Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN II <br />be sited to maximize the presence of architecture and minimize open expanses of <br />parking an the Street edge. Where build)ngs back orae public streets, designs shall <br />utilize enhanced architau1uro, laridst;,ope, and scrheoing to ensure an attractive <br />edge condition and buffer service areas. <br />■ Service: Service areas for the larger commercial buildings will he provided from <br />the co lactor street an the northeast side- All service areas will be screened from <br />view with walls aria larldsoaping, in addition to any rMiired landscaping for <br />streets_ <br />• Residential Interface- Residential uses include a small high-density site located <br />between the cammeruial uses and Mountain Hausa Creek. Medium density <br />residential uses are located across the Collector street to the east. These uses will <br />either side onto ttie Colle etor street or face the street with rear alley garage <br />access, <br />■ Landscape, Lighting, and Signage. Roadway I@ndsuaping shall be consistent With <br />the requirements of the MHCSD Design Manual. Landscaping, lighting, furnishing <br />and general site layout and improvement requirements shall be aansistent With the <br />Umal* amm e&--LL"aster DevEloper Mountaln House Commercial, Office <br />& Industrial design Manual. <br />• Village Center Joint -Use Park -n -Ride Lots: As required by the Mountain House <br />TDM Program and Transit Plan, the village Center in Neighborhood K will include <br />a joint -use parking area for tra n sit riders. <br />Nei<ghbDfii earl L Can for <br />The Nei©hborhogd L Village Center includes a mix of oornmorcial, hlgh-denslty residential, <br />11mited industrial and open space uses clustered around a future rail station (Fig ure 4.'19), <br />Located north of Byron Road at the intersection of Mouritain House Parkway, the Center <br />provides a transitlon from the mixed use Town Center to the souM and the golf -'W4 lake <br />residential neighborhoods to tha north_ <br />Eisen Limited industrial uses are located at the intersection of Byron and Mountain <br />House Parkway, surrounding around the future rail station Eike. Parking areas for <br />the Llmited Industrial uses will be designed Tn r-nrijuriction vvitk+ the rail station to <br />provide opportunities far shared parkIng, if aippruprlate. The community <br />commercial retail site located along Mountain House Parkway atthecollactor <br />street will provide Jocal serving shopping and dining services for the adjacerd <br />rasidential �rrd Iridustrlai uses, <br />Access: Primary vehicular access is provided from a collector street (the extension <br />of Bethany Road) on Mountain House Parkway, with secondary access from a <br />driVewsy between the Community Commercial and Limited Industrial sites, <br />Pedestrian access will be provided from tine Mountain House Parkway nlu ti•use <br />path, sidewalks along bath sides of the Collector straet and walkways connecting <br />ala uses within the Village Center- A trail along the open spacelwater quality basln <br />will extend from the future train station northward along Mauntain House Creek, <br />and to The North Oommunity Park located West of the Village Center. A pedestrian <br />walkway wire also be provided along the south side of the Limited industrial use <br />connedrig the future train station and the intersection of Mountain House Parkway <br />and Byron Road_ <br />CHAPTER MUR <br />Resolution Template 01/2017 <br />-- 13EVELCIPMENT ANT) nESIGN PAGE 4.42 <br />