Laserfiche WebLink
Chapter 1 <br /> Introduction <br /> 1.1 Project Overview <br /> This Initial Study/Mitigated Negative Declaration(IS/MND)evaluates the proposed amendments to <br /> the San Joaquin County General Plan,Mountain House Master Plan(Master Plan),Specific Plan I]and <br /> Rezoning(these amendments are referred to,collectively,as the project).Specifically,the project <br /> includes amendments to Neighborhoods H,I.J,]v and the Town Center in the Mountain House <br /> development.This chapter explains the project overview,provides the purpose of the 1 S/MND, <br /> establishes the context and scope of the IS/MND,provides references to relevant previous <br /> environmental review documents and reports,and provides a summary of project information.San <br /> Joaquin County is the lead agency For the project far purposes of environmental review under the <br /> California Environmental Quality Act(CEQA).Lead agency is defined by CEQA Guidelines Section <br /> 21067 as"the public agency which has the principal responsibility for carrying out or approving a <br /> project which may have a significant effect upon the environment." <br /> 1.2 Purpose of this Initial Study/Mitigated Negative <br /> Declaration <br /> The 1994 Master Plan was the subject of the certified 1994 Moantain House Muster F1Qn Final EFR <br /> (1994 MEIR).Public Resources Code(PRC)section 21166 provides: <br /> When an environmental impact report has been prepared for a project pursuant to this <br /> division,no subsequent or supplemental environmental impact report shall be re quired <br /> by the lead agency or by any resp onsible agency,unless one or more of the following <br /> events occurs: <br /> (a)Substantial changes are proposed in the projectwhich will require major revisions of <br /> the environmental impact report. <br /> (b)Substantial changes occur with respect to the circumstances under which the project <br /> is being undertaken which will require major revisions in the environmental impact <br /> report. <br /> (c)New information,which was not known and could not have been known at the time <br /> the environmental impact report was certified as complete,becomes available. <br /> If impacts resulting from changes to a project do not differ significantly from those analyzed in the <br /> previously certified EIR,a further E1R is not required. <br /> This IS/MND identifies the potential environmental effects resulting from the proj ect and includes <br /> updated analyses,particularly for the resource categories of air quality,energy,greenhouse gas <br /> emissions,noise,transportation,tribal cultural resource s,and wildfire.While the adoption of nese <br /> regulations or issuance of new guidelines does not constitute new information within the meaning <br /> of PRC 21166(c)if the information about the underlying resource and potential project impact was <br /> Mountain House master Plan and specific Plan H PuhApril zozz <br /> fic Draft <br /> Amendments and Reuisiorra to a pproued actions CF IMSO <br /> Initial 5tu*lm iterated Negative Declaration 1-1 <br /> 154328701.1 <br /> Resolution Template 01/2017 <br />