Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for A L POWELL TRUCKING as of December 13, 2021. <br /> Open violations from October 04, 2021 inspection <br /> Violation#605-Plan failed to include an adequate facility diagram,or no facility diagram was included. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan failed to adequately and <br /> accurately describe the physical layout of the facility. <br /> The facility diagram did not indicate transfer area and the 300 gallon motor oil was not indicated on the map(2- 150 <br /> gallon hydraulic oil and motor oil was listed). <br /> REGULATION GUIDANCE: (3) Describe in your Plan the physical layout of the facility and include a facility diagram, <br /> which must mark the location and contents of each fixed oil storage container and the storage area where mobile or <br /> portable containers are located.The facility diagram must identify <br /> the location of and mark as"exempt'underground tanks that are otherwise exempted from the requirements of this <br /> part under§ 112.1(d)(4).The facility diagram must also include all transfer stations and connecting pipes, including <br /> intra-facility gathering lines that are otherwise exempted from the requirements of this part under§ 112.1(d)(11). <br /> You must also address in your Plan: <br /> (i)The type of oil in each fixed container and its storage capacity. For mobile or portable containers, either provide <br /> the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or <br /> portable containers,the types of oil, and anticipated storage capacities; <br /> CORRECTIVE ACTION: The SPCC Plan shall include a facility diagram that must identify the location and contents <br /> of each fixed storage container and the storage area where mobile or portable containers are located. It must <br /> identify the location of and mark as"exempt'all underground storage tanks. It must also include all transfer stations <br /> and connecting pipes, including intra-facility gathering lines. Immediately update SPCC plan to adequately and <br /> accurately describe the physical layout of the facility; submit proof of correction to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 3 of 6 <br />