My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014459
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
28524
>
2600 - Land Use Program
>
PA-2100209
>
SU0014459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 4:43:58 PM
Creation date
10/6/2021 11:44:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014459
PE
2631
FACILITY_NAME
PA-2100209
STREET_NUMBER
28524
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
24138002
ENTERED_DATE
10/5/2021 12:00:00 AM
SITE_LOCATION
28524 S KASSON RD
RECEIVED_DATE
1/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Engineering and building permit applications received by our offices are subject to the current fee <br /> schedule for South San Joaquin County Fire Authority. Contact our offices for additional information. <br /> a. Application processing fees and minimum plan review fees are due at time of submittal of <br /> construction documents. <br /> b. Additional plan review fees, minimum inspection fees and administrative fees are calculated <br /> on approval of project and shall be paid prior to issuance of permit. <br /> c. Permit holder is responsible for any additional inspection fees incurred, and shall be paid <br /> prior to final inspection. <br /> 3. Prior to construction, all-weather fire apparatus access roads shall be installed. Fire apparatus <br /> access roads during construction shall have a minimum 20' unobstructed width in accordance with <br /> CFC §503. <br /> 4. All hydrants shall be installed, inspected and tested prior to bringing combustible materials onsite, <br /> including storage. <br /> 5. Prior to occupancy of each new business, the tenant shall contact South San Joaquin County Fire <br /> Authority for a new business inspection. Additional fees may be required for New Business, Annual <br /> and Operational Fire Permits. All fees shall be paid prior to approval of inspections. <br /> 6. Knox boxes shall be required. The operator of the building shall immediately notify the Fire <br /> Authority and provide the new key where a lock is changed or rekeyed. The key to such shall be <br /> secured in the key box. <br /> 7. Building shall be provided with approved address identification in accordance with CFC §505. <br /> 8. Prior to final inspection, emergency radio responder coverage shall be tested to confirm coverage <br /> areas. It is beneficial for the applicant to conduct testing at foundation as retrofitting for the conduit <br /> is costly. If coverage is inadequate, a separate permit for emergency radio responder coverage shall <br /> be submitted to SSJCFA for review and approval prior to installation. <br /> a. Additional improvements may warrant additional testing to be performed. Testing shall be <br /> the determination of the fire code official. <br /> 9. Additional comments may occur upon submittal of construction documents. <br /> Feel free to contact our offices, should you have any questions. <br /> Thank you, <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.