Laserfiche WebLink
ROOF TOP (E)JOIST FIRE CODE&MECHANICAL CODE <br /> NOTE: 3M tm Fire Barrier Wrap 615+Commercial kitchen Grease Duct Systems <br /> 2X6 MIN.or � � (TYP) A 1-HR RATED WALL,OR A 1-HR RATED DUCT IS SECURED WITH SPOT 1-or 2-Hore shaft Alternative Zero Clearance to Combustibles <br /> MATCH JOIST DOUBLE JOIST AT EACH PANEL IS TO BE ADDED IN FRONT. WELDED TO ANGLE IRON AND Telescoping Wrap Technique With Banding For Ducts 24"or Less <br /> 2X6 @24"O.C.@ 8'SPAN SIDE OF OPENING (E)WALL SECURED TO ROOF CURB. 2 REVISIONS <br /> VERIFY 1. First layer 3M tm Fire Barrier Duct Wrap 615+ <br /> DUCT OPENING 2.Second layer 3M tm Fire Barrier Duct Wrap 615+ B <br /> ROOF CURB 3.3/4"wide filament tape. y <br /> X3" 4.Steel banding%"wide min.Typical for permanent fastening. <br /> NON RATED WALL 1 18" 5/8"THK. GYPSUM BOARD 5. Longitudinal joint butt or min 3"overlap on inner layer, <br /> 2x HANGERS 3/8"x1 1/2"HEX 18" Min 3"overlap on outer layer. 4 zi� <br /> TYPE"X"ON BOTH SIDES ROOF TOP <br /> TYP. SCREWS(2EACH) I I � 6. Perimeter(lateral)joint butt or min 3"overlap on inner layer, <br /> ROOF TOP SHEATHING <br /> S/S PLATE IS NEEDED FOR 11 11 Min 3"overlap on outer layer. 5 <br /> O O _ 1/2"THREADED ROD CLEAN UP ONLY. IT CAN BE 18"IS NEEDED IF THIS SECTION BOTTOM OF 7. Metallic Commercial Cooking Exhaust Duct <br /> CERAMIC TILE OR NON- L----- -------------HOOD--------------L IS NOT 1-HR ROOF TOP SHEATHING <br /> COMBUSTIBLE PANEL(NO FRP) DUCT System integrity is limited by quality of installation. <br /> O O Ducts>24"wide require pinning on the bottom side <br /> N of horizontal ducts and on a minimum of one of the <br /> 2"x2"x1/8" 6"MIN.TO DUCT 16 GAUGE GALV <br /> ANGLE PLATE x 12"MAX. wider sides of a vertical duct.Vertical ducts require <br /> < AIR SPACE pinning on any side>48" <br /> 1/2"NUTS(TYP.) �--� WALL FOR THE HOOD 14SLOPE 6 <br /> WELDED JOIST CUT FOR OPENING FRAMING MEMBERS AROUND 3 <br /> W/SIMPSON U HANGERS OPENING TO BE SAME SIZE <br /> L20 HOOD AS JOIST WITH SIMPSON +mm` <br /> 20 GAUGE HANGERS AS REQUIRED. <br /> 3M 615+ FIREWRAP 18" 18" <br /> (E)CEILING VERIFY m <br /> VERIFY AT SITE 1-HR RATED �1m <br /> DET'L 1 HOOD MOUNTING DETAILS DET'L 2 DUCT ROOF OPENING DETAILS CEILING 18"MIN.ALL AROUND <br /> THIS DUCT AREA IS NEEDED �m <br /> FIRE WRAP WITH 3-M 615+ 1 ,ol <br /> NOTE: NOTE: <br /> INSTALL ELECTRICAL INTERLOCK FOR THE EXHAUST FAN MOTORS AND THE MAKE-UP AIR FAN. NOTE: FIRE WRAP MUST BE INSTALLED WITH IN THE ENCLOSED 7 5� <br /> CEILING AND CONTINUE TO THE TOP OF THE ROOF CURB <br /> HOODS, GREASER REMOVAL DEVICES, EXHAUST FANS, AND DUCTS SHALL HAVE A CLEARANCE OF NOT LESS <br /> THAN 18 TO COMBUSTIBLE MATERIAL. <br /> FIRE WRAP MATERIAL : 3M 615+ (PER UL LISTING 90G9 AND ICC ESR-1255) <br /> MAKE-UP AREA EXHAUST FAN <br /> CAPTIVE AIRE 00 <br /> CAPTIVE AIRE 1.. Fire Wrap Installation Note: M <br /> FRIGKING 650 FD 1U�-U" NCA 24 HPFA GREASE DUCT SLOPE 4 PER FT p Note: Duct to be telescoping to <br /> PARADET 48" THE FIRE WRAP MUST EXTEND A I.D. GREASE DUCT I.D. � <br /> 3M DUCT MINIMUM OF 18"ABOVE THE ROOF INSIDE SECTION GREASE DUCT or bell -t e er CMC 510.2.2 <br /> SEE DETAIL 1 1/4 x 1 1/4 ANGLE IRON WELDED 1. The installation shall be done by factory certified installer. type p <br /> ( ) AND OTHER COMBUSTIBLE MALE END Q <br /> 16-GAUGE GALV z TO EXHAUST DUST ON BOTH SIDES MATERIALS WELD AROUND 2� The fire wrap protection to be start from the hood continuous to the top of roof curb. U <br /> HOOD DUCTING &SECURED TO ROOF CURB WITH# WELD ARGUN 3.The welding of the duct shall be first inspected and with signed approval b the mechanical <br /> 1 N 14x2"SCREW.(2 EACH) 3M FIRE WRAP g P g PP Y <br /> 16-GA.GALV. <br /> SLOPE 4"PER FT METAL DUCTING inspector prior the installation of the fire wrap. Z Q <br /> ROOF TOP (GREASE BOX ROOF TOP ROOF TOP I.D.+0.25" 0 U <br /> ¢ Q W <br /> 1/2"THREADED ROD (E)DEMISING WALL L O <br /> _ <br /> CLEAN-OUT SECURED TO CEILING N Telescoping Bell -Type N <br /> OUTSIDE SECTIONFEMALE END U) <br /> .25"- cy) <br /> �DIFFUSE CEILING FINISH CEILING FINISH INSTALL S/S METAL VAPORPROOF LIGHT 16-GAUGE <br /> IN KITCHEN ? FLASH AROUNDan ALUMINUM FILTERS D LLI I- C <br /> ON TOP OF HOOD IF LLJ <br /> BLACK IRON NOTE. 7 N L0 <br /> THIS SPACE IS LESS BAFFLE TYPE at 45° Z <br /> F-1 17=771 17=771 1777771 F�- L BY FIRE CHIEF U) ^ Z <br /> O 6"AIR SPACE <br /> 16' UL HOOD STAINLESS STEEL N THE HOODS GREASE REMOVAL DEVICES EXHAUST FANS AND w o U) <br /> HOOD,20-GAUGE WALL STUD XSCRESECURE HOOD TO W8 H NOTE: N.ODUCT SIZE STAYS THE SAME THROUGHOUT DUCTS SHALL HAVE A CLEARANCE OF NOT LESS THAN 18" TO LJJ � Lu 0I <br /> 00" x3"MIN.HEX SCREWS. 1. DUCT SIZE DECREASES (GOING UPWARD) <br /> 6' 6' 6" THE DUCT SYSTEM. � � > <br /> o HOOD SPRINKLER � WITH EACH TELESCOPE. n 1n Z <br /> \ GREASE COLLECTOR COMBUSTIBLE MATERIAL, 3 TO LIMITED-COMBUSTIBLE o F- <br /> o to have separate permit 4'-0" 2. SMALLER (INSIDE) DUCT SECTION S ALWAYS 2. SMALLER (INSIDE) MALE DUCT IS ALWAYS �� LU 7- J <br /> S/SWALLPANEL ABOVE OR UPHILL (ON SLOPED DUCT), TO BE ABOVE OR UPHILL (ON SLOPED DUCT), TO BE MATERIAL, AND 0 TO NONCOMBUSTIBLE MATERIAL. Q Q <br /> - NIGH X 23'MIN. SELF-DRAINING INTO LARGER OUTSIDE DUCT. SELF-DRAINING INTO LARGER (OUTSIDE) FEMALE U <br /> DUCT END. W <br /> CD LRJ1 GAS COOKING CD <br /> 0o GRIDDLE [EQUIPMENT,oTELESCOPING DUCT JOIST BELE-TYPE DUCT JOIST <br /> _ floor plan on sht.A-2) <br /> D/F D/F <br /> i M <br /> W/T STAND WOK STOCK <br /> ROT I QUARRY TILE COVE BASE <br /> FLOOR FINISH FLOOR FINISH 3/8"x 6"HIGH <br /> GREASE DUCT JOINT DETAIL <br /> VEQUIPMENT LAYOUT 4 <br /> O <br /> (refer to FLOOR PLAN on NO SCALE <br /> N <br /> LO <br /> 16' UL HOOD & A-2) HOOD SIDE VIEW & MOUNTING Q <br /> EQUIPMENT ELEVATION DETAILS (TYP'L FOR TYPE-1 HOOD) Z U <br /> 3M Fire Barrier Duct Wrap 615+ Commercial Q o <br /> Kitchen Grease Duct Systems (Figure 3) �2 <br /> Field-Fabricated 2-Hour Access Door System U <br /> Q O <br /> 4 HOOD SUPPORT FABRICATEDi 3 1. Access hole <br /> OF Q11/2"STEEL ROD BOILT <br /> SEE DETAIL 4 x3 x/6 ANGLE 1 CE <br /> TO (E)ROOF FRAMING PLATE 2. 1/4" (6.35mm) dia. by a minimum LLQ 0 <br /> MIN. 6 EA REQUIRED ROOF A35 CLIP 1/2" 3 1/2" 6" (152.4mm) alt-threaded rods <br /> (N)4xBLOCKIN 05/8"LAG SCREW W/ 3. Access door cover - 16 gauge � <br /> h 5 O z <br /> 3"MIN. PENETRATION 4. Insulation pins (impaling pins)-welded (optional) 6 Lu <br /> TO WOOD STUD WALL 3 ° 7 Z Q <br /> ° " (E) ROOF 5. First layer 3M Fire Barrier Duct Wrap 615+ with <br /> JOIST TYP. cut same size as cover 1 ° ° 8 W LU <br /> SEE DETAIL 2 SIMPSIO 2x6 MIN. 6. Second layer 3M Fire Barrier Duct Wrap 615+ 0 m <br /> 2x JOIST TO MACH (E), Q <br /> 3 SEE DETAIL "HU" HANGER with 1 (25.4mm) overlap on all sides 0 O <br /> CID <br /> ° ° ° 7. Third Lauer 3M Fire Barrier Duct Wrap 615+ with o CL Co <br /> 3%,OX1%" 1/2"0 THREADED ROD with 1" (25.4mm) overlap on all sides <br /> A35 CLIP LAGSCREW PER SECTION 10 <br /> 8. Speed clips (optional) <br /> CEILING 3"MIN. (4 MIN.) SISTERED (N) 2X6 TO (E) 2X6 ROOF JOISTS 11 <br /> 22 GA. METAL DOUBLE STUD W/10D @ 12" O.0 AND PROVIDE A35 CLIP EACH 9. Aluminum tape covering all exposed edges HOOD DETAILS <br /> FLASHING AT SEISMIC ANCHORAGEEND TO (E) SUPPORTING BEAM 10. 4" (102mm) long steel hollow tubing to fit threaded rods Note: System integrity is limited by quality of installation. Consult current NOTES <br /> independent testing laboratories (e.g. Intertek, UL) for Design or System <br /> r2___� HODD SUPPORT 11. 1/4" (6.35mm) diameter wing nuts Details. In all four overlap techniques, the perimeter overlap can occur at <br /> NO SCALE 4 H O D D SUPPORT- and 1/4" (6.35mm) washers any location on the duct. <br /> S.S. _ KITCHEN HOOD NO SCALE \��� Vp <br /> ASoygF � <br /> LING 3M Fire Barrier Duct Wrap 615+ Commercial <br /> Note: System integrity is limited � � <br /> Kitchen Grease Duct Systems (Figure 3A) by quality of installation. Consult No. <br /> Pre-Fabricated 1- or 2-Hour Access Door System current independent testing s-3o-21 <br /> laboratories (e.g. Intertek, UL) for s Civic �P <br /> 1/2"STEEL ROD BEYOND 1. Access hole Design or System Details. In all four TgTF OF CA���°�� <br /> FLOOR /8 Q1x1%2° overlap techniques, the perimeter <br /> PLATE WASHER W/ NUT LAGSCREWS 2. 1/4 (6.35mm) dia. by a minimum p q <br /> 4"x3"x3/6" ANGLE 6" (152.4mm) alt-threaded rods overlap can occur at any location on <br /> \_-COOKINGAPPLIANCE (4 MIN.) PLATE the duct. <br /> 3. 3M Fire Barrier Grease Duct Access Door Designed by : T.W <br /> LATERAL BRACING 1/2" Or Ductmate ULtimte Door 0 <br /> 01/4"STEEL CABLE 4. Insulation pins (impaling pins)-welded 1 Date : Oct 5, 2020 <br /> @ 45° TYP. 1 2" 5. First layer 3M Fire Barrier Duct Wrap 615+ with 3 <br /> (E) ROOF 1" (25.4mm) overlap beyond access on all sides � 0 Scale : AS SHOWN <br /> ° <br /> CONNECT TO 3' JOIST TYP. 6. Second layer 3M Fire Barrier Duct Wrap 615+ with OPTION 1 (IMPALING PINS) <br /> ° E 101 HANGING ANGLE HAGING ANGLE TYP. SIMPSION2x JOIST TO MACH (E), cut to same size first later 5 6 Drawn : W.P.D. <br /> HOOD HU" HANGER 112" <br /> 2 2x6 MIN. ° <br /> 7. Third Lauer 3M Fire Barrier Duct Wrap 615+ with 0 ° °° 1 If <br /> 0 0 0 1/2"0 THREADED ROD 1" (25.4mm) overlap beyond second layer on all sides 8 ° ° IF Job <br /> H O D D SUPPORT-2 PER SECTION 8. Speed clips ° ° ° ° OPTION 2(CUP-HEAD PINS) 10 <br /> ° ° 5 6 SHEET <br /> HOOD SUPPORT NO SCALE 9. Aluminum tape covering all exposed edges g 4 ° ° ° 7 <br /> TYP.(6 EA) <br /> 10. 1/4" (6.35mm) diameter wing nuts <br /> HOOD TOP VI EW and 1/4" (6.35mm) washers 1 ° ° ° ° ° <br /> NO SCALE 4 HODD SUPPORT- 40 M = 1 <br /> 11. Insulation pins (cup-head pins) - welded ° <br /> NO SCALE 12. Access door cover-16 gauge cut same size as third layer of duct wrap 2 ° <br /> KITCHEN HOOD SUPPORT DETAIL with clearance holes to match pattern of all thread rods OF SHEETS <br /> NO SCALE 43M Fire Barrier Duct Wrap <br />