Laserfiche WebLink
0 1111 Broadway.6th FI START DATE 11/20/2012 8:00:00 AM SHEET 2 OF 2 <br /> Geosyntec Oakland,CA 94607 FINISH DATE 11/20/2012 9:45:00 AM <br /> Tel:(510)836-3034 PROJECT Dopaco <br /> COTISI.11tc' nts Fax:(510)836-3036 LOCATION 800 W Church St,Stockton,CA <br /> PROJECT NUMBER WR1194 Elevation 5.81 FT.MSL <br /> Gs FORM:CORE3 10/00 LOG OF DMW-3 <br /> SAMPLES <br /> � C7 F o C7 <br /> DEPTH MATERIAL U i Z } Z TIMECOMMENTS <br /> (ft) DESCRIPTION 0 � Well o w w 0- <br /> m w Construction F o Lu n <br /> SOIL NAME(USCS SYMBOL):Color, Material O: U o <br /> Moisture,Grain Size and Percents e, m m <br /> Plasticity,Consistentyy/Density Other j0dor, a <br /> Lu <br /> Dry Strength,Wlineral Content) <br /> 5 GY 4/2),wet,50%medium sand,30%fine sand,20% <br /> non-plastic fines,loose. <br /> 0.0 09:12 <br /> 35 <br /> SILT(ML):dark grayish green(10 Y-5 GY 4/2),moist,100% <br /> non-plastic fines,stiff. <br /> 40 Total Depth=40 ft bgs <br /> M <br /> F <br /> ❑ <br /> U <br /> H <br /> z <br /> U <br /> O <br /> a <br /> 0 <br /> 0 <br /> ❑ <br /> z <br /> Q <br /> J <br /> Y <br /> Q <br /> O <br /> J <br /> CONTRACTOR Gregg NORTHING 2167556.630 REMARKS:Well screened from 30-40 ft bgs.Samples every 5 ft to 25 ft, <br /> EQUIPMENT Marl Mil EASTING 6330008.200 then continuous to 40 ft. <br /> °o DRILL MTHD Hollow Stem ANGLE Vertical <br /> J <br /> cD DIAMETER(in) 8" BEARING ------ <br /> E LOGGERTS REVIEWER CK PRINTED 01/15/13 COORDINATE SYSTEM: NAD83 <br /> 0 SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS <br /> m <br />