My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1400
>
2800 - Aboveground Petroleum Storage Program
>
PR0529108
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 9:08:37 AM
Creation date
10/21/2021 9:35:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0529108
PE
2832
FACILITY_ID
FA0003704
FACILITY_NAME
DART CONTAINER CORP
STREET_NUMBER
1400
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04932015
CURRENT_STATUS
01
SITE_LOCATION
1400 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is the primary tank free of water or has another preventative measure been taken? <br /> 4 NOTE: Refer to paragraphs 6.19 and 6.19 of the standard for altematives for Category 1 ees o No ❑ NIA <br /> tanks.NIA is only appropriate far these alternatives. <br /> 5 For double-wall or double bottom tanks or CE-AM, is interstitial monitoring equipment /Yes ❑ No ❑NIA <br /> (where applicable)in good working condition? <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs,is interstice free of liquid? YeS ❑No u NIA <br /> Remove the liquid if it is found.If tank product is found,investigate possible leak. Y <br /> Equipment on tank <br /> If overfill equipment has a"test"button,does it activate the audible hom or light <br /> 7 to confirm operation?if battery operated,replace battery if needed. YeS ❑ NO ❑NIA <br /> 8 Is overfill prevention equipment in good working condition?If it is equipped with aVOS ❑Na ❑ NIA <br /> mechanical test mechanism,actuate the mechanism to confirm operation. owes <br /> 9 Is the spill container(spill bucket)empty,free of visible leaks and in good working <br /> condition? /Yes inNO ❑ NIA <br /> 10 Are piping connections to the tank(valves,fittings,pumps,etc.)free of visile leaks? ;Oyes ❑No <br /> Note:if'70; identify location and describe leak �` (D <br /> 11 Do the ladders/pladbrms/walkways appear to be secure with no sign of severe corrosion CD <br /> 0 <br /> or damage? /Yes ❑ NO C1 NIA <br /> Containment(Dikingllmpounding) <br /> Q <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,fire hazards andr,•�1/es ❑No :3 NIA <br /> other integrity issues? f ' <br /> 13 Are dike drain valves closed and in good working condition? ,�Y-S ❑No ❑NIA <br /> 00 <br /> 14 Are containment egress pathways clear and any gatesfdoors operable? /Yes ❑ No ❑ NIA IV <br /> C) <br /> Concrete Exterior AST(CE-AST) N <br /> 15 Inspect all sides for cracks in concrete. Are there any cracks in the concrete exterior larger o Yes o ❑NIA <br /> than 1/16"? <br /> 16 Inspect concrete exterior body of the tank for cleanliness,need of coating,or rusting where ❑No ❑ NIA <br /> applicable. Tank exterior in acceptable condition? <br /> Visual inspect all tank top openings including nipples,manways,tank top overfill containers, <br /> 17 and leak detection tubes. Is the sealant between all tank top openings and concrete intact VYes ❑No ❑ NIA <br /> and in good condition? <br /> Other Conditions <br /> Isthe system free of any other conditions that need to be addressed for <br /> 1t3 continuedsafeoperation? :3 NO <br /> Monthly Checklist Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.