Laserfiche WebLink
1400 E. Victor Rd, Lodi, CA 95240 PR0529108 <br /> 10/14/2021 Program: APSA <br /> PHOTO 1: <br /> SPCC Ian states that a spill kit is located near the compactor, a spill kit was not observed at this location. <br /> •Drums are delivered full(filled off site). <br /> •Oil transfers are to be monitored by <br /> Facility personnel. <br /> •Containers visually inspected for leaks <br /> monthly. <br /> •Drums are typically stored in the Truck <br /> Various Shop,Boiler Room,or Chermical Berm. <br /> Oils and Adequate secondary containment with <br /> 55 9 drums approximately 5,460 gallons*is <br /> Lubricants provided by the Chemical berm. <br /> (up to 495 gal.) Adequate secondary containment for <br /> drums in the Truck Shop and Boiler <br /> Room is provided by the OWS with <br /> approximately 3,119 gallons*. <br /> •Facility personnel are to be trained in <br /> spill response measures. <br /> •Adequately sized spill kits are to be <br /> located in the Chemical Berm and near <br /> the Truck Shop and Boiler Room. <br /> •The drum is filled on site. <br /> •Oil transfers are to be monitored by <br /> Facility personnel. <br /> Oil Solids -Visually inspected for leaks monthly. <br /> 55 1 drum • Drum is typically stored on the Sump <br /> (up to 55 gal.) grate of the OWS with an approximate <br /> volume capacity of 3,119 gallons*. q <br /> • Facility personnel are to be trained in <br /> spill response measures. <br /> •Adequately sized spill kit is to be <br /> Compactor° located near the drum. <br /> •Compactor is to be visually inspected <br /> for leaks weekly. <br /> Hydrualic Compactor •The Compactor is located on concrete. <br /> 165 . Facility personnel are to be trained in <br /> Oil (up to 165 gal.) <br /> spill response measures. <br /> •Adequately sized(i.e.leaks)spill kit is <br /> to be located near the Compactor. <br /> Pad-Mounted Electric Transformers(PMTs)c <br /> • Transformer is to be visually inspected <br /> Non-PCBfor leaks weekly. <br /> Transformer . The electric transformer is located on a <br /> Insulating 502 (ET-1) concrete pad and surrounded by gravel. <br /> Oil * Facility personnel are to be trained in <br /> (up to 502 gal.) spill response measures. <br /> •Adequately sized(i.e.leaks)spill kit is <br /> to be located near the Transformer. <br /> Spill Prevention,Control and Countermeasure Plan 3 0� ) <br /> Dart Container Corp.ojLodi <br /> VICKY VANG-LEE, EHS Page 1 of 5 <br />