Laserfiche WebLink
PRIME BIDDER CERTIFICATION OF DISABLED VETERAN <br />BUSINESS ENTERPRISE PARTICIPATION <br />Page 2 of 2 <br />PART III--DVBE DOLLAR PARTICIPATION OF BIDIPROPOSAL <br />Architectural, engineering, environmental, land surveying or construction management firms complete this part after selection by the district and before the contract is <br />signed, All others must complete this section and Include it with the bid. <br />Show deductive alternate(s) in parenthesis. For more alternates/base bids, use a separate page to show Items. <br />A. If your business enterprise is a DVBE, list In the appropriate column the total dollar amount of your bid to be performed by your own participation. <br />B. list all your DVBE subcontractors/suppliers. Enter in the appropriate column the dollar amount for each of your subcontractors/suppliers. <br />C. Enter the total of Lines A and B for each column. <br />D. Enter the. dollar amount of the bid/proposal to be performed by non-DVBE firms. Note. This line is the sum of the prime and subcontractor(s) non-DVBE dollar participation. <br />E. Enter the sum of the column totals from Line C and Line D. Note: Please be aware that the final determination of DVBE compliance Is made based on the contract amount <br />resulting from the districtIs acceptance or rejection of alternates. <br />Alternate No. S <br />Alternate No. 3 <br />Alternate No. 4 <br />Base Bid/Proposal <br />Alternate No.1 <br />Alternate No. 2 <br />or Base Bid B <br />or Base Bid C <br />(Modernation or <br />Reconstruction Only) <br />A. Prime Bidder, If DVBE (own participation) <br />S <br />$ <br />$ <br />$ <br />B. DVBE Subcontractor or Supplier <br />r y <br />t ( <br />j <br />ir•i �! rt't <br />R <br />aF T <br />t. <br />. <br />2. <br />3. <br />4. <br />C. Subtotal (A and B) <br />D. Non-DVBE <br />E. Total Bid <br />