Laserfiche WebLink
Frewert Traffic Impact Study <br /> 5.4 INTERSECTION LEVEL OF SERVICE ANALYSIS-BACKGROUND PLUS PROJECT CONDITIONS <br /> This scenario is identical to Background No-Project Conditions, but with the addition of projected traffic <br /> from the proposed project.Trip generation, distribution, and assignment for the proposed project are <br /> identical to that assumed under Existing plus Project Conditions. Figure 7 shows projected turning <br /> movement volumes at all the study intersections under Background plus Project Conditions. <br /> The intersection LOS analysis results for Background plus Project Conditions are summarized in Table 7. <br /> Results of the LOS analysis under Background (No-Project) Conditions are included for comparison <br /> purposes. Under this scenario, all study intersections would continue to operate at acceptable LOS D or <br /> better during both peak hours, except the intersections at Roth Road/S. Harlan Road (Intersection#1) and <br /> Roth Road/1-5 Southbound Ramps (Intersection#3),which operate at LOS E and F during one or more <br /> peak hours.Appendix D contains detailed LOS analysis worksheets for Background plus Project <br /> Conditions. <br /> Table 7: Intersection Level of Service Analysis-Background plus Project Conditions <br /> Background Background plus <br /> ID Intersection Intersection Peak Conditions Project Conditions <br /> Control Hour' Average a Average 3 Change Significant <br /> Del0y2 LOS Delayz LOS in Delay4 Impact? <br /> 1 Roth Road&S Harlan AWSC AM 28.1 D 34,0 D 5.9 N <br /> Road PM 73.1 F 89.3 F 16.2 Y <br /> Mitigation:signalize Signal AM - 23 C -5.7 <br /> PM - 29.2 C -43.9 <br /> 2* Roth Road&1-5 One-WayStn AM 11.6 B 13.2 B 1.6 N <br /> Northbound Ramps p PM 13.4 B 17.1 C 3.7 N <br /> * Roth Road&t-5 AM 26.5 D 36.3 E 9.8 Y <br /> 3 One-WaSto <br /> Southbound Ramps y p PM 26.1 D 40.3 E 14.2 Y <br /> Mitigation:AWSC All-Way Stop AM 75.7 C -11.4 <br /> PM - 74.0 B -72.1 <br /> Roth Road&Manthey One-Way AM 12.4 B 15.3 C 2.9 N <br /> 4 Road y Stop PM 15.6 C 22.8 C 7.2 N <br /> Manthey Road& AM 11.2 B 14.9 8 3.7 N <br /> 5 Frewert Road One Way Stop <br /> PM 12.9 8 23.6 C 10.7 N <br /> Frewert Road&Project One WaAM - 8.7 A N <br /> 6 Access#1 y 5tap PM 8.8 A N <br /> 7 Frewert Road&Project One-WayStn AM 8.5 A N <br /> Access#2 P PM 8.6 A N <br /> Notes: <br /> 1,AM-morning peak hour,PM-evening peak hour <br /> 2.Whole intersection weighted average control delay expressed in seconds per vehicle for all-way stop controlled intersections. <br /> Total control delay for the worst movement is presented for side-street stop-controlled intersections. <br /> 3.LOS=Level of Service <br /> 4.Change in average delay between Existing and Existing plus Project Conditions.Average delay may be reduced with the addition <br /> of project traffic to non-critical movements. <br /> Bold indicates unacceptable operational conditions based on applicable jurisdictional standards. <br /> Impact Findings <br /> The project impact to the intersections of Roth Road/S. Harlan Road (Intersection #1) and Roth Road/1-5 <br /> Southbound Ramps(Intersection#3) are significant because the project adds five or more seconds of <br /> Page 124 <br /> TJKM <br />