Laserfiche WebLink
X09 66�.2! cool <br /> P P =o Q <br /> � <br /> 0� o � <br /> � (n <br /> Z r= ODo � <br /> D O joN <br /> to � w <br /> D o CD w <br /> ICD ry -;�- <br /> m / C � m <br /> �] Table 4-2 summarizes inspections and tests performed on bulk storage containers f!� b D <br /> Z ("EE" indicates that an environmentally equivalent measure is implemented in place of x 3 <br /> m the inspection/test, as discussed in Section 3.1 of this Plan). vNi '-d <br /> 2 <br /> W Table 4-2: Scope and Fre-men y of Bulk Storage Containers Inspections and TestsLn <br /> Q <br /> Tank ID <br /> Inspection/Test Rear USTs Drums S <br /> Enclosure 0'q <br /> Ln <br /> Yard <br /> Visual inspection by facility M M M M O <br /> personnel(as per checklist of A A A A <br /> Appendix C} �p <br /> External inspection by certified 5 yr <br /> EE EE rn <br /> nspector(as per STI Standard <br /> 5P-001) CD <br /> EE � N <br /> In#ernal inspection by certified t N <br /> inspector(as per STI Standard 00 a• <br /> SP-001) <br /> O� <br /> Tanis tightness test meeting n!a q CL <br /> requirements of 40 CFR 280 <br /> O �• <br /> Legend: M:Monthly <br /> A:Annual p <br /> EE: Inspection not required given use of environmentally equivalent measure(refer to Section 3, � <br /> of this Plan). C' <br /> w Or earlier,as recommended by the certified inspector based on findings from an external <br /> inspection. >y <br /> t Internal inspection may be recommended by the certified inspector based on findings from theCD <br /> external inspection. P <br /> A� x <br /> The frequency above is based on implementation of a scheduled inspectionitesting a- CD <br /> program. To initiate the program,ASTs will be inspected by the following dates: N CD <br /> All ASTs should be scheduled o <br /> Y USTs, if any are installed, are to be regularly tested <br /> 4.4.3 Heating Coils (40 CFR 112.8(c)(7)) <br /> >y � <br /> There are no heating coils as this location is in a temperate zone. o <br /> 4.5 Overfill Prevention Systems (40 CFR 112.8(c)(8)Z <br /> All tanks in the fuel yard are equipped with manual leak-detectors. Secondary containment is CD <br /> provided in the event of overfills, as described in this Plan. CD <br /> r• o <br /> This facility does not use any 55 gallon storage drums to contain any petroleum product ' <br /> CD <br /> Facility personnel are able to monitor product levels throughout the filling operations via the CD <br /> manual leak-detector system which measures the product level in the tanks. o -0; <br /> 0 <br /> x m o <br /> � � a <br /> CD <br /> ¢ U � <br /> O D o <br /> rrQ <br /> v � � <br /> N <br /> CD N CD CY) <br /> 0 " O <br />