My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 10:14:49 AM
Creation date
10/5/2021 9:27:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS 71 <br /> Tank ID (one OPE per column) T1: 87 M T2: 87 S T3: 91 <br /> Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? N No N No N No ❑ No <br /> OPE Model 847390-109 847390109 847390109 <br /> What is the OPE response when activated? ❑ Shut off ❑ Shut off ❑ Shut off ❑ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> N Restricts N Restricts N Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> N Audible N Audible N Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> N Visual N Visual N Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping N Yes* N Yes* N Yes* ❑ Yes* <br /> that may interfere with the OPE operation? ❑ No ❑ No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 98.30 97.56 97.81 <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 90 90 90 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to N Yes N Yes N Yes ❑ Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7.. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results N Pass ❑ Pass ❑ Pass ❑ Pass <br /> ❑ Fail N Fail N Fail O Fail <br /> 8.- COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> 1) Only one tank passes the OPEI but will not activate next alarms <br /> unless the first alarm has been cleared. <br /> 2) OPW Drop tubes with overfill prevention valves will be installed <br /> 3) A permit with SJCEHD has been submitted <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.