Laserfiche WebLink
S JCOG, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> San Joaquin County Multi-Species Habitat Conservation&Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: John Funderburg,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. <br /> Date: February 24,2020 <br /> -Local Jurisdiction Project Title: PA-1900302(SA) <br /> Assessor Parcel Number(s): 087-100-81,-82 <br /> Local Jurisdiction Project Number: PA-1900302(SA) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Urban Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Mr. Funderburg: <br /> SJCOG, Inc. has reviewed the application referral for PA-1900302(SA). This project consists of a Site Approval application <br /> to expand an existing trailer manufacturing facility in two (2) phases over five (5) years. Phase One is the construction of <br /> a 6,400 square foot metal building for sand blasting trailers with building permits to be issued within eighteen (18) months. <br /> Phase Two is the construction of a 36,000 square foot metal warehouse building for the storage of equipment with <br /> building permits to be issued in sixty (60) months. APNs 087-100-81 and 087-100-82 will be merged into one (1) parcel. <br /> The project site is on the north side of East Waterloo Road and the east side of North Cherryland Avenue, Stockton <br /> (APN/Address: 087-100-81, -82/3144 North Cherryland Avenue, Stockton). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This Project is subject to the SJMSCP. This can be up to a 30 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br /> information package. htti)://www.sicog.Ora <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs first,the project applicant must: <br />