Laserfiche WebLink
HCM 6th TWSC Background Conditions <br /> 2: 1-5 NB Off Ramp & Roth Rd Timing Plan:AM Peak <br /> Intersection <br /> Int Delay,s)veh 2.8 <br /> Movement EBL EBT EBR W8L WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations ) ft T +T ?f <br /> Traffic Vol,vehlh 83 329 0 0 232 290 15 0 204 0 0 0 <br /> Future Vol,vehlh 83 329 0 0 232 290 15 0 204 0 0 0 <br /> Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized - None None - - None None <br /> Storage Length 0 - 630 - 0 <br /> Veh in Median Storage,# - 0 0 - 0 - 16965 <br /> Grade,% - 0 - 0 - 0 - 0 <br /> Peak Hour Factor 89 89 89 92 92 92 94 94 94 92 92 92 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 93 -370 0 0 252 315 16 0 217 0 0 0 <br /> MajorlMinor Majorl Major2 Minorl <br /> Conflicting Flow All 567 0 - 0 966 1123 185 <br /> Stage 1 - - - - 556 556 - <br /> Stage 2 - 410 567 - <br /> Critical Hdwy 4,13 - - - 6.63 6.53 6.93 <br /> Critical Hdwy Stg 1 - - - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - - - 5.43 5.53 - <br /> Follow-up Hdwy 2.219 - 3.519 4.019 3.319 <br /> Pot Cap-1 Maneuver 1003 0 0 267 205 826 <br /> Stage 1 - 0 0 539 512 - <br /> Stage 2 - 0 0 - - 669 506 - <br /> Platoon blocked,% <br /> Mov Cap-1 Maneuver 1003 - - 242 0 826 <br /> Mov Cap-2 Maneuver - 242 0 - <br /> Stage 1 - - 489 0 <br /> Stage 2 - - - - 669 0 <br /> Approach EB WB NB <br /> HCM Control Delay,s 1.8 0 11.6 <br /> HCM LOS B <br /> Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT WBT WBR <br /> Capacity(vehlh) 242 826 1003 <br /> HCM Lane VIC Ratio 0.066 0.263 0.093 <br /> HCM Control Delay(s) 20.9 10.9 9 <br /> HCM Lane LOS C B A - <br /> HCM 95th%tile Q(veh) 0.2 1.1 0.3 - - <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 2 <br />