Laserfiche WebLink
MOUNTAIN HOUSE MASTER PLAN <br />e) The County may require the expansion of a proposed Specific Plan area to <br />include land that may be needed ❑t may be impacted by the proposed <br />devalcpment. <br />17.5.5 Specific Plans For designated Areas <br />It is contemplated that Specific Plans may be processed for certain uses, including <br />the Town Center and Old River Industrial Park. Although development of each <br />area may occur in phases, it is desirable to have all of each area included in a <br />single Spedfic Plan, <br />Using the Town Center as an example. it Is expected that devetopment will <br />progress incrementally as the papulation grows. One Specific Paan will be prepared <br />for the Town Center. because the Town Center will be developed over a long <br />period, the Initial Specific Plan may include only the Central Commercial Center. <br />with -additional areas ging added by later amendments. In another case only the <br />first half of Old Rivar Industrial Park Is included in the first Specific Plan so the Plan <br />will need to be amended before the remaining lands are developed. <br />Certain public facilities or services may be required before a Specific Plan is <br />prepared for the Neighborhood in which the facilities are to be located Examples <br />include community -wide facilities such as Arterial roads, water, sewer and <br />drainage infrastructure, and utilities. This Tirfrastruciure, may pass through lands <br />not yet Included in a Specific Plan, but should be discussed In the Specific Paan <br />requldng them. In such cases, future Specific Pian needs shauJd be considered. <br />Policies; <br />Old River Industrial Park shall be included in not mare than one Specific <br />Pian, but the 5peciftc Plah may be planned and approved in phases via the <br />Specific Plan Amendment process (see Section 17,53 Specific Plan <br />Amendments). <br />At) When a puhlic facility located in an area without a Spedfic Plan is made <br />necessary by the development of another aria, the fadlity initially must be <br />lildWed in the 5pecifc Plan being prepared. The water treatment plant; <br />however, may be planned independently and incorporated in a later <br />Specific Plan. <br />17.6 SPECIAL PURPOSE PLANS <br />Some areas previously covered by a Specific Plan may require an additional level of <br />design study and review. The Community Commercial areas and tho Noighborhaad <br />Comers are examples. For such 'focus areas," more detailed plans will be required prior <br />to the approval of Development Permits. Special Purpose Plans will be used for this <br />purpose. Special Purpose Plans require the same gearing process as do Specific Plans, <br />but they are more orietlted to immediate development. Under provisions of the County <br />Vevelopment Title, uses within an area covered by a Special Purpose Plan may be <br />approved with only an improvement plan, and use permits and site approval applications <br />are not required. Special Purpose Plans roust be approved prior to approval of the first <br />development Permit (such as a Tentative Map) for the focus area <br />Chapter Seventeen <br />Resolution Template 01/2017 <br />Page 17.& <br />F{evised November 2005 <br />