My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015 TRANSFER & PROCESSING RPT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOVELACE
>
2323
>
4400 - Solid Waste Program
>
PR0440013
>
ARCHIVED REPORTS_2015 TRANSFER & PROCESSING RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 9:14:19 AM
Creation date
10/21/2021 9:49:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015 TRANSFER & PROCESSING RPT
RECORD_ID
PR0440013
PE
4445
FACILITY_ID
FA0001434
FACILITY_NAME
LOVELACE TRANSFER STATION
STREET_NUMBER
2323
STREET_NAME
LOVELACE
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20406020
CURRENT_STATUS
01
SITE_LOCATION
2323 LOVELACE RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />Monitoring Schedule: As Encroachment Permit Applications are filed; and <br />as reflected in Public Works Capital Improvements <br />Program <br />Agency responsible for Public Services Division <br />Ensuring Compliance: San Joaquin County Department of Public Works <br />Reporting Requirements: Review of Encroachment Permit Applications; annual <br />Capital Improvement Program <br />Alternate Measure <br />Mitigation Measure No. 5�3: Widen critical roadway segments on French Camp <br />RoaTand Airport Way to four travel lanes. (Cumulative Impact) <br />Monitoring Agency: Traffic and Transportation Engineering Division <br />San Joaquin County Department of Public Works <br />Monitoring Schedule: As reflected in the Public Works Capital <br />Improvement Program <br />Agency responsible for San Joaquin County Department of Public Works <br />Ensuring Compliance: <br />Reporting Requirements: Annual Capital Im rovement Program as approved <br />by the San f oaquin County Board of Supervisors <br />ote: Measure No. 5-2 or Measure No. 5-3 should be implemented. <br />Mitigation Measure No. 5-4: The project proponent should reconstruct that portion <br />of Lovelace Road along the project frontage so that a two-way left turn lane (center turn <br />lane) can be added <br />Monitoring Agency: Public Services Division <br />San Joaquin County Department of Public Works <br />Monitoring Schedule: Based on warrants established by the Traffic and <br />-Transportation Engineering Division of the San <br />Joaquin County Department of Public Works <br />Agency responsible for San Joaquin County Department of Public Works <br />Ensuring Compliance: <br />Reporting Requirements: Improvement Plan approval, inspection and Noti <br />ce of <br />Completion <br />Mitigation Measure No. 5�5: A procedure should be established to provide for the <br />cleanup of waste spills due to traffic accidents associated with the Transfer Station. <br />(Refer to Appendix S of the Final EER) <br />Tonitoring Agency: _Office of Emergency Services <br />San Joaquin County <br />MMP: 7--6-93 B-2 Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.