MECHANICAL EQUIPMENT SCHEDULE
<br /> HVAC EQUIPMENT AND MATERIALS DUCTWORK AND ACCESSORIES CONTROLS AND OPERATION
<br /> ..
<br /> Filters Sheetmetal Ductwork Control Wiring
<br /> DIFFUSERS, GRILLES AND REGISTERS Provide three(3)sets of pleated disposable filters. Use one set until completion of construction. All ductwork to be rigid sheetmetal constructed from galvanized sheet steel in accordance with SMACNA low The Mechanical Contractor shall provide all control wiring in conduit necessary for the
<br /> Install one set at completion of construction and deliver one set of filters to Starbucks labeled to velocity duct construction standards. Fiberglass ductboard is not allowed. All exposed ductwork to be round, complete and proper operating temperature control system. .0
<br /> denote their respective air handling unit. Filters to be Fan-or similar. spiral,or rectangular lock-seam type,as shown on HVAC Plan sheet M-1102. Assemble and install ductwork in
<br /> MARK SERVICE LOCATION CLG. TYPE MANUFAC. CATALOG NUMBER REMARKS Exhaust Fans accordance with recognized industry practice for achieving air tight(5%leakage)and noiseless(no objectionable EMS Thermostat
<br /> Greennoise)systems,capable of performing each indicated service. Furnish all required dampers,transitions, Thermostat(s)shall be Venstar with non-switching subbase and remote sensor(s)furnished
<br /> Contractoreck
<br /> direct drive rooftop model#G-97-D, provided per lease agreement. The Mechanical connections to air terminals,and other accessories necessary for complete operating system. No variation of duct by Starbucks, unless otherwise noted,for installation by the Mechanical Contractor. One
<br /> Contractor is responsible for coordinating discharge location with new and existing vents and thermostat and sensor is provided for each air handling unit. Mount thermostats at 48"
<br /> D-1 SUPPLY CEILING AC TILE TITUS TDC XX 18x18 24x24 3 26 4 SEE PLAN FOR NECK SIZE intakes, providing complete installation including curbs, backdraft,damper,and ductwork from configuration or sizes will be permitted except by permission from the Engineer. P 9 thermostat(s)
<br /> restroom grille to unit and necessary accessories,and providing warranty. Exhaust fanabove finished floor in location as indicated on drawings. Mechanical Contractor to provides)to be ��
<br /> Duct Sealant thermostat identification labels with 1/8 high white letters on kelly green or black phenolic
<br /> „ operated in conjunction with air handling unit(s). Route fan wiring via fan control relay to be �� �� �� ��
<br /> D-2 SUPPLY CEILING GYP. BRD. TITUS FL 20 1 22 JT / FBPI 20 1 10 SEE PLAN FOR SIZE interlocked with EMS. Provide control relayand 24V AC control ower supply with overload Seal all longitudinal and transverse joints with a non-hardening, non-migrating mastic or liquid elastic sealant of a background,i.e. AC-1:Workroom and AC-2:Customer Area". Refer to thermostat setup
<br /> p pp y g � g' g g q
<br /> protection. Install power supply and fan control relay adjacent to one another in accessible ceiling type recommended by the manufacturer for sealing joints and seams in sheet metal ductwork. Cover all field joints, instructions below for additional requirements.
<br /> D-3 SUPPLY CEILING GYP. BRD. TITUS TDC X 6x6 12x12 3 26 4 D-75 Ill SEE PLAN FOR NECK SIZE space and extend low voltage wiring between auxiliary relay and fan control relay. Provide joints around spin-in fittings,and fastening screws with mastic. Thermostat Setup Instructions ©2017 STARBUCKS COFFEE COMPANY
<br /> additional wiring to vav damper as required. Coordinate all requirements with Mechanical Provide the following setup and programming on the Venstar thermostat:
<br /> D-4 SUPPLY WALL - TITUS FL 20 1 77 JT / FBPI 20 1 10" SEE PLAN FOR SIZE Contractor. Supports 1. Follow instructions in the Manual which comes with the thermostat.
<br /> Air Curtains
<br /> Provide hot-dipped galvanized steel,fasteners,anchors, rods,straps,trim,and angles for support of ductwork. 2. Set DIP switches and jumpers as follows: STARBUCKS COFFEE
<br /> D-5 SUPPLY WALL - TITUS FL 20 1 77 JT / FBPI 20 1 12„ a. Degrees"F"display
<br /> SEE PLAN FOR SIZE Air curtains,when required,shall be furnished and installed by the General Contractor. Coordinate b. 12 Hour Clock
<br /> / COMPANY
<br /> with Electrical Contractor for location of power connection. Dampers
<br /> D-6 SUPPLY CEILING GYP. BRD. TITUS FL 20 1 22 JT FBPI 20 1 8" SEE PLAN FOR SIZE Provide opposed-blade,multi-leaf volume control dampers where indicated on drawings and at points on low c. Continuous Fan Operation in Occupied Mode
<br /> pressure supply, return,and exhaust ducts where branches are taken from larger ducts. Provide UL listed and d. Disable Keyboard Programming 2401 UTAH AVENUE SOUTH
<br /> fire/smoke dampers where required and in accordance with NFPA and local codes. Provide conveniently located e. Cut jumper if unit is a Heat Pump SEATTLE,WASHINGTON 98134
<br /> G-1 RETURN CEILING GYP. BRD. TITUS FL 20 1 22 JT / FBP 20 1 10" SEE PLAN FOR SIZE access doors of ample size and quantity for servicing the dampers. 3. Set clock and day. (206)318-1575
<br /> 4. Set to display current temperature
<br /> G-2 EXHAUST CEILING GYP. BRD. TITUS 350 R L X X 3 26 AG-15 [1] SEE PLAN FOR SIZE Grilles, Registers,and Diffusers 5. Set Occupied Start Time at 30min before opening. Set Unoccupied start time at 30min
<br /> Grilles, registers,and diffusers shall be manufactured by Titus and shall be General Contractor supplied,unless after closing. Verify hours with Store Manager or Construction manager. THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> G-3 RETURN CEILING AC TILE TITUS 350 R L X X 3 26 SEE PLAN FOR SIZE otherwise noted. Diffusers shall be installed as indicated on the drawings and schedules.The Mechanical 6. Set Points shall be as follows: CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> Contractor shall provide all miscellaneous items necessary for a complete and proper installation in the type of a. Occupied PROPERTY OF STARBUCKS CORPORATION,
<br /> G-4 RETURN CEILING GYP. BRD. TITUS FL 20 1 22 JT / FBP 20 1 8" SEE PLAN FOR SIZE ceiling and walls used in this project. i. Heating: 70deg F WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> ii. Cooling:72deg F THIS WORK. THEY SHALL NOT BE
<br /> , SHARED
<br /> IN WHOLE OR IN PART
<br /> TITUS IS THE BASE OF DESIGN. KRUEGER, PRICE, CARNES ARE EQUAL. NO EXCEPTIONS i. Heating:60de F Thermal Insulation b. Unoccupied REPRODUCED ( )
<br /> 1. PROVIDE TRM FRAME. Provide external thermal insulation with an integral vapor barrier facing of sufficient thickness to meet local energy g� g WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> code requirements. Provide insulation on exhaust and outside air ducts,and on concealed portions of supply and ii. Cooling:78deg F ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> return air ducts. Do not insulate exposed ductwork and portions of ductwork that are internally lined. Thermal 7. Set three(3)hour occupied override function to provide the following set point overrides:
<br /> insulation to comply with an NFPA flame spread of 25 or less,and smoke developed no greater then 50. a. Heating: +2deg F PROJECT WITHOUT THE PRIOR WRITTEN
<br /> ROOF TOP UNITS I b. Cooling: -2deg F CONSENT OF STARBUCKS CORPORATION.
<br /> Acoustical Duct Liner THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> CLG. CAP. (MBH) HTG CAP. (MBH) ELECTRICAL Unless otherwise indicated on the plans, provide 1"glass fiber acoustical duct liner on supply and return ductwork INTENDED TO EXPRESS DESIGN INTENT FOR A
<br /> MARK COMP. CFM EXT. FAN WEIGHT SEER/ REF. CARRIER within 10 feet of the discharge and intake of air handling units. Increate duct sized indicated on plans 2"in each PROTOTYPICAL STARBUCKS STORE(WHICH IS
<br /> SENS. TOTAL NOM. KW INPUT OUTPUT S.P. BHP VOLTS PH MCA MOCP (LBS) EER TYPE MODEL NUMBER dimension to accommodate liner. Liner shall be fastened to duct with mechanical liner fasteners in accordance with SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> TONSI I I SMACNA. NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> RTU-1 51.6 57.2 5 4.25 115 93 2,000 0.6 1.5 208 3 30 45 887 15.2/- R41 OA 48HCEB06 1-7 NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> / [ ] Flexible ductwork
<br /> Flexible ductwork shall only be installed above AC tNOR LIABILITY TO THE OTHER(EXCEPT STATEDhe ceiling and not above hard lid ceilings. Flexible ductwork ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br /> RTU-2 59.6 70.6 6 5.12 125 103 2,400 0.6 1.5 208 3 31 45 1,052 -/12 R410A 48HCEE07 [1-9] shall not exceed 5'-0"(152CM)in length and two 45°elbows. It shall be pulled taut and appropriately fastened to FULLY EXECUTED BY BOTH PARTIES.
<br /> rigid branch duct&diffuser. Bends shall be minimized and where needed be a full radious bend. Support bands
<br /> RTU-3 59.6 70.6 6 5.12 125 103 2,400 0.6 1.5 208 3 31 45 1,052 -/12 R410A 48HCEE07 [1-9] shall be installed so as to not crimp flex duct. Flexible ductwork shall meet specification requirements.
<br /> CARRIER IS THE BASIS OF DESIGN. HIGH EFFICIENCY AAON, LENNOX, TRANE OR YORK ARE EQUAL. ARCHITECT OF RECORD
<br /> COOLING CAPACITIES ARE BASED ON EXPECTED SITE CONDITIONS: 817 DB/ 657 WB INDOOR ENTERING AIR mcg architecture
<br /> TEMPERATURE, 100°F DB AIR ENTERING OUTDOOR FAN. SCHEDULED UNIT MAY DIFFER FROM AHRI STANDARD CFM. o •o L
<br /> REMARKS:
<br /> y CO > C
<br /> Co
<br /> 1. PROVIDE EQUIPMENT WITH SCCR GREATER THAN THE AVAILABLE FAULT CURRENT AT THE EQUIPMENT OR UPSTREAM PANELBOARD.
<br /> REFER TO THE ELECTRICAL ONE LINE DIAGRAM AND PANEL SCHEDULES FOR AVAILABLE FAULT CURRENT AT UPSTREAM PANELBOARD. SPECIFICATION NOTES LEED ABBREVIATIONS
<br /> co
<br /> 2. PROVIDE WITH FACTORY INSTALLED DISCONNECT, UNPOWERED CONVENIENCE OUTLET, THROUGH THE BASE ELECTRICAL CONNECTION. Cn
<br /> 3. PROVIDE WITH 14 INCH HEIGHT ROOF CURB. SCOPE CONTRACTOR RESPONSIBILITIES FOR BUILDING COMMISSIONING # I
<br /> 2618
<br /> 4. PROVIDE WITH DRY BULB ECONOMIZER AND BAROMETRIC RELIEF DAMPER. THE INTENT OF THE SPECIFICATIONS AND THE DRAWINGS IS TO PROVIDE A COMPLETE 111 Pacifica,Suite 280, Irvine,CA .
<br /> CONTRACTOR SHALL PROVIDE SUPPORT AND WORK AS SPECIFIED, NEEDED AND REQUIRED TO 3PL THIRD PARTY LOGISTICS ID INSIDE DIAMETER P: 949.553.1117 F:949.4747056
<br /> .7056
<br /> 5. ECONOMIZER SHALL INCLUDE FAULT DETECTION DIAGNOSTICS (FDD). DAMPER LEAKAGE SHALL MEET APPLICABLE ENERGY CODE. AND FULLY OPERATIONAL MECHANICAL SYSTEM.THE MECHANICAL CONTRACTOR SHALL A L
<br /> 6. PROVIDE FACTORY INSTALLED SUPPLY DUCT SMOKE DETECTOR. FURNISH ALL LABOR, MATERIAL,AND EQUIPMENT NECESSARY TO COMPLETE THE CONDUCT AND FACILITATE STARBUCKS STAFF BUILDING COMMISSIONING EFFORTS.THIS WORK
<br /> WILL BE COMPRISED OF THREE DISTINCT EFFORTS: 1)SUPPORT STARBUCKS COMMISSIONING A/C AIR CONDITIONING LL LANDLORD
<br /> 7. ECONOMIZER SHALL MEET ALL TITLE 24 REQUIREMENTS. MECHANICAL WORK. ENGINEER STAMP FEss
<br /> AGENT(CXA)DURING INSTALLATION VERIFICATION AND CORRECT DISCLOSED DEFICIENCIES;2} ACT ACOUSTICAL CEILING M Q,e oN
<br /> 8. UNITS WITH COOLING CAPACITY GREATER THAN OR EQUAL TO 65 MBH SHALL HAVE MULTI-STAGE CAPABILITY 4�
<br /> PER APPLICABLE ENERGY CODE. SITE EXAMINATION PERFORM TESTING,ADJUSTING, BALANCING AND SYSTEM STARTUP AND SUPPORT FUNCTIONAL o ROY S
<br /> TILE MAX MAXIMUM �I' '� Cy
<br /> PERFORMANCE TESTING BY STARBUCKS CXA; 3)CORRECT DEFICIENCIES DISCLOSED BY 4z_ o� 'Y F
<br /> THE MECHANICAL CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHERE
<br /> 9. PROVIDE WITH 2-SPEED EVAPORATOR FAN. FUNCTIONAL PERFORMANCE TESTING AND SUBMIT REPORTS. CONTRACTOR SHALL PERFORM ADJ ADJUSTABLE MEP "MECHANICAL,
<br /> EQUIPMENT, DUCTWORK,AND PIPING WILL BE INSTALLED AND WILL REPORT ANY
<br /> IN HIS OPINION, PREVENTS THE PROPER INSTALLATION OF THE AND PROVIDE THE FOLLOWING: AFF ABOVE FINISHED FLOOR ELECTRICAL,AND _ Z
<br /> CONDITION THAT, AFF ABOVE FINISHED FLOOR PLUMBING" w No. M33299 m
<br /> EXHAUST FANS MECHANICAL WORK. A.SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE, BUT ARE NOT LIMITED TO, DOMESTIC AMP AMPERE MFR MANUFACTURER
<br /> STANDARDS HOT WATER GENERATION, HVAC SYSTEMS, ROOFTOP UNITS, EXHAUST FANS, HVAC CONTROLS, ARCH ARCHITECT MIN MINIMUM
<br /> EXT. S.P. MOTOR DATA EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE PROVISIONS OF LIGHTING CONTROLS,AIR CURTAINS, BUILT-IN REFRIGERATION EQUIPMENT,AND RENEWABLE N T FCHAN�OP� �P
<br /> MARK LOCATION SERVICE CFM IN W.G.) SONES RPM MFR. REMARKS CSA, ASME ASTM UL NEMA ANSI SMACNA ASHRAE NFPA AS APPLICABLE TO ENERGY SYSTEMS. B 9TF 0```�
<br /> ( ) HP VOLTS PH CYC. ULC ARL, BOH BACK OF HOUSE NIC NOT IN CONTRACT of CA`�F
<br /> EACH INDIVIDUAL UNIT OR ASSEMBLY. B.CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN PROJECT SCHEDULE AND SHOW C NL NIGHT LIGHT
<br /> EF-1 ROOF RESTROOMS 200 0.5 4.7 1/6 115 1 60 1140 GREENHECK G-097-B [1-4] CODES INTERVALS FOR PERFORMANCE OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE AND CAB CABINET NTS NOT TO SCALE Date. 03/24/2020
<br /> 1. GREENHECK IS THE BASE OF DESIGN. COOK, PENN, AND CAPTIVEAIRE ARE EQUAL. NO EXCEPTIONS. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL APPLICABLE CL CENTER LINE INTERVALS FOR WORK PERFORMED BY STARBUCKS CXA.CONTRACTOR SHALL SHOW 0
<br /> RESOURCES FOR PERFORMING ALL WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE
<br /> 2. PROVIDE SOLID STATE SPEED CONTROL. PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE OF CONFLICT BETWEEN THE ITEM IN THE SCHEDULE OF VALUES. CLG CEILING OC ON CENTER
<br /> 3. PROVIDE MOTORIZED BACKDRAFT DAMPER. DRAWINGS AND SPECIFICATIONS AND THE CODES AND ORDINANCES,THE HIGHEST CM CONSTRUCTION OD OUTSIDE DIAMETER
<br /> STANDARD SHALL APPLY.THE MECHANICAL CONTRACTOR SHALL SATISFY CODE
<br /> 4. PROVIDE MINIMUM 12" HEIGHT ROOF CURB. REQUIREMENTS AS A MINIMUM STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS. C.CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S MANAGER OF/CI OWNER
<br /> REQUIREMENTS AND ALL CONTRACT DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED CTR CENTER FURNISHED/CONTRACTO
<br /> AIR CURTAINS PERMITS AND FEES TOTALLY COMPLETE,AND ACCESSIBLE TO STARBUCKS CXA FOR INSTALLATION VERIFICATION AND CX COMMISSIONING R INSTALLED
<br /> THE MECHANICAL CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS, FEES,AND FUNCTIONAL PERFORMANCE TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION CXA COMMISSIONING AGENT OF/01 OWNER
<br /> MOTOR ELECTRICAL INSPECTIONS NECESSARY TO COMPLETE THE MECHANICAL WORK. VERIFICATION. FURNISHED/OWNER
<br /> MARK LENGTH CFM HTG. MBH KW TEMP. MARS D INSTALLED
<br /> QUAN. H.P. MEDIA RISE VOLTS PH MCA MOCP MODEL NUMBER WARRANTY D. INSTALLATION VERIFICATION SHALL BE PERFORMED BY STARBUCKS'CXA.CONTRACTOR SHALL DEG DEGREE P �
<br /> THE MECHANICAL CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK TO BE SUPPORT STARBUCKS CXA INSTALLATION VERIFICATION EFFORTS AS NECESSARY. PROVIDE ALL DET DETAIL PD PRODUCTION DESIGNER �
<br /> ACCESS AND EQUIPMENT NECESSARY FOR STARBUCKS STAFF TO VERIFY THAT THE EQUIPMENT W
<br /> AC-1 36 1397 1 1/2 NA NA NA NA 115 1 6 15 STD2 36 1 U A OB FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FORA PERIOD OF ONE(1)YEAR IS INSTALLED CORRECTLY. DIA DIAMETER PLC PLACE N
<br /> FROM THE DATE OF FINAL ACCEPTANCE BY STARBUCKS AND WILL REPAIR OR REPLACE DIM DIMENSION PM PROJECT MANAGER J W L0
<br /> AC-2 36 1397 1 1/2 NA NA NA NA 115 1 6 15 STD2 36 1 U A OB ANY DEFECTIVE WORK PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER E.CONTRACTOR SHALL BE READILY AVAILABLE DURING INSTALLATION VERIFICATION TO DM DESIGN MANAGER (3)
<br /> EXISTING WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS AND CORRECT ANY DEFICIENCIES OR DEFECTS DISCLOSED BY THE INSTALLATION VERIFICATION DN DOWN R / Q
<br /> AC-3 72 2758 2 1/2 NA NA NA NA 115 1 12.7 20 STD2 72 2 U A OB WORKMANSHIP. PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION OF THE E R RADIUS Q r ,
<br /> CONSTRUCTION SCHEDULE. RCM RENOVATIONS U) U V
<br /> LEED EA EACH CONSTRUCTION . . W
<br /> NOTE: PROVIDE WITH MICRO DOOR SWITCH. ALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEED REQUIREMENTS&CODE. IN F.ALL HVAC, EXHAUST FAN,AND AIR CURTAIN EQUIPMENT SHALL BE TESTED,ADJUSTED AND EL ELEVATION MANAGER 6i 06 0� I z
<br /> CASE OF CONFLICT,THE HIGHER STANDARD SHALL APPLY. BALANCED BY THE CONTRACTOR'S TESTING,ADJUSTING AND BALANCE AGENT(SEE TESTING, EQ EQUAL REF REFERENCE Q r , 0 (JQ
<br /> ADJUSTING AND BALANCING)AFTER THE SYSTEM IS VERIFIED TO BE COMPLETE AND CORRECT BY EXIST EXISTING REQ{`D) REQUIRE(D) Z _ Q
<br /> STARBUCKS CXA, IN ACCORDANCE WITH THE REQUIREMENTS OF THESE DOCUMENTS.ALL HVAC EXT EXTERIOR REV REVISION F- LL F_
<br /> CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES,COMPONENTS, () ()
<br /> GENERAL 2016 CALIFORNIA GREEN EQUIPMENT AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH F RND ROUND W ( , W U
<br /> THESE PLANS AND SPECIFICATIONS.SEQUENCES OF OPERATION SHALL BE TESTED TO ENSURE FF&E FURNITURE, FIXTURE, S 3v O O
<br /> GENERAL MECHANICAL NOTES THAT THEY OPERATE IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS. DELIVERABLES: AND EQUIPMENT" SB STARBUCKS 0 Q 0 CO
<br /> �
<br /> BUILDING STANDARDS CODE NOTES: PRELIMINARY,WRITTEN TESTING AND AIR BALANCE REPORT CONFORMING TO THE FIO FURNISHED AND 5- 11
<br /> REQUIREMENTS SPECIFIED HEREIN, DOCUMENTING THE INFORMATION SPECIFIED, ETC.TO THE SC SOLID CORE r CI)
<br /> Scope INSTALLED BY OWNER SF SQUARE FEET
<br /> A. TESTING AND ADJUSTING OF SYSTEMS SHALL BE REQUIRED PER SECTION 5.410.4 FOR BUILDINGS WITH FLOOR AREA LESS THAN The intent of the Specifications and the Drawings is to provide a complete and fully operational STARBUCKS CXA IMMEDIATELY UPON COMPLETION OF THE WORK. FLR FLOOR
<br /> 10,000 SQUARE FEET. mechanical system. The Mechanical Contractor shall furnish all labor,material,and equipment SHIT SHEET STORE #: 5470
<br /> necessary to complete the mechanical work. G.CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN EQUIPMENT IS READY FOR FUNCTIONAL FOH FRONT OF HOUSE SIM SIMILAR
<br /> B. DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING SYSTEMS. SYSTEMS TO BE INCLUDED FOR TESTING Site Examination PERFORMANCE TESTING.ALL EQUIPMENT SHALL BE READY FOR FUNCTIONAL PERFORMANCE FT FOOT/FEET SPEC SPECIFICATION PROJECT#: 03030-052
<br /> AND ADJUSTING SHALL INCLUDE,AS APPLICABLE TO THE PROJECT,THE SYSTEMS LISTED IN SECTION 5.410.4.2. The Mechanical Contractor shall thoroughly examine all areas where equipment,ductwork,and TESTING PRIOR TO STARTING TESTING.CONTRACTOR SHALL OPERATE EQUIPMENT FOR G SQ SQUARE CASEWORK CONCEPT: CORE
<br /> piping will be installed and will report any condition that, in his opinion, prevents the proper STARBUCKS CXA AND VERIFY BY DEMONSTRATION THE CORRECT OPERATION OF EQUIPMENT, GC GENERAL CONTRACTOR
<br /> C. PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE WITH INDUSTRY BEST PRACTICES AND APPLICABLE installation of the mechanical work. RESPONSE OF SENSORS,AND PROPER EXECUTION OF HVAC CONTROL AND LIGHTING T ISSUE DATE: CHECKSET 2-10-20
<br /> H
<br /> NATIONAL STANDARDS ON EACH SYSTEM. SEQUENCES; INCLUDING BUT NOT LIMITED TO,AIR MOVEMENT,TEMPERATURE,SOUND,AND TEMP TEMPORARY PROGRAM MANAGER: M. DBREBIKA
<br /> Standards CONTROL RESPONSE. PROVIDE ANY SECURITY ACCESS, HARDWARE,SOFTWARE,OR OTHER HC HOLLOW CORE TYP TYPICAL STORE DESIGNER: M. DBREBIKA
<br /> D. BEFORE A NEW SPACE-CONDITIONING SYSTEM SERVING A BUILDING OR SPACE IS OPERATED FOR NORMAL USE,THE SYSTEM Equipment and materials shall conform with the appropriate provisions of CSA, ULC,ARL,ASME, SUPPORT AS NEEDED FOR THE STARBUCKS CXA TO EFFICIENTLY WITNESS AND DOCUMENT ALL HDW HARDWARE
<br /> ASTM, UL, NEMA,ANSI, SMACNA,ASHRAE, NFPA,as applicable to each individual unit or EQUIPMENT TESTING.STARBUCKS CXA WILL RECORD THE EQUIPMENT OPERATION ANDHM HOLLOW METAL U LEED(D AP: N/A
<br /> SHOULD BE BALANCED IN ACCORDANCE WITH THE PROCEDURES DEFINED BY NATIONAL STANDARDS LISTED IN SECTION 5.410.4.3.1. assembly. RESPONSE TO TESTING SEQUENCES AND PREPARE A LIST OF ANY DEFICIENCIES DISCLOSED BY UON UNLESS OTHERWISE CHECKED BY: A. FELDMAN
<br /> HORIZ HORIZONTAL NOTED
<br /> E. AFTER COMPLETION OF TESTING,ADJUSTING,AND BALANCING, PROVIDE A FINAL REPORT OF TESTING SIGNED BY THE Codes THE FUNCTIONAL PERFORMANCE TESTS FOR CORRECTION BY THE CONTRACTOR. EQUIPMENT HR HOUR MCG PROJECT#: 18531
<br /> INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE SERVICES. All work shall be performed in strict accordance with all applicable provincial and local codes and INCLUDES, BUT IS NOT LIMITED TO,AIR HANDLING UNITS, ROOFTOP AND SPLIT TYPE,CONDENSING V
<br /> ordinances. In case of conflict between the drawings and specifications and the codes and UNITS, EXHAUST FANS, LIGHTING CONTROLS, ETC. DELIVERABLES: PROVIDE COMPLETED COPIES HT HEIGHT VD VENDOR DIRECT MCG PROJ. MANAGER: C. LEE
<br /> F. PROVIDE THE BUILDING OWNER WITH DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND COPIES OF ordinances,the highest standard shall apply. The Mechanical Contractor shall satisfy code OF ALL START UP REPORTS, FILLED OUT ON THE MANUFACTURERS'FORMS,TO THE STARBUCKS HVAC "HEATING,VENTILATING, VERT VERTICAL MCG PROJ. SPECIALIST: SPARK
<br /> CXA AND AIR CONDITIONING
<br /> GUARANTIESM/ARRANTIES FOR EACH SYSTEM PRIOR TO FINAL INSPECTION. requirements as a minimum standard without any extra cost to Starbucks. " VIF VERIFY IN FIELD
<br /> Permits and Fees H.CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES OR DEFICIENCIES DISCLOSED Revision Schedule
<br /> G. INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUIRED BY THE ENFORCING AGENCY. The Mechanical Contractor shall procure and pay for all permits,fees,and inspections necessary to
<br /> complete the mechanical work. DURING THE FUNCTIONAL PERFORMANCE TESTING PROCESS.CORRECTIONS SHOULD BE MADE IN
<br /> H. HVAC EQUIPMENT USED DURING CONSTRUCTION SHALL USE RETURN AIR FILTERS WITH A MERV 8, BASED UPON ASHRAE A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM AND CONSTRUCTION SCHEDULE. Rev Date By Description
<br /> 55.2-1999,OR AN AVERAGE EFFICIENCY OF 30%BASED UPON ASHRAE 52.1-1992. ALL FILTERS SHALL BE REPLACE PRIOR TO Warranty
<br /> The Mechanical Contractor shall unconditionally warrant all work to be free of defects in material I.CONTRACTOR SHALL BE READILY AVAILABLE FOR ANY RE-TESTING OF EQUIPMENT DEEMED
<br /> OCCUPANCY. and workmanship for a period of one(1)year from the date of final acceptance by Starbucks and
<br /> will repair or replace any defective work promptly and without charge and restore any other existing NECESSARY BY STARBUCKS CXA DURING INSTALLATION VERIFICATION AND FUNCTIONAL
<br /> I. AT THE TIME OF ROUGH INSTALLATION OR DURING STORAGE ON THE CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE work damaged in the course of repairing defective materials and workmanship. PERFORMANCE TESTING.CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES
<br /> HEATING AND COOLING EQUIPMENT,ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED DEFICIENCIES FOUND IN THE SYSTEM DURING ANY AND ALL RE-TESTING. CORRECTIONS SHOULD
<br /> WITH TAPE, PLASTIC,SHEETMETAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM AND CONSTRUCTION
<br /> SCHEDULE. DELIVERABLES: FINAL BALANCE REPORT, DEFICIENCIES LIST NOTING CORRECTIVE
<br /> DUST OR DEBRIS WHICH MAY COLLECT IN THE SYSTEM.
<br /> ACTIONS PERFORMED BY CONTRACTOR IN RESPONSE TO INSTALLATION VERIFICATION AND SHEET TITLE:
<br /> J. IN MECHANICALLY VENTILATED BUILDINGS, PROIDE REGULARLY OCCUPIED AREAS OF THE BUILDING WITH AIR FILTRATION MEDIA FUNCTIONAL PERFORMANCE TEST RESULTS. HVAC SCHEDULES AND
<br /> FOR OUTSIDE AND RETURN AIR PRIOR TO OCCUPANCY THAT PROVIDES AT LEAST A MERV OF 11. TESTI N G,ADJ U ST I N G,BALAN C I N G. J.CONSTRUCTION AND POST CONSTRUCTION TESTING:ADDITIONAL TESTING MAY BE REQUIRED
<br /> K. INSTALLATIONS OF HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL COMPLY WITH SECTIONS 5.508.1.1 AND BY LEED AND OTHER PROCESSES THAT MAY OCCUR OUT OF SEQUENCE WITH COMMISSIONING SPECIFICATIONS
<br /> 5.508.1.2. Mechanical Contractor or an Independent Air balance Contractor shall accurately balance the air SERVICE. CONTRACTOR SHALL CONDUCT, DOCUMENT,SUPPORT AND SCHEDULE THIS TESTING khnackel SCALE:AS SHOWN
<br /> and hydronic(where applicable)systems to provide air and water quantities(where applicable) AS DIRECTED BY STARBUCKS CXA.
<br /> L. INSTALL HVAC AND REFRIGERATION EQUIPMENT THAT DOES NOT CONTAIN CFCS. indicated on the drawings and in this specification. Operate automatic controls system and verify engineers® SHEET NUMBER:
<br /> set points.A NEBB or AABC Certified Supervisor shall be in charge of work.Submit two(2)copies K.CONTRACTOR TO ENSURE DUCT SMOKE DETECTORS ARE INSTALLED UNDER THE SUPERVISION WwYork o Onshe oLwAnow aseeWe®HonoMu
<br /> M. INSTALL FIRE SUPPRESSION EQUIPMENT THAT DOES NOT CONTAIN HALONS. of the balance report to the Engineer for approval. Include a copy of the balance report as OF BUILDING FIRE DETECTION OR ALARM SYSTEM WHEN THE BUILDING IS EQUIPPED WITH SUCH W0-581-0963 vnnvidnadaelmm 00o
<br /> approved by the Engineer with application for final contract payment. SYSTEM. 80 south Lake Avenue, suite 640 Pasadena, CA 91101 M-0001
<br /> SE JOEW:181163