Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN 11 <br />Water Treatment plant are in compliance wit# the des Ian and operational <br />req uleements of the State. <br />1112 CAPITAL FACILITY COST AND PHASING <br />mastar Plan Summary <br />The Master Plan assumes that the water treatment plant will be pfiased in components <br />equal to 25% of the total faei!14, with one c omponernt in place at the start of eaail phase of <br />davMopment. <br />The first component was In place as of 2002. Storage tanks are assumed to Lae phased in <br />three increments after the first Specific Plan. Storage ponds, pumps, and othir Items will <br />be provided in smaller increments_ <br />Plan Description <br />As part pf the implementation of SPI I. phased construction of the water treatment plant wHl <br />be administered by the IVIPGSQ to ensure that adequate facilities are in place with each <br />inesemental phase of development. <br />SRI Implementation Measures <br />Cost and Phasing Requirements. Aft Implementing projects shall comply <br />wFth the applicable requirements of the Public Financing Plan and Fechnicaf <br />Report, Master Acquisition and Rei mbursernent Agreement betwean tN <br />MHCSO and Trimark Com rrmunities, MasterPlan Development Agreement <br />between San Joaquin Cpuhty and T#imaPk C$rurr+ "ties, UCthe Master <br />Deve_louer, MHCSD Capital Improvement Program, and applIca bke <br />development tee Ordinances. <br />CKAPTER TWELVP <br />Resolution Template 01/2017 <br />POTABLE WATER PAGE17,.15 <br />