Laserfiche WebLink
SAN JOAQUIN <br /> Environmental Health Department <br />COUNTY <br />Complaint Record Daily Time and Activity Summary from 9/24/2000 to <br />9/24/2021 for COJISLPEO located at <br />NEAR 11 W ATHERTON ISLAND <br />Activity Date Recorded by <br />09/24/2020 Sent email to Tyler Shell within the thread of his original email containing Refined PE 2546 MURO <br />48 min Clarity Oil SDS attachment which contains other copied. I copied Lead Senior SC 544 <br />Elena Manzo. I requested that someone calls me to provide a mailing address for <br />the Notice to Abate. <br />I received a call from Juan Neira, SJAFCA Project Manager. He asked that I send <br />the Notice to Abate to everyone copied in the email containing the SDS sheet for <br />the refined clarity oil. <br />I received a call from Tyler Shell who confirmed receipt of the email I sent on <br />09-23-20 containing toxicity table 1 and 2. He reported that testing should be <br />compete in ten days. <br />Details: <br />I received a call from Dave (Shimmick Construction Project Manager) who was <br />return my request for information regarding where to send the notice to abate. <br />Emailed Notice to abate to: Emailed Notice to Abate to: Tyler Shell <br /><tshell@shimmick.com> and a copy to: Dave C. Carr <dcarr@ksninc.com>: Juan <br />Neira <Juan.Neira@stocktonca.gov>; Erik Almaas <ealmaas@ksninc.com>; <br />Joseph D. Prescott <jprescott@ksninc.com>: Hagr Balla <br /><hballa@shimmick.com>; Scott Bunnell <sbunnell@shimmick.com>; Manzo, <br />Elena K. [EHD] <emanzo@sjgov.org> <br />09/24/2020 Updated complaint, Notice to Abate, and Prop 65, with new mailing address. PE 2546 MURO <br />60 min SC 007 <br />Received questions regarding the floating boom from Lead Senior Elena Manzo <br />(EHD). She asked that I head out to verify cleanup. However the cofferdam is on <br />the Smiths Canal and requires a boat in order to get a view of the inside of it. <br />Elena Manzo determined that I don't head out to release area, however that I <br />provided detailed information about this in my narrative. <br />Completed Narrative up to 9-24-20.. <br />09/28/2020 Completed narrative to date. PE 2546 MURO <br />60 min SC 007 <br />10/02/2020 Per request from Tyler Shell, Ishell@shimmick.com', drafted and sent him an PE 2546 MANZO <br />42 min email providing code sections excerpts and explanation on why they were included <br />in the NTA. Asked him to let us know if they booms have been removed from the <br />water surface. cc. to Claudia Muro (EHD). <br />SC 007 <br />10/09/2020 Emailed Tyler Shell (Shimmick Construction) a request on the status of the PE 2546 MURO <br />18 min release area, lab results, and waste disposal. SC 544 <br />Tyler replied that the lab results will be in next week. The cofferdam has been <br />cleaned with the floating boom. <br />10/28/2020 Received a lab report from Juan Neira, Senior Civil Engineer, San Joaquin Area PE 2546 MURO <br />18 min Flood Control Agency (SJAFCA). Reviewed results of the cofferdam water sample <br />to have no metals over the threshold limit. <br />SC 544 <br />10/28/2020 Discussed with Elena Manzo via email. PE 2546 MURO <br />30 min SC 007 <br />Page 3 of 5