8 WIRE) . /-� <br /> ............... ... ... / C/)1 <br /> STORE #: 5470 <br /> -110 <br /> AC—1 B-35 # 052 <br /> / <br /> PROJECT 03030 <br /> I CONCEPT: <br /> CASEWORK C CORE <br /> 3 10 20 <br /> ISSUE DATE: CHECKSET 2- - <br /> R <br /> PROGRAM M. DBREBIKA <br /> / <br /> / <br /> DESIGNER: BREBIKA <br /> STORE DES M D <br /> 14LEED(DAP: N/A <br /> 2 / <br /> CHECKED BY: A. FELDMAN <br /> MCG <br /> _ MCG PROJEMANAGER: C. LEE <br /> 14 MCG PROJ SPECIALIST: SPARK <br /> 14 <br /> 16 <br /> --- Revision Schedule <br /> SR _____ _ _ � �� By Description <br /> Rev Date Des n <br /> SR - <br /> AC-3 <br /> � POWER AND <br /> 2 B-24 SYSTEMS PLAN <br /> ---- Schnackel SCALE:AS SHOWN <br /> WER AND SYSTEMS PLAN � ® <br /> Newyork a Omaha a�Mge1�a She a Hono1� SHEET N U M B ER: <br /> af-s"lie: 1/4"= 1'-0" N 80x581-0963 wwwJwhm dwL00m <br /> 80 South Lake Avenue, Suite 640 Pasadena, CA 91101 E-1 1 01 <br /> SE JOBQ: 181103 <br />