My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084184_SSCRPT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COMSTOCK
>
14351
>
2600 - Land Use Program
>
SR0084184_SSCRPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 11:50:49 AM
Creation date
10/27/2021 11:03:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCRPT
RECORD_ID
SR0084184
PE
2603
STREET_NUMBER
14351
Direction
E
STREET_NAME
COMSTOCK
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09102036
ENTERED_DATE
9/7/2021 12:00:00 AM
SITE_LOCATION
14351 E COMSTOCK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructions to County Agricultural Commissioners on Rice <br />Pesticide Permit Issuance, Continued <br />General Information <br />New A new Thiobencarb product — League® MVP Herbicide, EPA Reg. No. <br />Thiobencarb 59639 -189 -AA, a granular formulation — is registered for use on rice for the <br />product— 2014 rice pesticide use season. Its active ingredients are 10% Thiobencarb <br />League® MVP and 0.43% Imazosulfuron. Please note that the new product has the same <br />water holding period as Bolero UltraMax — 30 days — and the Thiobencarb <br />recommended permit conditions apply to the new product. <br />Malathion CVRWQCB has approved a water management practice for malathion <br />water applied to rice that will help meet water quality performance goals for <br />management malathion in surface water. Malathion is currently not a restricted material <br />recommenda- and not subject to permit conditions. However, it is important that growers <br />tions comply with the following water management practice: <br />• All water from fields treated with pesticides containing malathion <br />should be retained on the site of application or contained within a <br />tailwater recovery system, or other system, adequate to prevent <br />discharge to waters of the State for at least four days following <br />application. <br />Storm Event The Communication Plan developed by the Storm Event Work Group will be <br />Work Group utilized in the event of a severe storm occurrence. The Storm Event Work <br />Group will continue to meet as needed. Currently, the work group is <br />comprised of staff from the Regional Water Board, DPR, University of <br />California, a reclamation district representative, CACs, and the rice industry. <br />The California Rice Commission will take the lead in facilitating this group. <br />Continued on next page <br />(Rev. 5-14) D-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.