My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014455
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
212
>
2600 - Land Use Program
>
PA-2100228
>
SU0014455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 7:35:14 AM
Creation date
11/2/2021 10:16:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014455
STREET_NUMBER
212
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
APN
19123011, 12, 14
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
212 W FREWERT RD
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Frewert Traffic Impact Study <br /> Table 14: 951h Percentile Queues at Turn Pockets Affected by Project Traffic <br /> # Study Lane Storage Background Project <br /> Background plus Change <br /> Intersections Group Length <br /> AM PM AM PM AM PM <br /> Roth Road/5. NBR 100 10 20 10 20 0 0 <br /> 1 Harlan Road EBL 105 20 20 20 20 0 0 <br /> Roth Road/1-5 NBTL 630 5 25 15 45 10 20 <br /> 2 Northbound <br /> Ramps EBL 360 10 5 10 10 0 5 <br /> Roth Road/1-5 SBLTR 520 45 45 65 70 20 25 <br /> 3 Southbound <br /> Ramps WBL 360 15 15 15 15 0 0 <br /> Roth WBL 160 25 30 50 80 25 50 <br /> 4 Road/Manthey <br /> Road WBR 155 5 15 5 15 0 0 <br /> Notes:Storage length and 95th percentile queue is expressed in feet per lane and rounded to nearest 5 feet interval <br /> Awl—morning peak hour,PM—evening peak hour <br /> Bold indicates queue lengths exceeding capacity <br /> Queuing Analysis at Project Driveways <br /> TJKM conducted a vehicle queuing and storage analysis for at the project driveways under plus Project <br /> scenarios.The 95th percentile(maximum) queues were analyzed using the HCM 6th Edition methodology <br /> contained in Synchro software. Detailed calculations are included in the LOS appendices corresponding to <br /> each analysis scenario. <br /> Table 15 summarizes the 95th percentile queue lengths at the project driveways under all plus Project <br /> scenarios.At the Frewert Road driveways, queue lengths entering and exiting the project site remain <br /> below one vehicle length (one vehicle=25 feet)for both peak hours under Background plus Project and <br /> Cumulative plus Project Conditions.The queue calculations are included in the respective appendices for <br /> each plus Project scenario.As shown below, queue lengths at the proposed project driveways do not <br /> exceed capacity without and with the addition of project traffic.Thus, the proposed project does not <br /> create a significant impact by itself on the expected left-turn or right-turn queues at the project <br /> driveways. <br /> Table 15:Queueing for Study Intersections, in Feet <br /> Background plus Cumulative plus <br /> # Study Intersections Lane Group Project Project <br /> AM PM AM PM <br /> 6 Frewert Road/Project Access#1 NB 5 5 5 5 <br /> WB 5 5 5 5 <br /> 7 Frewert Road/Project Access#2 NB 5 5 5 5 <br /> WB 5 5 5 5 <br /> Notes:95th percentile queue is expressed in feet per lane,and rounded to nearest 5 feet interval <br /> AM—morning peak hour,PM—evening peak hour <br /> Bold indicates queue lengths exceeding capacity <br /> Page 137 <br /> TJKM <br />
The URL can be used to link to this page
Your browser does not support the video tag.