Laserfiche WebLink
A Department of Public Works <br /> SAN J O A Q U I N Kris Balaji,Director of Public Works <br /> —COUNTY— <br /> ' <br /> COUNTY S_ <br /> Fritz Buchman,Deputy DirectorlDevelopment <br /> �._�,_ �' Greatness grows here. <br /> w� ®� Jim Stone,Deputy DirectorlOperations <br /> Najee Zarif,Interim Deputy Director/Engineering <br /> March 9,2020 Kristi Rhea,Manager of Strategic Initiatives <br /> MEMORANDUM cEw <br /> TO: Community Development Department MAR a <br /> CONTACT PERSON: John Funderburg San t <br /> oacluin� <br /> FROM: Alex Chetley,Engineering Services Manager' Community Devejp <br /> Development Services Division pnIft <br /> SUBJECT: PA-1900302;A Site Approval application to expand and existing trailer manufacturing <br /> facility in two(2)phases over five(5)years.Phase One is the construction of a 6,400 <br /> square foot metal building for sand blasting trailers with building permits of be issued <br /> within eighteen(18)months.Phase Two is the construction of a 36,000 square foot metal <br /> warehouse building for storage of equipment with building permits to be issued within <br /> sixty(60)months; located on the north side of East Waterloo Road and the east side of <br /> North Cherryland Avenue, Stockton. (Supervisorial District 4) <br /> PROPERTY OWNER: Thomas&Delores Pistacchio APPLICANT: Kamal Sabeh <br /> Delores Hutcheson <br /> ADDRESS: 3144 N. Cherryland Avenue, Stockton APN: 087-100-81 & -82 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> The site is within the Phase 1 area of the National'Pollutant Discharge Elimination System(NPDES). <br /> State Route Highway 88 has an existing and planned right-of-way width per Caltrans. <br /> RECOMMENDATIONS: <br /> 1) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 2) The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 3) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> ff] Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />