Laserfiche WebLink
rn <br /> i <br /> 0 <br /> I <br /> Lo <br /> I GREASE INTERCEPTOR SIZING Q <br /> 0 R 1 10 i I 3"Fs-2 O O O n <br /> SANITARY GREASE <br /> 21 3"FS-l( I 2"FS-2® FIXTURE NO' D.F.U. TOTAL D.F.U. TOTAL o <br /> I <br /> � D.F.U. D.F.U. ,L, <br /> - - - - - - 3"FD 37D - - <br /> /- __ <br /> 22 2"FS-21 1 //3' <br /> — — — — — — 17 WATER CLOSET 2 4 8 - - z o <br /> 3.. I cn> <br /> 3 2�� w <br /> 2z <br /> z0 4' GCO I 4 FC I LAVATORY 2 1 2 <br /> 4' <br /> — m <br /> 4 HAND SINK 2 -- - 2 4 0 <br /> 14 11 2 w <br /> — — — — — — <br /> �3-01s WCO Y <br /> 3„ MOP SINK 1 -- - 3 3 <br /> 2" X 1 z <br /> 19 f4" GCO F 1 I 4„ FCO FLOOR DRAIN 5 2 4 3 18 <br /> I w <br /> 2" t-21112 FLOOR SINK 8 2 4 2/6 28 Q <br /> 11 2"FS-3 1 4 4.. <br /> II � � <br /> m <br /> 2° 3" w <br /> Q <br /> WH 1 2"FS-2 3"FD 3 FCO 17 (>3/4" F I TOTALS: 18 53 Q o <br /> 311 <br /> 15 16 L — — — — —FL-- -1 GREASE INTERCEPTOR SIZING PER 2016 UPC TABLE 10-3 F <br /> 3/4" FCO WH C ---- - -------------------- I — 53 DFU - 1500 GALLON MINIMUM CAPACITY <br /> O 1s I � _ -1 <br /> 13 MS 3 3"FS-1(: <br /> 0 1 1 3"FS-1 6 11 3/41' 3/4" <br /> � W� <br /> 3/41 3Y <br /> 10 <br /> U <br /> z <br /> Lo <br /> 3 " <br /> U Q <br /> /4L0 � <br /> � L <br /> L <br /> cn 0-) rr) <br /> Lo <br /> 4 2"FD 2"FD :LLJ:5io Q O <br /> FCO 4" <br /> 17 I 2 WC < � L17 <br /> I 2" z ~ O <br /> WC 1 I 411 FCO Q � z <br /> O ' w w O <br /> 13 2 1 I 2 L L 2 _ _ <br /> o <br /> — — — — — — — — — — ——— <br /> CD N a- <br /> • <br /> rn <br /> rn <br /> b� 0 Lo <br /> PLUMBING FLOOR PLAN — WASTE & VENT <br /> +; ~Ln <br /> 1/4" = 1'-0" Q Q <br /> m <br /> � 5� <br /> bq =o <br /> . '..� �o <br /> PLAN KEY NOTES PLUMBING NOTES PLUMBING SPECIFICATIONS CLo <br /> Lo <br /> 10 1"COMBINED 1" INDIRECT WASTE FROM EACH DRINK BAR&3/4" INDIRECT WASTE FROM COKE DISPENSER 1. WASTE PIPING TO SLOPE 2% MINIMUM & INSTALLED PER REQUIREMENTS OF THE 2016 CALIFORNIA PLUMBING CODE. SCOPE : PROVIDE ALL MATERIALS & LABOR AS REQUIRED FOR A COMPLETE PLUMBING SYSTEM AS SHOWN. J co <br /> IN PVC SLEEVE THRU WALL TO FLOOR SINK. O�- <br /> 2 3/4" INDIRECT WASTE FROM COKE DISPENSER TO FLOOR SINK. 2. ALL PIPING IN BUILDING TO BE SUPPORTED &SEISMICALLY BRACED PER REQUIREMENTS OF THE 2016 CBC&CPC. SUBMITTALS : WITHIN 30 DAYS AFTER AWARD OF CONTRACT,SUBMIT 6 SETS OF SHOP DRAWINGS OF ALL z w <br /> �J PROPOSED EQUIPMENT TO ARCHITECT FOR APPROVAL. J <br /> 3 WASTE PIPE FROM FLOOR SINK SERVING DRINK BARS &COKE DISPENSERS TO BE ACID RESISTANT TO POINT OF 3. VERIFY THE LOCATIONS OF THE WATER,GAS & SEWER PIPING POINTS OF CONNECTION BEFORE STARTING WORK. <br /> O SUBSTITUTIONS : ALL OR EQUAL SUBSTITUTIONS MUST BE SUBMITTED TO &APPROVED BY THE BUILDING OFFICIAL o <br /> CONNECTION TO FROM HAND SINK. 4. COORDINATE INSTALLATION OF GAS METER WITH GAS SERVICE PROVIDER BEFORE STARTING WORK. PRIOR TO INSTALLATION OF THAT ITEM. o <br /> 2"WASTE FROM HAND SINK. 5. PROVIDE TRAP PRIMERS FOR FLOOR DRAINS IN RESTROOMS &WHERE REQUIRED BY LOCAL CODES.PROVIDE DEEP SEAL TRAPS FOR PERMITS : PROVIDE & PAY FOR ALL PERM ITS,LICENSES & FEES REQUIRED FOR THE COMPLETION OF WORK. <br /> 5 3/4" INDIRECT WASTE FROM BLENDER WASHER& 1" INDIRECT WASTE FROM ICE BIN TO FLOOR 0 SINK. FLOOR DRAINS & FLOOR SINKS WITHOUT TRAP PRIMERS. CODES : WORK SHALL CONFORM WITH ALL GOVERNING CODES INCLUDING THE 2016 CPC. <br /> 6 O 2" INDIRECT WASTE FROM PREP SINK TO FLOOR SINK. 6. ALL CLEANOUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE.THE CONTRACTOR SHALL COORDINATE ALL CLEANOUT LOCATIONS WITH EQUIPMENT,CABINETS,ETC. AND THE OWNERS REPRESENTATIVE PRIOR TO ANY INSTALLATION.CLEANOUTS TO BE WORKMANSHIP : WORKMANSHIPSHALL BE FIRST CLASS THROUGHOUT. <br /> 7 RUN COMBINED 3/4" INDIRECT WASTE FROM ICE CUBER& 1" INDIRECT WASTE FROM ICE BIN TO FLOOR SINK. PROVIDED PER THE 2016 CALIFORNIA PLUMBING CODE. <br /> PROTECTION : PROTECT ALL EQUIPMENT& MATERIAL FROM DIRT& DAMAGE REPLACING ANY DAMAGED WORK SO <br /> ® 3/4" INDIRECT WASTE FROM OVEN STEAMER TO FLOOR SINK. 7. ALL VALVES OR OTHER EQUIPMENT INSTALLED IN NON-ACCESSIBLE LOCATION TO BE INSTALLED BEHIND AN ACCESS PANEL. THE ENTIRE INSTALLATION WILL BE LEFT IN NEW CONDITION. <br /> 0 <br /> 8. ALL VENTS THRU ROOF TO TERMINATE A MINIMUM OF 10 FEET FROM ANY OUTSIDE AIR INTAKE. INSTALLATION '. SPACE REQUIREMENTS FOR INSTALLATION OF THIS WORK SHALL BE CONSIDERED PRIOR TO 2" INDIRECT WASTE FROM 3-COMPARTMENT SINK TO FLOOR SINK. ER <br /> 9. PROVIDE GAS PIPING GAS EQUIPMENT& MAKE ALL FINAL CONNECTIONS REQUIRED FOR OPERATION.PROVIDE ASEDIMENT T <br /> INSTALLATION.SPACE CONFLICTS CAUSED BY FAILURE TO CONSIDER ALL SUCH REQUIREMENTS SHALL BE <br /> EACH APPLIANCE CONNECTION TO THE GAS PIPING SYSTEM PER CPC 1211.8.O <br /> 10 3/4" CONDENSATE DRAIN WITH VENTED P-TRAP FROM DRAIN CONNECTION IN BASE OF ROOFTOP A.C. UNIT. EACH <br /> AT RESOLVED BY THE CONTRACTOR AT NO ADDITIONAL COST. <br /> O 10. PROVIDE A LEVER HANDLE GAS SHUT-OFF VALVE IN THE BRANCH PIPING OF EACH APPLIANCE OR PIECE OF EQUIPMENT, FOR EACH <br /> EXECUTION : INSTALL PER THE REQUIREMENTS OF ALL GOVERNING CODES& IAL HA INSTALLATION �� o N O <br /> 11 3/4" CONDENSATE DRAIN FROM A.C. UNITS ON ROOF,RUN ABOVE CEILING AND DROP IN WALL TO FLOOR SINK.PIPING o <br /> TO SLOPE 1/8" PER FOOT&TO BE INSULATED. STANDARDS.SUSPENDED PIPING SHALL BE HUNG FROM SUPERSTRUT OP. EQUAL HANGERS.NO HANGING FROM � � o .� a <br /> APPLIANCE INSTALL QUICK DISCONNECT,FLEXIBLE PIPE WHEN ALLOWED BY CODE AND RESTRAINING DEVICE FURNISHED BY PLUMBER'S TAPE OR OTHER MAKESHIFT HANGERS WILL BE ALLOWED. � ri � <br /> OWNER.APPLIANCES & EQUIPMENT LISTED FOR USE WITH CASTERS OR OTHERWISE SUBJECT TO MOVEMENT FOR CLEANING ALONG 114- <br /> TESTING <br /> 12 CONNECT 3/4" CONDENSATE DRAIN WITH VENTED P-TRAP TO ROOFTOP A.C. UNIT&DROP THRU ROOF.INSTALL WITH OTHER LARGE & HEAVY APPLIANCES THAT MOVE TO BE INSTALLED IN ACCORDANCE WITH CSAZ21.69. THE COMMERCIAL COOKING w CO <br /> CONDENSATE DRAIN TIGHT TO TOP OF BOTTOM CHORD OF EXPOSED TRUSSES IN DINING AREA.PIPE TO RUN BELOW TESTING & DISINFECTING : TEST& DISINFECT SYSTEM PER CODE. o �, o <br /> APPLIANCE CONNECTOR INSTALLATION TO BE CONFIGURED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. � a o <br /> &CLEAR DUCTWORK RUNNING THRU TRUSSES ABOVE. CLEANUP : AT THE COMPLETION OF WORK,CLEAN THE AREA OF ALL DEBRIS,SO THE SITE IS LEFT IN CLEAN w <br /> 11. INSTALL SHUT-OFF VALVES ON ALL HOT&COLD WATER LINES TO FIXTURE OR EQUIPMENT. CONDITION SATISFACTORY TO THE ARCHITECT&OWNER. <br /> 13 INOTO ADJACENT NNECT 3/4" OSTUD WAPER OLL DROP &STUB NDENSATE DRAIN <br /> THRU WALL I LOW AS POSSIBLEN BOX OEVAPORATOR <br /> TERMINATION NATIONILS & RUN LOVER FLOOR SIONG WALKIN NK 12. SEE KITCHEN EQUIPMENT DRAWINGS FOR PLUMBING ROUGH-IN REQUIREMENTS & FOR ADDITIONAL WORK TO BE FURNISHED& <br /> PROVIDING TRAP&AIR GAP.SEAL WALKIN BOX WALL PENETRATION & INSTALL HEAT TAPE ON PIPING IN FREEZER. INSTALLED BY CONTRACTOR.ALL ROUGH-IN PLUMBING AND FINAL CONNECTIONS TO KITCHEN EQUIPMENT SHALL BE MADE BY THE GUARANTY : IN ADDITION HONORING EQUIPMENT MANUFACTURER'S WARRANTIES,THE CONTRACTOR SHALL BE �� T <br /> CONTRACTOR UNLESS OTHERWISE NOTED. RESPONSIBLE FOR ALL DEFECTS IN MATERIALS &WORKMANSHIP FOR A PERIOD OF ONE YEAR AFTER OWNER'S <br /> 14 INSTALL FUNNEL RECEPTOR 1/2" DRAIN ON WALL TO RECEIVE DISCHARGE FROM REDUCED PRESSURE BACKFLOW ACCEPTANCE. • <br /> PREVENTER DRAIN OUTLET.RUN 1/2" DRAIN RECEPTOR PIPE IN WALL TO FLOOR SINK. 13. FLOOR SINKS TO BE INSTALLED PER LOCAL HEALTH DEPARTMENT REQUIREMENTS. <br /> 15 RUN FULL SIZE COPPER WATER HEATER T&P RELIEF VALVE DISCHARGE AND 1/2" PVC WATER HEATER FLUE 14. PROVIDE WATER SHOCK ARRESTORS OR AIR CHAMBERS WHERE SHOWN ON PLANS AND AS REQUIRED BY THE 2016 CPC. <br /> CONDENSATE DRAINS TO FLOOR SINK IN &THRU WALL TO FLOOR SINK.SEE WATER HEATER DETAIL. <br /> 16 <br /> 5-73"0 CONCENTRIC EXHAUST/INTAKE PIPE FROM WATER HEATER CAPPED THRU ROOF WITH ROOF TERMINATION 15. PROVIDE AIR GAPS FOR INDIRECT DRAINS AS REQUIRED BY THE 2016 CALIFORNIA PLUMBING CODE. <br /> KIT.INSTALL PER MANUFACTURER'S INSTALLATION MANUAL&COMPLY WITH CODE REQUIREMENTS. 16. COORDINATE <br /> INSTALLATION <br /> OF PLUMBING WORK WITH ALL <br /> REVIEW ARCHITECTURAL OTHER <br /> TRADES <br /> E SO AS TO AVOID UNNECESSARY DELAY OR SCUPPER DRAIN SIZING w <br /> 17 2"VENT UP THRU ROOF. Z <br /> 18 3"VENT UP THRU ROOF. 17. THE WATER.SUPPLY PIPE FOR ANY CARBONATORS OR SODA DISPENSERS SHALL BE PROTECTED BY A STAINLESS STEEL REDUCED Q <br /> O PRESSURE BACKFLOW PREVENTER FOR CARBONATED BEVERAGE DISPENSERS INSTALLED WITHIN THE CARBONATED BEVERAGE SCUPPER DRAINS & DOWNSPOUTS BY GENERAL CONTRACTOR AND ARE SHOWN w <br /> 19 O SEE CIVIL SITE UTILITY PLAN FOR CONTINUATION OF 4"SANITARY WASTE. DISPENSER.STAINLESS STEEL PIPE AND FITTINGS OR APPROVED PLASTIC PIPES AND FITTINGS SHALL BE USED FROM THE BACKFLOW AND DETAILED ON THE ARCHITECTURAL PLANS. w N PREVENTER TO THE CARBONATOR.NO COPPER PIPE OR FITTINGS ARE ALLOWED ON THE DOWNSTREAM SIDE OF THE BACKFLOW LL <br /> PREVENTER. z <br /> 20 SEE CIVIL SITE UTILITY PLAN FOR CONTINUATION OF 4"GREASE WASTE TO GREASE INTERCEPTOR(GI). MAIN ROOF AREA IS 2580 SQ. FEET/3 SCUPPER DRAINS = 860 SQ. FEET PER DRAIN. c� <br /> 21 O SEE CIVIL SITE UTILITY PLAN FOR CONTINUATION OF 3"VENT FROM GREASE INTERCEPTOR. 18. APPROVED INTERNAL AIR GAP OR BACK-FLOW PREVENTION DEVICES TO BE PROVIDED IN WATER SUPPLY TO OVEN LLJ <br /> LL' Q STEAMER,COFFEE/TEA BREWER, ICE CUBER, WATER FILTER,DRINK SYSTEM & MOP SINK FAUCET.FURNISH & INSTALL THE APPROPIATE SCUPPER DRAINS & DOWNSPOUTS ARE SIZED FOR A RAINFALL OF 3" PER HOUR PER <br /> � <br /> 22 USED COOKING OIL STORAGE UNIT NOT INCLUDED IN THIS WORK,BEING PART OF THE FRYER OIL COLLECTION DEVICES FOR EQUIPMENT NOT HAVING APPROVED INTERNAL BACKFLOW PROTECTION. 2016 UPC TABLE 11-1 WITH MAXIMUM ALLOWED AREA FORA 2"0 ROOF DRAIN OR <br /> SYSTEM FURNISHED& INSTALLED BY GREASE COLLECTION SYSTEM VENDOR IN SEPARATE SCOPE OF WORK. 19. THE OWNER OR KITCHEN EQUIPMENT SUPPLIER MAY SUBSTITUTE EQUIPMENT OR THE EQUIPMENT MAY VARY FROM WHAT IS 6.5"WIDE X 4" HIGH SCUPPER DRAIN IS 960 SF &2930 SF FOR A MINIMUM 3'10 Q <br /> SHOWN.VERIFY ALL CRITICAL DIMENSIONS WITH THE OWNER PRIOR TO CONSTRUCTION.FAILURE OF THE CONTRACTOR TO VERIFY VERTICAL DOWNSPOUT AT EACH SCUPPER DRAIN. m W J <br /> THESE DIMENSIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION DIRECTLY UPON THE CONTRACTOR. wm <br /> 20. HOT WATER PIPING TO BE INSULATED.INSTALL INSULATION SHIELDS AT PIPE HANGERS &SUPPORTS. w ♦^ 10� <br /> V O <br /> 21. WATER PIPING TO BE TYPE M COPPER ABOVE GROUND &TYPE K UNDERGROUND. wZ O <br /> � J <br /> 22. INTERIOR GAS PIPING TO BE SCH. 40 BLACK STEEL,GALVANIZED OUTSIDE OF BUILDING.UNDERGROUND PIPE TO HAVE PG&E WRAP. <br /> o LL <br /> w oo H <br /> 23. WASTE &VENT PIPING TO BE CAST IRON OR ABS DWV WHERE ALLOWED LOCALLY. [y N Z <br /> 24. INDIRECT WASTE PIPING TO BE COPPER DWV. <br /> o� � w o W <br /> p U <br /> 25. CONDENSATE DRAIN PIPING TO BE COPPER,INSULATED ABOVE CEILING.INSTALL INSULATION SHIELDS AT PIPE HANGERS & 06 <br /> SUPPORTS.CON DEN SATE DRAIN PIPING TO BE RUN AT MINIMUM 1% SLOPE TO RECEPTOR. n 0LLI <br /> o LL <br /> 26. ALL EXPOSED ABS AND PVC PIPING TO BE PAINTED WITH LATEX PAINT. Lu 0 L w 0 = o o (j <br /> 27. WATER CLOSETS & LAVATORIES TO BE INSTALLED PER CALIFORNIA STATE HANDICAPPED REQUIREMENTS. of Q o M �o0 Q <br /> W N (n <br /> P - 2 <br />