My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
730
>
1600 - Food Program
>
PR0547122
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 12:00:53 PM
Creation date
10/28/2021 11:59:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547122
PE
1635
FACILITY_ID
FA0026730
FACILITY_NAME
LOS AGUACATEROS #4TU3146
STREET_NUMBER
730
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14723003
CURRENT_STATUS
01
SITE_LOCATION
730 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
800-818-3201 <br />PIX tubing technical specifications and general installation practices <br />Sign In I Check Order status I Contact Us <br />FREE SHIPPING Enter Part= or keyword <br />ON ORDERS OVER $99 <br />PEX SUPPLIES HEATING SUPPLIES PWt"L31NG SUPPLIES PUMPS VAL'v E5 FI I -i ING: H'vhG it <br />Home PEX Tubing Technical SpecVications and General Installation Recommendations <br />PEX Tubing Technical Specifications and General Installation Recommendations <br />Since all PEX tubing used in the US is manufactured to the same ASTM and dimensional (SDR) standards, these specifications are universal. <br />Manufacturing tolerances and other details can be found in manufacturers' manuals. <br />Dimensional data and specifications <br />033 <br />11500' O -u aa)" ODS <br />I I 0.75(" <br />0.625" (OD) <br />IDD) <br />WALL WALL WALL <br />3/8" 1/2" 5/8" <br />1125 <br />0.677 ' 0.681" f00) <br />lot)) (w) <br />0.097" <br />WALL <br />3/,' <br />poi <br />1" <br />WALL <br />PDC Tubing size <br />(CTS/Nominaq <br />Outside Diameter <br />(OD) <br />Minimum wall thickness <br />Inside Diameter <br />(ID) <br />Volume gaV100ft <br />Weight lbs/100ft <br />3/8' <br />0.500" <br />0.070" <br />0.360" <br />0.50 <br />4.50 <br />1/Y <br />0.625" <br />0.070" <br />0.485" <br />0.92 <br />5.80 <br />518" <br />0.750" <br />0.083" <br />0.584" <br />1.34 <br />8.38 <br />3/4" <br />0.875" <br />0.097" <br />0.681" <br />1.83 <br />11.00 <br />1' <br />1.125" <br />0.125" <br />0.875' <br />3.03 <br />17.06 <br />- Numbers are approrimala as per ASTM requirements. Dimensional data is subject to manNaMudng tawrances and may vary or omno. same oma app as win to oxygen oamer <br />and non -banner PIX. <br />Notes: <br />1. PEX tubing sizes are denoted by CTS (copper tubing size), not OD (Outside Diameter) or ID (Inside Diameter). <br />2 OD of PEX, copper and CPVC pipe with the same size (CTS) is the same. This is why push fittings can be used with all of these pipes. <br />3. PDC made to US standards must comply with a SDR -9 (Standard Dimension Ratio), which is the ratio of OD (Outside Diameter) to pipe wall thickness <br />(9:1). Exceptions are nominal sizes 112" and below. <br />Pressure ratings, testing and pressure drop <br />PEX Tubing <br />Pressure testing - Hydropic 8 Radiant Heating <br />Pressure testing -Hot 8 Cont Water Plumbing <br />Pressure Ratings <br />200'F at 80 psi <br />3 times the maximum working pressure or a minimum of 40 <br />1.5 times the maximum working pressure but no greater than pipe's <br />180"F at 100 psi <br />psi, but no greater than 100 psi. <br />pressure rating at given temperature. <br />74'F at 160 psi <br />Duration: 30 minutes minimum, 2 hours recommended <br />Duration: 30 minutes minimum, 2 hours recommended <br />Notes: <br />1. Maximum working pressure indicates highest anticipated operating pressure. <br />2. Pressure testing requirements and procedures should be in compliance with local codes and PEX manufacturer's instructions. <br />3. Air pressure testing is recommended over water for practical reasons and due to difficulties arising from water freezing during winter months. <br />4. Since PEX is a flexible pipe, it will expand somewhat (espedally PEX-a) during the initial pressurizing of the system, causing a drop in pressure reading. <br />Some manufacturers recommend "conditioning of the system, or allowing the PEX system to stay pressurized for about 30 minutes prior to taking a <br />reading. <br />5. For concrete slabs, pressure is maintained at 30 psi during the pour and is monitored to assure integrity of the system. <br />file:///C:/Users/Fafima/Desklopipex.htmi 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.