Laserfiche WebLink
Sacramento Paeaie Dependent Concrete,Inc. <br /> 5421 Stationers Way <br /> I w r-> I�.'. decameter,CA 95842 <br /> v (916)348-1200 <br /> �.. O7 <br /> EAGAL LAKES - -TRACY,CA 0 <br /> DATERIME 9/28/20209:38 OWNER/GC AL TOCCOU CONSTRUCTION 20-1108 N <br /> STORES PHONE- SBA N 2012750 O <br /> NAMEIDIVISION EAGAL LAKES PM AL TOCCOU N <br /> SCOPE OF WORK FLOORING PHONE 209.639}608 BID SET 7%0/2020 I--1 <br /> ADDRESS 12 W.LORON2EN RD EMAIL TOCCOQ@MSN.COM ADDENDUM O <br /> SPACES POLI CONTACT INFORMATION DELTA 00 <br /> CITY TRACY ESTIMATOR/PM ERIC HEDEGARD CONST TYPE RemodelEl 171 <br /> STATE LA DIRECT(808)4574230 WAGE RATE Non-Union D <br /> ICS CA 818796__________ __ _ __ EMAIL EHEDEGpRO@PACIFICOE00RATIVE.COM_______ _____BIO E%PIRE6 IV 7120209:38...... <br /> UNLESS OTHERWISE INDICATED-THIS PROPOSAL ASSUMES A CLEAN,FLAT CONCRETE SURFACE THAT IS FREE FROM ALL SETTING MATERIALS,ADHESIVES ORCOATINGS D <br /> OF ANY KIND.THIS INCLUDES CURING COMPOUNDS AND MINIMUM SURFACE DEFECTS SUCH AS SPALLS AND CRACKS. <br /> _ r <br /> _-_._._-_.—._-�............_ -_._._.._._._,..............ROJECT NORMATION -_-_........................._.......�......_......-.APPLICABLE DOOCUMENTS D <br /> OEBRIS DISPOSAL Forward By GC V 7[Z <br /> 480V POWER Provided By PDCI m <br /> WATER ACCESS Provided!By GC to <br /> LIGHTING Provided]By GC <br /> WAGES Our pmpwml InGudde standard wages and work hours,and assumes 10Hourwork shifts. <br /> SLAB CONDITION Bare Concrete <br /> WORKING HOURS Standard <br /> A <br /> n <br /> { <br /> I EXISITING AREA-SEE ATTACHED FLOOR PLAN n <br /> 5 D <br /> 6 <br /> e PRO60C0-GRIND CONCRETE her,40w/OVE 1,194 6F $8.50 910,063 <br /> 9 Mechanically <br /> approved sur ce prole slaty usin940b 00G meter bond diamond abrasives to ecbiese <br /> 10 Continue <br /> to hone <br /> oe preapesla <br /> 11 Cand edge nm ie cdncrere flat using150?2nsitiaaao100cess per <br /> minboMOlampntl <br /> 11 and edges lIPOe preparation for the staining randerepernormasper manulaation, a talions. <br /> Is Apply AM to hone con OVEdab using bond dune permaryinsou rerspelir�ralions. <br /> 14 cordnuemhone coecreleslabusiord hand diamond step,vee on bare rem <br /> 16 anb edger,whilewomatsof berUS GvRiUA Dina elmmew®rst provides step, <br /> 17 Install Complete <br /> coals of ss GUARD In diamond <br /> w8h reed misurer d,report <br /> i pori to a <br /> a Complete the ERI Tbyusingatllamo0tl imp20nmetl Nrister pad,aRuetl tea high speetl bumBher. <br /> COLOR:AMBER/TERRACOTTA <br /> la <br /> 30 <br /> to JOINT FILLER 126 LF E3.50 f438 <br /> x Chase,dean put,anb install Hl-TECH POLYUREA In all espension and conhol joinlm, <br /> zs per manufacturer specifications. <br /> 24 <br /> zs <br /> 26 PROTECTION OF WALLS b FIXTURES 1 EA $750.00 $750 <br /> z, PDO to hang/tape pteam rotMMn(areas may our nerd touch up pa int-by others) <br /> z8 <br /> z9 <br /> 30 <br /> 31 <br /> N MOBILE POWER 2 EA 9250.00 $300 <br /> 33 PDCI to bring generator <br /> 34 /fpovMed caked,power retie meet lire lolbuwnp. <br /> 39 1)480V 3 Phase.(50 AMP Breaker <br /> 37 <br /> 3e <br /> 35 <br /> 1. <br /> 41 <br /> 47 <br /> 44 <br /> THIS PROPOSAL EXCLUDES THE FOLLOWING: <br /> 4. 11.Remediation documents mommre imemalime iftne slab doesn'r meet he manufacturers system rmnatmn. <br /> 47 2).Moisture leat-9750.o01f forformed by POOL <br /> 4a 3).dmPing m arms,ramps or the,alaWt.a Overkill,-Addmonal at will apply O parlmeN by PDCI. <br /> ae 4).Eroverl slab remediallen,un-sound legacy flooring removal and or dracking of more Then 25 LF per ever 1 poo saFr <br /> So 51.Smhremetllahonoloti,gmasp.sealers,cunngcompounds dr other contrera contaminates. <br /> 11 5).TemperatureamtoThadin, reeling nr venulallon ohpape where Ouf weakkI1¢ng perfomlea. <br /> 11 7)Cleaning or proration of the final arodocl.once our contracted scope orwmk Is complete_ <br /> 53 <br /> 54 <br /> 55 <br /> 56 <br /> 57 <br /> Sm <br /> IoI <br /> co <br /> TOTAL BASE BID WITHOUT OPTIONS 1 Si <br /> STANDARD EXCLUSIONS-unless noted mbone in our proposatiscope of work: <br /> AI SLAB CONDITION:Water Pomfol Crack Notation Membranes,Eapanslen joint FIVSealents,Cleaning.Waring.Protecting of sunomodal and Vapuumin9,Myches,Bond and Alkalinity Testing.Moisture Retire ffludon. <br /> Scaffolding.Lifteg Equipment.Healers,E,denders Floor Preparation,Untletlayment.Leveling and Priming,Grout Coats.Glass 8 Sup Meter Testing,Post Inslaliailon churches,Llghring,and Dumpsterm ANY AND ALL <br /> FORMS AND MANNER OF PAID-IF-PAID CONTRACT CLAUSES. <br /> B)SLAB REMEDIATION:Clean,sPIM concrete aerosol who no coatings,Iodudlog moral coatings and wring sealers is assumed wife only inner patching required:defined as 15 putt bell size spellsrholes per 1,000 <br /> square feet.Patching beyond minor patching,mmoWVmplacoment of staining path work,any addiBonal work required Is eofa work beyond me base Idea. <br /> L)CONTROL JOINTS:When Joint Filler not excluded or pncotl separately:PDC will fill Y.inch or smaller saw-cut comer ideas that are in good repair with squared off shouldersgainers,control joins prior to filling Is core <br /> work beyond Ne base bM. <br /> STANDARD INCLUSIONS-unless named above In our propoeaUtcope of work: <br /> A)MOSILQATONS:Our proposal befuddle 1 tons)mobll@atmn.lf akfifional tops are nestled to minims ourspope,there will be an additional S2,500 charge proton. <br /> B)SEE CONDITIONS:GC to provMe 110 power,adequme tgfiting,antl dispeot of dah n, <br /> Owni Representative Printed Date <br /> Owrmini Representative Signature <br /> 'PDCI SHALL NOT BE REQUIRED TO PROVIDE ANY ADDITIONAL LABOR,EQUIPMENT OR MATERIALS UNTIL SUCH TIME AS THE GC HAS SIGNED AND DELIVERED WRITTEN <br /> CHANGE ORDER AUTHORIZING AND APPROVING SUCH EXTRA WORK <br />